With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovo...With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.展开更多
With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the c...With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the cost control of construction projects can be greatly improved[1].The use of this technology can not only reduce the project approval time but also improve the quality of the project.In addition,it can also help the construction personnel to solve the project changes,maintenance costs,insurance rates,and other related issues,so that the operation of the project is more efficient and economical.This paper will discuss the role of BIM technology in depth,and explore the advantages and disadvantages of each link through the research of the project,to provide a reference for the promotion of this new project.By constantly adjusting the application strategy,the goal is to meet the current market demand.展开更多
In modern enterprise management,strengthening the control and management of procurement processes can effectively reduce operational costs.However,with the continuous reform and improvement of China’s market economy ...In modern enterprise management,strengthening the control and management of procurement processes can effectively reduce operational costs.However,with the continuous reform and improvement of China’s market economy system,competition among supply chain enterprises has intensified.The traditional procurement management model is no longer able to meet the needs of enterprise development in the current era.As a result,procurement management based on supply chain management has emerged,offering significant improvements in the scientific management of procurement processes.It has become an important means of promoting the long-term development of enterprises.This paper primarily analyzes and studies procurement cost control based on supply chain management,providing insights for reference.展开更多
The rapid economic development has promoted the construction of infrastructure,such as highways and water conservancy projects.The establishment of highways has facilitated people's lives and made the distance bet...The rapid economic development has promoted the construction of infrastructure,such as highways and water conservancy projects.The establishment of highways has facilitated people's lives and made the distance between regions shorter and shorter.However,the construction of highway engineering is a big project,which not only has a long cycle,but also has a high economic cost.During the construction process,a large number of construction materials and personnel will be applied.If the project cost management is not implemented for the highway construction,it will easily affect the final quality and profit of the entire project.This article expounds the significance of dynamic management and control of highway engineering cost,and analyzes the strategy of dynamic management and control of highway engineering cost.展开更多
The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The ma...The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The main body of the construction project needs to strengthen the management and control of funds.In this regard,this paper analyzes the importance of cost management in highway projects by clarifying and analyzing the current cost management status quo problems and causes.The highway engineering cost control strategy and implementation methods are summarized to provide references for improving the quality of highway engineering.展开更多
With the continuous development of the economy, people' s income has increased significant and the number of its external travel is gradually increasing, so the hotel companies in China have set up around. However, t...With the continuous development of the economy, people' s income has increased significant and the number of its external travel is gradually increasing, so the hotel companies in China have set up around. However, the hotel companies do not pay attention to cost control then it cannot be in the fierce competition in the market to obtain long-term development. This paper will describe the cost control in the hotel financial management, emphasize the importance and function of cost control in hotel management, reveal the existing problems of hotel cost control, and actively explore the strategy of strengthening cost control.展开更多
The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the a...The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.展开更多
In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of...In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of the prefabricated construction industry is constantly accelerating.To effectively ensure the economic benefits of engineering projects,it is necessary to comprehensively strengthen cost budgeting and cost control.This article analyzes the cost budget of prefabricated construction projects,introduces the application advantages of prefabricated construction,and proposes specific cost budgeting and cost control measures,hoping to provide some reference for relevant researchers.展开更多
Uniqueness of landscaping projects was analyzed,and cost was regarded as an important index evaluating performance of landscaping construction enterprises. Based on reviewing limitation of cost control on landscaping ...Uniqueness of landscaping projects was analyzed,and cost was regarded as an important index evaluating performance of landscaping construction enterprises. Based on reviewing limitation of cost control on landscaping construction enterprises,enhancing construction management,controlling cost reasonably,and reducing project cost were proposed as the foundation and core content of enterprise cost management,and also the key to successful project management.By combining with design practices,suggestions for enhancing construction management of landscaping project,controlling cost and improving profits were given.展开更多
With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into th...With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into the stage of rapid development. The construction of water conserv ancy & hydropower engineering promotes social and economic development, so in order to safeguard the benefits of the engineering, cost management shall be done well, which is also an important channel for companies engaging in water conservancy & hydropower engineering to obtain economic benefits. Based on this the paper firstly investigates the problems in water conserv ancy & hydropower engineering cost management and then brings up relevant solutions.展开更多
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje...Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.展开更多
In recent years,China’s society and economy has been developing very rapidly,and various industries are showing a trend of vigorous development.The importance of control and management of project cost in highway proj...In recent years,China’s society and economy has been developing very rapidly,and various industries are showing a trend of vigorous development.The importance of control and management of project cost in highway project management is becoming more and more prominent.PPP model has been widely used in the control and management of highway project cost with its own unique advantages.The author analyzes the important advantages of the PPP model and the existing problems in the cost control and management of highway projects,and puts forward effective measures for the cost control and management of highway projects using the PPP model,in hope of helping with the smooth implementation of the work.展开更多
Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face...Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.展开更多
Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction sta...Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction stage of a highway.The effective development of cost management in the construction phase of highway engineering under the list pricing model can avoid unnecessary waste and help control the cost of highway engineering.However,there are still some problems in the development of cost management in the construction phase of highway engineering,which will affect the role of the list-based pricing mode in cost management.This paper explores and analyzes the advantages of the list pricing model and the problems existing in the cost management of the highway engineering construction stage under the list pricing model,and proposes effective management strategies to improve cost management of the highway engineering construction stage.展开更多
Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. T...Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. The most important thing for construction enterprises to improve market competitiveness is to reduce enterprise costs by decreasing resource consumption in the construction, and control the consumptions within the project budget.展开更多
Traditional inventory control methods generally emphasize minimizing costs. Under current thinking, we not only consider cost control, but also tie inventory management directly into production scheduling. This system...Traditional inventory control methods generally emphasize minimizing costs. Under current thinking, we not only consider cost control, but also tie inventory management directly into production scheduling. This system, called "Just-in-Time delivery", is based on having inventory arrive at the factory door just as it is needed on the assembly line. This inventory management technique of essential zero raw material inventory speeds inventory turnover rate and greatly reduces holding cost. This paper analyzes and compares all aspects related to both traditional and JIT systems, and explores ways of reducing inventory costs. The result is the elimination of waste, the speed-up of inventory turnover and the increase in productivity, all with the objective of maximizing profitability. Using advanced logistics (physical distribution methods) will enhance the business image, strengthen international competitive ability and contribute greatly to increase gross domestic product.展开更多
Utilization management plays a crucial role in healthcare by optimizing resource allocation,improving patient outcomes,and effectively controlling costs.By balancing patient needs with economic considerations,healthca...Utilization management plays a crucial role in healthcare by optimizing resource allocation,improving patient outcomes,and effectively controlling costs.By balancing patient needs with economic considerations,healthcare institutions can ensure efficient and sustainable service delivery.Utilization management encompasses various strategies,including prior authorization,concurrent review,and clinical pathways,to enhance care quality,manage expenses,and streamline resource use.The benefits of utilization management include cost containment,improved care standards,and the implementation of consistent treatment guidelines,thereby increasing the overall efficiency and effectiveness of healthcare delivery.展开更多
This paper describes the real-time and the importance of the study about e-commerce logistics cost management ,analyzes the development status of today' s e-commerce logistics and compares it with the traditional log...This paper describes the real-time and the importance of the study about e-commerce logistics cost management ,analyzes the development status of today' s e-commerce logistics and compares it with the traditional logistics, defines the e-commerce logistics cost management .Based on this, it summarizes the cost structure of e-commerce logistics, proposes factors affecting the cost of logistics, builds the basic ideas of logistics cost management, and thus introducts the accounting methods about logistics cost .Finally, puts forward to the content and methods of logistics costs budget, controling the cost effectively.展开更多
Facing the rapid development of economy and the increasingly fierce market competition, the role of logistics control is becoming far more important. Choosing the best way to play the role of logistics, improving over...Facing the rapid development of economy and the increasingly fierce market competition, the role of logistics control is becoming far more important. Choosing the best way to play the role of logistics, improving overall efficiency of the enterprise, reducing logistics cost and coping well with market competition, these things have great important practical significances. This article take hengtong transportation company as research object, giving the present situation of logistics cost and analyzing the causes of logistics cost increased year by year. At last, putting forward the concrete measures to realize better logistic control.展开更多
In the social development,bidding agency plays an important part,providing services for the development of construction project bidding,and endows the development of construction project bidding with a diversified cha...In the social development,bidding agency plays an important part,providing services for the development of construction project bidding,and endows the development of construction project bidding with a diversified characteristic.The cost management of a construction project bidding stage has a dynamic characteristic.The bidding agency can provide bidding related business for the construction enterprises to ensure the quality and the effect of the bidding service,leading to the foundation for the sustainable development of the construction enterprises.This paper analyzes the deficiency in the bidding agency,and cost management in the bidding stage of the construction projects,as well provide some effective countermeasures or recommendation,to improve the value,and the role of the bidding agency in managing and controlling the construction project cost within the scope allowed by the law,and regulations,and also to ensure the comprehensive benefits of construction projects for the construction enterprise.展开更多
文摘With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.
文摘With the rapid development of information technology,Building Information Modeling(BIM)technology has gradually occupied an important position in the construction industry.With the introduction of BIM technology,the cost control of construction projects can be greatly improved[1].The use of this technology can not only reduce the project approval time but also improve the quality of the project.In addition,it can also help the construction personnel to solve the project changes,maintenance costs,insurance rates,and other related issues,so that the operation of the project is more efficient and economical.This paper will discuss the role of BIM technology in depth,and explore the advantages and disadvantages of each link through the research of the project,to provide a reference for the promotion of this new project.By constantly adjusting the application strategy,the goal is to meet the current market demand.
文摘In modern enterprise management,strengthening the control and management of procurement processes can effectively reduce operational costs.However,with the continuous reform and improvement of China’s market economy system,competition among supply chain enterprises has intensified.The traditional procurement management model is no longer able to meet the needs of enterprise development in the current era.As a result,procurement management based on supply chain management has emerged,offering significant improvements in the scientific management of procurement processes.It has become an important means of promoting the long-term development of enterprises.This paper primarily analyzes and studies procurement cost control based on supply chain management,providing insights for reference.
文摘The rapid economic development has promoted the construction of infrastructure,such as highways and water conservancy projects.The establishment of highways has facilitated people's lives and made the distance between regions shorter and shorter.However,the construction of highway engineering is a big project,which not only has a long cycle,but also has a high economic cost.During the construction process,a large number of construction materials and personnel will be applied.If the project cost management is not implemented for the highway construction,it will easily affect the final quality and profit of the entire project.This article expounds the significance of dynamic management and control of highway engineering cost,and analyzes the strategy of dynamic management and control of highway engineering cost.
文摘The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The main body of the construction project needs to strengthen the management and control of funds.In this regard,this paper analyzes the importance of cost management in highway projects by clarifying and analyzing the current cost management status quo problems and causes.The highway engineering cost control strategy and implementation methods are summarized to provide references for improving the quality of highway engineering.
文摘With the continuous development of the economy, people' s income has increased significant and the number of its external travel is gradually increasing, so the hotel companies in China have set up around. However, the hotel companies do not pay attention to cost control then it cannot be in the fierce competition in the market to obtain long-term development. This paper will describe the cost control in the hotel financial management, emphasize the importance and function of cost control in hotel management, reveal the existing problems of hotel cost control, and actively explore the strategy of strengthening cost control.
文摘The whole-process project cost management based on building information modeling(BIM)is a new management method,aiming to realize the comprehensive optimization and improvement of project cost management through the application of BIM technology.This paper summarizes and analyzes the whole-process project cost management based on BIM,aiming to explore its application and development prospects in the construction industry.Firstly,this paper introduces the role and advantages of BIM technology in engineering cost management,including information integration,data sharing,and collaborative work.Secondly,the paper analyzes the key technologies and methods of the whole-process project cost management based on BIM,including model construction,data management,and cost control.In addition,the paper also discusses the challenges and limitations of the whole-process BIM project cost management,such as the inconsistency of technical standards,personnel training,and consciousness change.Finally,the paper summarizes the advantages and development prospects of the whole-process project cost management based on BIM and puts forward the direction and suggestions for future research.Through the research of this paper,it can provide a reference for construction cost management and promote innovation and development in the construction industry.
文摘In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of the prefabricated construction industry is constantly accelerating.To effectively ensure the economic benefits of engineering projects,it is necessary to comprehensively strengthen cost budgeting and cost control.This article analyzes the cost budget of prefabricated construction projects,introduces the application advantages of prefabricated construction,and proposes specific cost budgeting and cost control measures,hoping to provide some reference for relevant researchers.
文摘Uniqueness of landscaping projects was analyzed,and cost was regarded as an important index evaluating performance of landscaping construction enterprises. Based on reviewing limitation of cost control on landscaping construction enterprises,enhancing construction management,controlling cost reasonably,and reducing project cost were proposed as the foundation and core content of enterprise cost management,and also the key to successful project management.By combining with design practices,suggestions for enhancing construction management of landscaping project,controlling cost and improving profits were given.
文摘With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into the stage of rapid development. The construction of water conserv ancy & hydropower engineering promotes social and economic development, so in order to safeguard the benefits of the engineering, cost management shall be done well, which is also an important channel for companies engaging in water conservancy & hydropower engineering to obtain economic benefits. Based on this the paper firstly investigates the problems in water conserv ancy & hydropower engineering cost management and then brings up relevant solutions.
文摘Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.
文摘In recent years,China’s society and economy has been developing very rapidly,and various industries are showing a trend of vigorous development.The importance of control and management of project cost in highway project management is becoming more and more prominent.PPP model has been widely used in the control and management of highway project cost with its own unique advantages.The author analyzes the important advantages of the PPP model and the existing problems in the cost control and management of highway projects,and puts forward effective measures for the cost control and management of highway projects using the PPP model,in hope of helping with the smooth implementation of the work.
文摘Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.
文摘Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction stage of a highway.The effective development of cost management in the construction phase of highway engineering under the list pricing model can avoid unnecessary waste and help control the cost of highway engineering.However,there are still some problems in the development of cost management in the construction phase of highway engineering,which will affect the role of the list-based pricing mode in cost management.This paper explores and analyzes the advantages of the list pricing model and the problems existing in the cost management of the highway engineering construction stage under the list pricing model,and proposes effective management strategies to improve cost management of the highway engineering construction stage.
文摘Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. The most important thing for construction enterprises to improve market competitiveness is to reduce enterprise costs by decreasing resource consumption in the construction, and control the consumptions within the project budget.
文摘Traditional inventory control methods generally emphasize minimizing costs. Under current thinking, we not only consider cost control, but also tie inventory management directly into production scheduling. This system, called "Just-in-Time delivery", is based on having inventory arrive at the factory door just as it is needed on the assembly line. This inventory management technique of essential zero raw material inventory speeds inventory turnover rate and greatly reduces holding cost. This paper analyzes and compares all aspects related to both traditional and JIT systems, and explores ways of reducing inventory costs. The result is the elimination of waste, the speed-up of inventory turnover and the increase in productivity, all with the objective of maximizing profitability. Using advanced logistics (physical distribution methods) will enhance the business image, strengthen international competitive ability and contribute greatly to increase gross domestic product.
文摘Utilization management plays a crucial role in healthcare by optimizing resource allocation,improving patient outcomes,and effectively controlling costs.By balancing patient needs with economic considerations,healthcare institutions can ensure efficient and sustainable service delivery.Utilization management encompasses various strategies,including prior authorization,concurrent review,and clinical pathways,to enhance care quality,manage expenses,and streamline resource use.The benefits of utilization management include cost containment,improved care standards,and the implementation of consistent treatment guidelines,thereby increasing the overall efficiency and effectiveness of healthcare delivery.
文摘This paper describes the real-time and the importance of the study about e-commerce logistics cost management ,analyzes the development status of today' s e-commerce logistics and compares it with the traditional logistics, defines the e-commerce logistics cost management .Based on this, it summarizes the cost structure of e-commerce logistics, proposes factors affecting the cost of logistics, builds the basic ideas of logistics cost management, and thus introducts the accounting methods about logistics cost .Finally, puts forward to the content and methods of logistics costs budget, controling the cost effectively.
文摘Facing the rapid development of economy and the increasingly fierce market competition, the role of logistics control is becoming far more important. Choosing the best way to play the role of logistics, improving overall efficiency of the enterprise, reducing logistics cost and coping well with market competition, these things have great important practical significances. This article take hengtong transportation company as research object, giving the present situation of logistics cost and analyzing the causes of logistics cost increased year by year. At last, putting forward the concrete measures to realize better logistic control.
文摘In the social development,bidding agency plays an important part,providing services for the development of construction project bidding,and endows the development of construction project bidding with a diversified characteristic.The cost management of a construction project bidding stage has a dynamic characteristic.The bidding agency can provide bidding related business for the construction enterprises to ensure the quality and the effect of the bidding service,leading to the foundation for the sustainable development of the construction enterprises.This paper analyzes the deficiency in the bidding agency,and cost management in the bidding stage of the construction projects,as well provide some effective countermeasures or recommendation,to improve the value,and the role of the bidding agency in managing and controlling the construction project cost within the scope allowed by the law,and regulations,and also to ensure the comprehensive benefits of construction projects for the construction enterprise.