期刊文献+
共找到1,168篇文章
< 1 2 59 >
每页显示 20 50 100
Dynamic Management and Control Strategy of Highway Engineering Cost
1
作者 Caiyan Zhang 《Journal of Architectural Research and Development》 2021年第4期23-26,共4页
The rapid economic development has promoted the construction of infrastructure,such as highways and water conservancy projects.The establishment of highways has facilitated people's lives and made the distance bet... The rapid economic development has promoted the construction of infrastructure,such as highways and water conservancy projects.The establishment of highways has facilitated people's lives and made the distance between regions shorter and shorter.However,the construction of highway engineering is a big project,which not only has a long cycle,but also has a high economic cost.During the construction process,a large number of construction materials and personnel will be applied.If the project cost management is not implemented for the highway construction,it will easily affect the final quality and profit of the entire project.This article expounds the significance of dynamic management and control of highway engineering cost,and analyzes the strategy of dynamic management and control of highway engineering cost. 展开更多
关键词 HIGHWAY engineering cost dynamic management control strategy
下载PDF
Analysis of the Current Situation of Cost Management and Control of Highway Construction Projects
2
作者 Pei Liu 《Journal of Architectural Research and Development》 2024年第5期30-35,共6页
The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The ma... The highway engineering process is complex,coupled with a relatively long construction period,hence requires increased coordination between participating units to prevent economic disputes and efficiency losses.The main body of the construction project needs to strengthen the management and control of funds.In this regard,this paper analyzes the importance of cost management in highway projects by clarifying and analyzing the current cost management status quo problems and causes.The highway engineering cost control strategy and implementation methods are summarized to provide references for improving the quality of highway engineering. 展开更多
关键词 Highway engineering cost management management status cost control
下载PDF
Cost Management and Cost Control of Photovoltaic Projects
3
作者 Weimin Lv 《Journal of Architectural Research and Development》 2024年第4期63-70,共8页
With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovo... With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry. 展开更多
关键词 Photovoltaic engineering cost management cost control
下载PDF
Study on Ways to Improve Economic Benefits by Strengthening Cost Management
4
作者 Zhu Hongchang 《China's Foreign Trade》 2011年第7期68-70,共3页
Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. T... Engineering project management refers to the management through the whole process of engineering construction, including quality, time project time limit, safety, cost, environmental protection, and innovation, etc. The most important thing for construction enterprises to improve market competitiveness is to reduce enterprise costs by decreasing resource consumption in the construction, and control the consumptions within the project budget. 展开更多
关键词 cost management engineering project management cost control risk control ways tocontrol
下载PDF
市政工程造价管理中动态成本控制的应用研究
5
作者 莫楠楠 《工程建设与设计》 2025年第2期222-224,共3页
针对市政工程造价中的成本控制问题,提出了一种基于动态成本控制的管理方法,通过控制人工成本、机械成本和材料成本,制订不同的方案,解决了市政工程造价管理中的问题,实现了成本支出的有效控制。研究结果表明,动态成本控制不仅可以节省... 针对市政工程造价中的成本控制问题,提出了一种基于动态成本控制的管理方法,通过控制人工成本、机械成本和材料成本,制订不同的方案,解决了市政工程造价管理中的问题,实现了成本支出的有效控制。研究结果表明,动态成本控制不仅可以节省成本支出,还能灵活、及时地应对工程实施期间出现的各种变化。 展开更多
关键词 市政工程 造价管理 动态成本控制 目标成本
下载PDF
Thinking substation construction project management methods
6
作者 HU Wenmin 《International English Education Research》 2015年第10期21-23,共3页
One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e... One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control. 展开更多
关键词 SUBSTATIONS construction project management cost control BIDDING civil engineering
下载PDF
建筑工程成本控制的关键技术与方法探讨
7
作者 韩武頔 丁鹏斐 《建筑与装饰》 2025年第2期84-86,共3页
在建筑行业中,传统成本控制方法已难以满足对高效率和精确性的需求。本研究通过案例分析法探讨了建筑信息模型(BIM)、价值工程、合同管理及信息化手段在优化设计、提升决策质量和资源利用效率方面的作用。结果表明,这些技术的综合应用... 在建筑行业中,传统成本控制方法已难以满足对高效率和精确性的需求。本研究通过案例分析法探讨了建筑信息模型(BIM)、价值工程、合同管理及信息化手段在优化设计、提升决策质量和资源利用效率方面的作用。结果表明,这些技术的综合应用显著提高了成本预测的准确性并优化了项目管理流程,为企业在竞争激烈的市场中实现可持续发展提供了科学支持。这些成果为实施精细化成本控制提供了有效指南。 展开更多
关键词 建筑工程 成本控制 精细化管理 建筑信息模型 价值工程
下载PDF
建筑工程项目全过程管理中的动态控制研究
8
作者 戴晨潇 《建筑与装饰》 2025年第1期58-60,共3页
建筑工程项目管理关系到建筑施工的效益、质量等多个方面,影响着建筑企业的竞争力和发展空间。通过建筑工程项目的全过程管理优化,确保建筑企业可以拥有较强的竞争力,得到更加稳定的发展,保证建筑工程项目的计划、施工和投入使用等阶段... 建筑工程项目管理关系到建筑施工的效益、质量等多个方面,影响着建筑企业的竞争力和发展空间。通过建筑工程项目的全过程管理优化,确保建筑企业可以拥有较强的竞争力,得到更加稳定的发展,保证建筑工程项目的计划、施工和投入使用等阶段,可以精准实行控制、管理。本文主要讨论建筑工程项目中全过程管理动态控制的作用,思考全过程管理中实行动态控制的重点,研究如何将动态控制运用到实际施工项目中,并提出建议以供参考。 展开更多
关键词 建筑工程 全过程管理 动态控制
下载PDF
海洋石油工程项目建设成本管理思路 被引量:1
9
作者 单晓亮 《化工管理》 2024年第16期12-14,共3页
海洋石油工程项目的开展对缓解中国石油资源紧缺有重大意义及价值。这类项目建设运行具有高风险、工程周期长、海上运输工作量大、长期合作企业多、管理环节错综复杂等特点,实施过程应加强成本管理工作,有效提升企业的经济效益,降低建... 海洋石油工程项目的开展对缓解中国石油资源紧缺有重大意义及价值。这类项目建设运行具有高风险、工程周期长、海上运输工作量大、长期合作企业多、管理环节错综复杂等特点,实施过程应加强成本管理工作,有效提升企业的经济效益,降低建设风险。文章结合海洋石油工程项目管理中加强成本管理的价值意义分析出发,对当前成本管理工作开展中的现状及实施路径进行了综合探究,着重从成本管理构架、成本预算管理、成本控制要点、成本核算分析、成本考核等方面阐述,以期提升中国海上工程项目建设国际市场竞争力。 展开更多
关键词 海洋石油 工程项目 施工成本 成本控制 预算管理
下载PDF
项目成本控制下饲料厂房建设期工程造价动态管理研究
10
作者 孙志丽 《中国饲料》 北大核心 2024年第6期101-104,共4页
饲料厂房建设期工程造价动态管理是饲料企业项目成本控制的重要方面,旨在通过严格把控饲料厂房建设各环节成本支出的方式,实现饲料厂房建设项目经济效益最大化的目标。本文基于项目成本控制视角,在探讨饲料厂房建设工程造价动态管理影... 饲料厂房建设期工程造价动态管理是饲料企业项目成本控制的重要方面,旨在通过严格把控饲料厂房建设各环节成本支出的方式,实现饲料厂房建设项目经济效益最大化的目标。本文基于项目成本控制视角,在探讨饲料厂房建设工程造价动态管理影响因素的基础上,分析工程造价动态管理应用于饲料厂房建设时存在的问题并提出相应对策,以期提升建设期工程造价动态管理的效果。 展开更多
关键词 饲料厂房 动态管理 项目成本 工程造价
下载PDF
大数据环境下基于BIM与CNN的电力工程造价优化算法 被引量:5
11
作者 王林峰 张文静 +2 位作者 刘云 陈志宾 王立功 《沈阳工业大学学报》 CAS 北大核心 2024年第1期7-12,共6页
针对大数据环境下电力工程造价在精准化、动态化等方面存在的不足,提出了一种基于BIM与CNN的电力工程造价优化算法。利用BIM技术的特点进行电力工程全生命周期的造价管理,实现了造价的动态化管控。并且采用Levenberg-Marquardt规则算法... 针对大数据环境下电力工程造价在精准化、动态化等方面存在的不足,提出了一种基于BIM与CNN的电力工程造价优化算法。利用BIM技术的特点进行电力工程全生命周期的造价管理,实现了造价的动态化管控。并且采用Levenberg-Marquardt规则算法改进卷积神经网络,通过改进后的CNN网络对每个工程环节的造价完成预测,从而优化整个工程的施工方案。结合相关的电力工程造价数据,基于Matlab对所提算法进行实验测试。结果表明,当学习率为0.010时CNN网络的性能最佳,所提算法的预测准确率为94%,并且与造价的真实值最为接近。 展开更多
关键词 电力工程造价 BIM技术 卷积神经网络 大数据环境 Levenberg-Marquardt规则算法 全生命周期 动态化管控 预测准确性
下载PDF
基于BIM技术的建筑工程造价控制与管理 被引量:6
12
作者 王臻 《上海建材》 2024年第1期41-43,共3页
工程造价是建筑工程投资管理中比较重要的内容,对工程效益与发展有着直接影响。在传统工程造价管理模式下,无法做到工程造价全过程管理,而将BIM技术运用在建筑工程造价控制活动中,不仅可以提高造价管理水平,还能减少成本投入,实现工程... 工程造价是建筑工程投资管理中比较重要的内容,对工程效益与发展有着直接影响。在传统工程造价管理模式下,无法做到工程造价全过程管理,而将BIM技术运用在建筑工程造价控制活动中,不仅可以提高造价管理水平,还能减少成本投入,实现工程效益最大化。以某办公建筑项目为例,从预测函数、控制模型、数据交互三方面入手,对工程造价效益进行预测。同时,结合案例工程实际情况,对基于BIM技术的各阶段造价管控要点加以总结,旨在为类似工程开展造价管理提供一定参考。 展开更多
关键词 BIM技术 建筑工程 造价控制与管理
下载PDF
成本控制视角下饲料企业建设工程造价精细化管理研究
13
作者 刘净利 《中国饲料》 北大核心 2024年第10期124-127,共4页
精细化管理可以帮助企业实现成本的精细化控制,提高管理效率,优化资源配置,提升市场竞争力。因此,做好精细化管理可以让企业在激烈的市场竞争中立于不败之地。基于此,本文从成本控制的角度出发,对饲料企业建设工程的造价进行精细化管理... 精细化管理可以帮助企业实现成本的精细化控制,提高管理效率,优化资源配置,提升市场竞争力。因此,做好精细化管理可以让企业在激烈的市场竞争中立于不败之地。基于此,本文从成本控制的角度出发,对饲料企业建设工程的造价进行精细化管理,在对饲料企业建设工程各个环节造价管理特点及作用分析的基础上探讨一套切实可行的精细化管理模式和方法,以实现在确保质量的前提下降低饲料企业建设工程整体造价,并提高建设工程的效率和竞争力。本研究的成果不仅将为饲料企业的可持续发展提供有力支撑,也对整个饲料产业链的成本控制工作具有重要的理论和实践意义。 展开更多
关键词 成本控制 饲料企业 工程造价 精细化管理
下载PDF
建筑施工阶段工程造价的控制与管理研究 被引量:1
14
作者 朱跃伟 《江西建材》 2024年第7期379-381,384,共4页
文中采用“赢得值法”作为全过程动态控制造价的主要方法,在确定项目投资目标后,将成本实际值和预算值比较,进行偏差分析,并提出相应的纠偏措施。使用该方法对某北方学校实验楼建设项目进行实时分析,结果显示,该项目实际产生成本比预算... 文中采用“赢得值法”作为全过程动态控制造价的主要方法,在确定项目投资目标后,将成本实际值和预算值比较,进行偏差分析,并提出相应的纠偏措施。使用该方法对某北方学校实验楼建设项目进行实时分析,结果显示,该项目实际产生成本比预算成本高,相应的成本偏差指数为1.643 1%;实际施工进度快于计划进度,计算得到的进度偏差指数为3.372%,即实际成本超出预计成本,但项目施工完成日期有所提前。 展开更多
关键词 赢得值法 动态控制 工程造价 偏差分析
下载PDF
EPC总承包模式下的全过程造价控制与管理探究 被引量:3
15
作者 苏娴 《工程建设与设计》 2024年第6期236-238,共3页
深入研究了在EPC总承包模式下全过程造价控制与管理的重要性和实施策略,分析了如何通过集成工程设计、采购和施工各阶段,实现成本的有效控制与优化,探讨了由总承包商负责项目全程管理时所面临的挑战,以及如何克服这些挑战以保障项目成... 深入研究了在EPC总承包模式下全过程造价控制与管理的重要性和实施策略,分析了如何通过集成工程设计、采购和施工各阶段,实现成本的有效控制与优化,探讨了由总承包商负责项目全程管理时所面临的挑战,以及如何克服这些挑战以保障项目成本、进度和质量。 展开更多
关键词 EPC总承包模式 全过程造价控制 工程项目管理
下载PDF
装配式建筑工程隐性成本控制研究
16
作者 康佳帅 张艺 申金山 《工程经济》 2024年第9期64-80,共17页
研究装配式建筑隐性成本的控制对于加速推广装配式建筑应用、提升承包商经济效益具有重要的现实意义。基于工程总承包商视角,构建装配式建筑隐性成本的影响因素体系,运用系统动力学模拟仿真并进行灵敏度分析。结果显示:配送与安装协同... 研究装配式建筑隐性成本的控制对于加速推广装配式建筑应用、提升承包商经济效益具有重要的现实意义。基于工程总承包商视角,构建装配式建筑隐性成本的影响因素体系,运用系统动力学模拟仿真并进行灵敏度分析。结果显示:配送与安装协同、专业设计协同、施工人员素质和施工管理制度这四个因素是控制隐性成本的关键,并基于精益管理思想提出了装配式建筑工程隐性成本控制的策略。 展开更多
关键词 装配式建筑 隐性成本 成本控制 系统动力学 精益管理
下载PDF
建筑工程项目中设备物资损耗管理的成本控制与优化策略研究 被引量:1
17
作者 邱有波 《工程建设与设计》 2024年第1期238-240,共3页
通过分析设备物资采购、租赁、维护以及事故导致的损耗成本,评估了现行设备物资管理方法的有效性及其局限性,并提出了改进措施及优化策略,包括成本分析与预测、采购策略的调整、仓储与物流的优化、设备保养与维护管理的强化。此外,深入... 通过分析设备物资采购、租赁、维护以及事故导致的损耗成本,评估了现行设备物资管理方法的有效性及其局限性,并提出了改进措施及优化策略,包括成本分析与预测、采购策略的调整、仓储与物流的优化、设备保养与维护管理的强化。此外,深入探讨了风险管理在损耗控制中的应用,并提出了相应的风险评估和应对措施。 展开更多
关键词 建筑工程 设备物资 损耗管理 成本控制
下载PDF
BIM技术在工程项目造价控制中的实践与探索 被引量:1
18
作者 朱倩 《智能建筑与智慧城市》 2024年第8期87-89,共3页
工程项目造价控制是一项复杂的系统工程,涉及多专业、多阶段、多领域的信息采集、分类、处理,传统的工作模式对人力资源比较依赖,易出现许多错误和漏洞,无法保证相关数据信息的准确性、完整性。文章研究了BIM技术在工程项目造价控制中... 工程项目造价控制是一项复杂的系统工程,涉及多专业、多阶段、多领域的信息采集、分类、处理,传统的工作模式对人力资源比较依赖,易出现许多错误和漏洞,无法保证相关数据信息的准确性、完整性。文章研究了BIM技术在工程项目造价控制中的实践与探索,在明确造价控制现状和BIM应用优势的基础上,从项目决策、项目设计、招投标、项目施工、竣工结算等不同阶段出发,分析了BIM技术在工程项目全过程造价控制中的应用要点,有利于提高数据信息共享水平,增强不同参建单位协作能力,提高造价控制质量和效率。 展开更多
关键词 BIM技术 工程项目管理 造价控制 应用实践
下载PDF
基于动态管理控制方法的建筑工程造价评估 被引量:1
19
作者 李姣姣 《贵阳学院学报(自然科学版)》 2024年第2期110-115,共6页
建筑工程造价评估有利于优化工程资源配置、降低施工成本。在此背景下,提出一种基于动态管理控制方法的评估方法。前一部分利用动态管理控制方法追踪工程造价影响因素。后一部分利用粒子群算法优化神经网络参数,基于改进神经网络构建建... 建筑工程造价评估有利于优化工程资源配置、降低施工成本。在此背景下,提出一种基于动态管理控制方法的评估方法。前一部分利用动态管理控制方法追踪工程造价影响因素。后一部分利用粒子群算法优化神经网络参数,基于改进神经网络构建建筑工程造价评估模型,以追踪到的工程造价影响因素为输入,输出建筑工程造价评估值。结果表明:该方法应用中得出的各个阶段的工程造价评估值与造价预算更为接近,误差相对较小,由此证明了该评估方法的有效性。 展开更多
关键词 动态管理控制 建筑工程 粒子群算法 工程造价 神经网络 造价评估
下载PDF
建筑工程造价的动态管理控制分析 被引量:1
20
作者 李玉萍 《建筑与装饰》 2024年第2期57-59,共3页
在建筑行业不断发展和进步的过程中,建筑工程造价管理工作的积极作用越来越明显,因此很多企业也开始对这项工作提高重视,进一步促进企业自身在市场中的竞争力。建筑产业中的有关单位开始加大对项目造价管理力度,结合项目具体施工情况,... 在建筑行业不断发展和进步的过程中,建筑工程造价管理工作的积极作用越来越明显,因此很多企业也开始对这项工作提高重视,进一步促进企业自身在市场中的竞争力。建筑产业中的有关单位开始加大对项目造价管理力度,结合项目具体施工情况,对建筑工程施工阶段开展监督,从而实现对建筑成本进行控制的目的,使项目整体效益得到提高。 展开更多
关键词 建筑工程 造价 动态管理 成本优化
下载PDF
上一页 1 2 59 下一页 到第
使用帮助 返回顶部