Technological advancements in unmanned aerial vehicles(UAVs)have revolutionized various industries,enabling the widespread adoption of UAV-based solutions.In engineering management,UAV-based inspection has emerged as ...Technological advancements in unmanned aerial vehicles(UAVs)have revolutionized various industries,enabling the widespread adoption of UAV-based solutions.In engineering management,UAV-based inspection has emerged as a highly efficient method for identifying hidden risks in high-risk construction environments,surpassing traditional inspection techniques.Building on this foundation,this paper delves into the optimization of UAV inspection routing and scheduling,addressing the complexity introduced by factors such as no-fly zones,monitoring-interval time windows,and multiple monitoring rounds.To tackle this challenging problem,we propose a mixed-integer linear programming(MILP)model that optimizes inspection task assignments,monitoring sequence schedules,and charging decisions.The comprehensive consideration of these factors differentiates our problem from conventional vehicle routing problem(VRP),leading to a mathematically intractable model for commercial solvers in the case of large-scale instances.To overcome this limitation,we design a tailored variable neighborhood search(VNS)metaheuristic,customizing the algorithm to efficiently solve our model.Extensive numerical experiments are conducted to validate the efficacy of our proposed algorithm,demonstrating its scalability for both large-scale and real-scale instances.Sensitivity experiments and a case study based on an actual engineering project are also conducted,providing valuable insights for engineering managers to enhance inspection work efficiency.展开更多
Cracking during construction is a common occurrence in modern bridge engineering that can directly impact the overall safety of the bridge.Therefore,it is essential to focus on preventing and controlling cracks.As the...Cracking during construction is a common occurrence in modern bridge engineering that can directly impact the overall safety of the bridge.Therefore,it is essential to focus on preventing and controlling cracks.As the construction technology for bridge engineering has evolved,the internal quality of construction has significantly improved.However,the appearance quality remains a crucial factor that reflects the technical expertise of a construction company.Therefore,minimizing cracks and improving the appearance quality of concrete are critical issues that require the attention of construction units,supervision departments,and construction companies.This article will analyze the causes of cracking and suggest corresponding prevention and treatment methods.展开更多
To further enhance the overall service quality of China’s hospitals and improve the trust of the majority of patients in hospitals,this paper takes intelligent hospital management as the object of study,analyzes the ...To further enhance the overall service quality of China’s hospitals and improve the trust of the majority of patients in hospitals,this paper takes intelligent hospital management as the object of study,analyzes the importance of electronic information engineering technology applied in hospital management,and discusses the specific application methods of electronic information engineering in hospital management.This aims the existing problems in the current hospital management,such as insufficient degree of informatization,data sharing difficulties,lack of professionals,etc.Corresponding improvement measures are proposed,including strengthening the construction of informatization,promoting data sharing,and cultivating professionals.It is hoped that this study will enable the majority of hospital managers to make better use of electronic information engineering technology to effectively solve the current problems faced by hospitals and to continuously improve the comprehensive competitiveness of China’s hospitals.展开更多
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp...Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely.展开更多
Highway project management involves overseeing the on-site construction of a highway project,taking into account the specific circumstances and conditions of the site.This type of management requires a high level of e...Highway project management involves overseeing the on-site construction of a highway project,taking into account the specific circumstances and conditions of the site.This type of management requires a high level of expertise and is characterized by its dynamic and systematic approach.Effective on-site management can ensure the quality,cost-saving,smooth progress,and safety of highway construction.However,there are still some problems in the implementation of site management in some highway projects,which seriously affect the improvement of site management.This paper analyzes the characteristics and existing problems of highway engineering management,and puts forward the effective strategies of site management,hoping that this study will help to improve highway engineering site management.展开更多
With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovo...With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.展开更多
Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering ...Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development.展开更多
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s...The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes.展开更多
With the gradual acceleration of the urbanization process,the construction industry has been developing rapidly.As the key link to ensure the quality and safety of the project,construction management and construction ...With the gradual acceleration of the urbanization process,the construction industry has been developing rapidly.As the key link to ensure the quality and safety of the project,construction management and construction quality control are of great significance to enhance the competitiveness of construction enterprises and realize sustainable development.In this paper,the effective strategy of construction management and the effective strategy of construction quality control will be discussed in depth,aiming at providing useful management and quality control strategies for construction enterprises.展开更多
Effective application of digital integrated management and maintenance systems is essential for successful operation and maintenance management of bridge projects.This article analyzes the application strategy of such...Effective application of digital integrated management and maintenance systems is essential for successful operation and maintenance management of bridge projects.This article analyzes the application strategy of such systems.It provides an overview of comprehensive digital management and maintenance of bridges,an analysis of the basic components of the integrated management and maintenance system,and its application strategies.This study aims to offer guidance for the application of the system and to improve the quality of modern bridge engineering management and maintenance work.展开更多
Underground construction in China is featured by large scale, high speed, long construction period,complex operation and frustrating situations regarding project safety. Various accidents have been reported from time ...Underground construction in China is featured by large scale, high speed, long construction period,complex operation and frustrating situations regarding project safety. Various accidents have been reported from time to time, resulting in serious social impact and huge economic loss. This paper presents the main progress in the safety risk management of underground engineering in China over the last decade, i.e.(1) establishment of laws and regulations for safety risk management of underground engineering,(2) implementation of the safety risk management plan,(3) establishment of decision support system for risk management and early-warning based on information technology, and(4) strengthening the study on safety risk management, prediction and prevention. Based on the analysis of the typical accidents in China in the last decade, the new challenges in the safety risk management for underground engineering are identified as follows:(1) control of unsafe human behaviors;(2) technological innovation in safety risk management; and(3) design of safety risk management regulations. Finally, the strategies for safety risk management of underground engineering in China are proposed in six aspects, i.e. the safety risk management system and policy, law, administration, economy, education and technology.展开更多
This paper attempts to provide an overview of risk assessment and management practice in underground rock engineering based on a review of the international literature and some personal experience. It is noted that th...This paper attempts to provide an overview of risk assessment and management practice in underground rock engineering based on a review of the international literature and some personal experience. It is noted that the terminologies used in risk assessment and management studies may vary from country to country. Probabilistic risk analysis is probably the most widely-used approach to risk assessment in rock engineering and in geotechnical engineering more broadly. It is concluded that great potential exists to augment the existing probabilistic methods by the use of Bayesian networks and decision analysis techniques to allow reasoning under uncertainty and to update probabilities, material properties and analyses as further data become available throughout the various stages of a project. Examples are given of the use of these methods in underground excavation engineering in China and elsewhere, and opportunities for their further application are identified.展开更多
Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its gre...Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its great contributions to the national gross domestic product (GDP) of the country. Concerning construction processes, both risk management (RM) and value engineering (VE) techniques have commonalities from the beginning up to the completion of the project due to enhancing the project value/quality, meeting the project deadline, and reducing overall project cost. VE includes resolving the uncertainty of project objectives and ensuring that the project is delivered in a value for money way. The key point of RM is to solve the uncertainty of the project itself and its results to ensure that the specifications are achieved within the prescribed time, cost, and quality constraints. This review work is comparatively and collectively focus</span><span style="font-family:Verdana;">ed</span><span style="font-family:Verdana;"> on assessing the role of RM and VE tools for project successful delivery. It studies the points of difference and common features of the two aspects in terms of construction project delivery. So, this study concluded that in construction RM tool cannot be the chief aim of the all parties involved in the project execution because sometimes it produces itself negative results and reduces project management success. Therefore, RM needs a strong combination with VE due to the dependence of the target in identifying and assessing risks by considering the highest performance and lowest cost. The integration of RM and VE combination in a single study would avoid duplication of work and deliver better value for money thereby leading to better project outcomes.展开更多
This paper presents a domain engineering approach to build a software product line that supports the change notification service in a Configuration Management Database (CMDB) according to the Information Technology In...This paper presents a domain engineering approach to build a software product line that supports the change notification service in a Configuration Management Database (CMDB) according to the Information Technology Infrastructure Library (ITIL) best practices. For the development of this product line, the proposed approach makes use of a construction of products methodology by analogy: this is a new notation which reports the variability of the products, obtaining metrics as important as the number of products and uses a language that enables, by means of the flexibilization of a product and the development of some generators, to build the rest of the product line. In addition the paper offers a standard for the analysis and design of the CMDB as well. Finally, the paper presents an economic model for the product line, where the profitability and productivity of the proposed solution are analyzed.展开更多
To support and serve engineering design, creative design based on knowledge management is proposed. The key knowledge factors of creative design are analyzed and discussed, and knowledge extraction tools are utilized ...To support and serve engineering design, creative design based on knowledge management is proposed. The key knowledge factors of creative design are analyzed and discussed, and knowledge extraction tools are utilized to distill the important knowledge to serve for knowledge resource of creative design. The implementation of creative design mode is described and executed, which can promote the intelligent asset of the enterprise and shorten the period of creative design. With this study, design afflatus and conceptual design can be achieved expediently and effectively.展开更多
Engineering Change (EC) management for a Product Lifecycle Management (PLM) system, including EC data model, EC evaluation and EC implementation is presented. A method of dynamic and parallel EC evaluation is proposed...Engineering Change (EC) management for a Product Lifecycle Management (PLM) system, including EC data model, EC evaluation and EC implementation is presented. A method of dynamic and parallel EC evaluation is proposed, which breaks an EC evaluation task into several subtasks. Such subtasks can be dynamically and simultaneously proceeded, disassembled and communicated by different specialists, and at the same time a set of EC objects is created. This approach provides flexible and effective evaluation of the EC. The EC implementation followed will further ensure the completeness and consistency of EC data.展开更多
Many organizations are struggling to provide high bandwidth and reliable internet connectivity at their branch offices and business locations and getting the most out of their operational expense.The need for internet...Many organizations are struggling to provide high bandwidth and reliable internet connectivity at their branch offices and business locations and getting the most out of their operational expense.The need for internet connectivity at any branch offices and business locations is not a luxury anymore but is a necessity.Let us try to understand how to plan and document the SDWAN(Software Defined-Wide Area Network)implementation in an organization.We will try to understand why it is essential to implement the new technology instead of investing in the existing MPLS(Multi-Protocol label switching)by taking an example of a retail organization.Methods:This project/research was performed using the abilities of Software Defined Network Technology and options available in MPLS(Multi-Protocol Label Switching).The Technical Project management principles were adopted as per PMI(Project Management Institute)waterfall methodology.Results/Conclusion:SDWAN technology provides an effective replacement of MPLS network connection for providing WAN connectivity for our office locations.It is essential to follow a documented process for appropriate vendor selection based on the available features and other listed attributes in the article.To be successful in the implementation it is essential to perform a POC(Proof of Concept)in a controlled environment and validate results.SDWAN provides better network performance and improves reliability as the links operate in active-active function.展开更多
Traditional Numerical Reservoir Simulation has been contributing to the oil and gas industry for decades.The current state of this technology is the result of decades of research and development by a large number of e...Traditional Numerical Reservoir Simulation has been contributing to the oil and gas industry for decades.The current state of this technology is the result of decades of research and development by a large number of engineers and scientists.Starting in the late 1960s and early 1970s,advances in computer hardware along with development and adaptation of clever algorithms resulted in a paradigm shift in reservoir studies moving them from simplified analogs and analytical solution methods to more mathematically robust computational and numerical solution models.展开更多
The Three Gorges Project is a very large project, and its structure is very complex. International advanced engineering equipment is broadly used. The state of equipment running directly influences project building qu...The Three Gorges Project is a very large project, and its structure is very complex. International advanced engineering equipment is broadly used. The state of equipment running directly influences project building qualities and limited time. According to the factual conditions of the Three Gorges Project, the characteristics of engineering equipment are analyzed. At the same time, some theories about equipment management are induced, and the TDCPR management mode of engineering equipment of the Three Gorges Project is put forward in order to gain the aim of managing and using equipment well and speeding up the project construction.展开更多
Remanufacture Engineering is an important characteristic and development trend of a manufacturing system in the 21st Century, and product information management is very important to Remanufacture Engineering. In this ...Remanufacture Engineering is an important characteristic and development trend of a manufacturing system in the 21st Century, and product information management is very important to Remanufacture Engineering. In this paper, we first compared traditional manufacturing and remanufacturing. Then, according to the features of Remanufacture Engineering, we analyzed the request of product information management system facing Remanufacture Engineering, and designed the system module. Finally, we built a kind of system structure of product information management facing Remanufacture Engineering and gave realization methods based on Web.展开更多
基金supported by the National Natural Science Foundation of China(72201229,72025103,72394360,72394362,72361137001,72071173,and 71831008).
文摘Technological advancements in unmanned aerial vehicles(UAVs)have revolutionized various industries,enabling the widespread adoption of UAV-based solutions.In engineering management,UAV-based inspection has emerged as a highly efficient method for identifying hidden risks in high-risk construction environments,surpassing traditional inspection techniques.Building on this foundation,this paper delves into the optimization of UAV inspection routing and scheduling,addressing the complexity introduced by factors such as no-fly zones,monitoring-interval time windows,and multiple monitoring rounds.To tackle this challenging problem,we propose a mixed-integer linear programming(MILP)model that optimizes inspection task assignments,monitoring sequence schedules,and charging decisions.The comprehensive consideration of these factors differentiates our problem from conventional vehicle routing problem(VRP),leading to a mathematically intractable model for commercial solvers in the case of large-scale instances.To overcome this limitation,we design a tailored variable neighborhood search(VNS)metaheuristic,customizing the algorithm to efficiently solve our model.Extensive numerical experiments are conducted to validate the efficacy of our proposed algorithm,demonstrating its scalability for both large-scale and real-scale instances.Sensitivity experiments and a case study based on an actual engineering project are also conducted,providing valuable insights for engineering managers to enhance inspection work efficiency.
文摘Cracking during construction is a common occurrence in modern bridge engineering that can directly impact the overall safety of the bridge.Therefore,it is essential to focus on preventing and controlling cracks.As the construction technology for bridge engineering has evolved,the internal quality of construction has significantly improved.However,the appearance quality remains a crucial factor that reflects the technical expertise of a construction company.Therefore,minimizing cracks and improving the appearance quality of concrete are critical issues that require the attention of construction units,supervision departments,and construction companies.This article will analyze the causes of cracking and suggest corresponding prevention and treatment methods.
文摘To further enhance the overall service quality of China’s hospitals and improve the trust of the majority of patients in hospitals,this paper takes intelligent hospital management as the object of study,analyzes the importance of electronic information engineering technology applied in hospital management,and discusses the specific application methods of electronic information engineering in hospital management.This aims the existing problems in the current hospital management,such as insufficient degree of informatization,data sharing difficulties,lack of professionals,etc.Corresponding improvement measures are proposed,including strengthening the construction of informatization,promoting data sharing,and cultivating professionals.It is hoped that this study will enable the majority of hospital managers to make better use of electronic information engineering technology to effectively solve the current problems faced by hospitals and to continuously improve the comprehensive competitiveness of China’s hospitals.
文摘Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely.
文摘Highway project management involves overseeing the on-site construction of a highway project,taking into account the specific circumstances and conditions of the site.This type of management requires a high level of expertise and is characterized by its dynamic and systematic approach.Effective on-site management can ensure the quality,cost-saving,smooth progress,and safety of highway construction.However,there are still some problems in the implementation of site management in some highway projects,which seriously affect the improvement of site management.This paper analyzes the characteristics and existing problems of highway engineering management,and puts forward the effective strategies of site management,hoping that this study will help to improve highway engineering site management.
文摘With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.
文摘Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development.
文摘The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes.
文摘With the gradual acceleration of the urbanization process,the construction industry has been developing rapidly.As the key link to ensure the quality and safety of the project,construction management and construction quality control are of great significance to enhance the competitiveness of construction enterprises and realize sustainable development.In this paper,the effective strategy of construction management and the effective strategy of construction quality control will be discussed in depth,aiming at providing useful management and quality control strategies for construction enterprises.
文摘Effective application of digital integrated management and maintenance systems is essential for successful operation and maintenance management of bridge projects.This article analyzes the application strategy of such systems.It provides an overview of comprehensive digital management and maintenance of bridges,an analysis of the basic components of the integrated management and maintenance system,and its application strategies.This study aims to offer guidance for the application of the system and to improve the quality of modern bridge engineering management and maintenance work.
基金supported by Chinese Academy of Engineering(grant No.2011-ZD-12)National Natural Science Foundation of China(grant No.11272178)National Basic Research Program of China(973 Program)(grant No.2011CB013502/3)
文摘Underground construction in China is featured by large scale, high speed, long construction period,complex operation and frustrating situations regarding project safety. Various accidents have been reported from time to time, resulting in serious social impact and huge economic loss. This paper presents the main progress in the safety risk management of underground engineering in China over the last decade, i.e.(1) establishment of laws and regulations for safety risk management of underground engineering,(2) implementation of the safety risk management plan,(3) establishment of decision support system for risk management and early-warning based on information technology, and(4) strengthening the study on safety risk management, prediction and prevention. Based on the analysis of the typical accidents in China in the last decade, the new challenges in the safety risk management for underground engineering are identified as follows:(1) control of unsafe human behaviors;(2) technological innovation in safety risk management; and(3) design of safety risk management regulations. Finally, the strategies for safety risk management of underground engineering in China are proposed in six aspects, i.e. the safety risk management system and policy, law, administration, economy, education and technology.
文摘This paper attempts to provide an overview of risk assessment and management practice in underground rock engineering based on a review of the international literature and some personal experience. It is noted that the terminologies used in risk assessment and management studies may vary from country to country. Probabilistic risk analysis is probably the most widely-used approach to risk assessment in rock engineering and in geotechnical engineering more broadly. It is concluded that great potential exists to augment the existing probabilistic methods by the use of Bayesian networks and decision analysis techniques to allow reasoning under uncertainty and to update probabilities, material properties and analyses as further data become available throughout the various stages of a project. Examples are given of the use of these methods in underground excavation engineering in China and elsewhere, and opportunities for their further application are identified.
文摘Both in developed and in developing countries, the construction industry is regarded as an economic investment activity without forgetting its significant relationship with national economic development due to its great contributions to the national gross domestic product (GDP) of the country. Concerning construction processes, both risk management (RM) and value engineering (VE) techniques have commonalities from the beginning up to the completion of the project due to enhancing the project value/quality, meeting the project deadline, and reducing overall project cost. VE includes resolving the uncertainty of project objectives and ensuring that the project is delivered in a value for money way. The key point of RM is to solve the uncertainty of the project itself and its results to ensure that the specifications are achieved within the prescribed time, cost, and quality constraints. This review work is comparatively and collectively focus</span><span style="font-family:Verdana;">ed</span><span style="font-family:Verdana;"> on assessing the role of RM and VE tools for project successful delivery. It studies the points of difference and common features of the two aspects in terms of construction project delivery. So, this study concluded that in construction RM tool cannot be the chief aim of the all parties involved in the project execution because sometimes it produces itself negative results and reduces project management success. Therefore, RM needs a strong combination with VE due to the dependence of the target in identifying and assessing risks by considering the highest performance and lowest cost. The integration of RM and VE combination in a single study would avoid duplication of work and deliver better value for money thereby leading to better project outcomes.
文摘This paper presents a domain engineering approach to build a software product line that supports the change notification service in a Configuration Management Database (CMDB) according to the Information Technology Infrastructure Library (ITIL) best practices. For the development of this product line, the proposed approach makes use of a construction of products methodology by analogy: this is a new notation which reports the variability of the products, obtaining metrics as important as the number of products and uses a language that enables, by means of the flexibilization of a product and the development of some generators, to build the rest of the product line. In addition the paper offers a standard for the analysis and design of the CMDB as well. Finally, the paper presents an economic model for the product line, where the profitability and productivity of the proposed solution are analyzed.
基金This project is supported by National Basic Research Program of China(973Program,No.2003CB317005)Shuguang Program of Shanghai City Educational Conunittee China(No.05SG15).
文摘To support and serve engineering design, creative design based on knowledge management is proposed. The key knowledge factors of creative design are analyzed and discussed, and knowledge extraction tools are utilized to distill the important knowledge to serve for knowledge resource of creative design. The implementation of creative design mode is described and executed, which can promote the intelligent asset of the enterprise and shorten the period of creative design. With this study, design afflatus and conceptual design can be achieved expediently and effectively.
基金Supported by Fujian Province Natural Science Foundation (A04400066)Xiamen Science and Technology Program(3502Z20055028)
文摘Engineering Change (EC) management for a Product Lifecycle Management (PLM) system, including EC data model, EC evaluation and EC implementation is presented. A method of dynamic and parallel EC evaluation is proposed, which breaks an EC evaluation task into several subtasks. Such subtasks can be dynamically and simultaneously proceeded, disassembled and communicated by different specialists, and at the same time a set of EC objects is created. This approach provides flexible and effective evaluation of the EC. The EC implementation followed will further ensure the completeness and consistency of EC data.
文摘Many organizations are struggling to provide high bandwidth and reliable internet connectivity at their branch offices and business locations and getting the most out of their operational expense.The need for internet connectivity at any branch offices and business locations is not a luxury anymore but is a necessity.Let us try to understand how to plan and document the SDWAN(Software Defined-Wide Area Network)implementation in an organization.We will try to understand why it is essential to implement the new technology instead of investing in the existing MPLS(Multi-Protocol label switching)by taking an example of a retail organization.Methods:This project/research was performed using the abilities of Software Defined Network Technology and options available in MPLS(Multi-Protocol Label Switching).The Technical Project management principles were adopted as per PMI(Project Management Institute)waterfall methodology.Results/Conclusion:SDWAN technology provides an effective replacement of MPLS network connection for providing WAN connectivity for our office locations.It is essential to follow a documented process for appropriate vendor selection based on the available features and other listed attributes in the article.To be successful in the implementation it is essential to perform a POC(Proof of Concept)in a controlled environment and validate results.SDWAN provides better network performance and improves reliability as the links operate in active-active function.
文摘Traditional Numerical Reservoir Simulation has been contributing to the oil and gas industry for decades.The current state of this technology is the result of decades of research and development by a large number of engineers and scientists.Starting in the late 1960s and early 1970s,advances in computer hardware along with development and adaptation of clever algorithms resulted in a paradigm shift in reservoir studies moving them from simplified analogs and analytical solution methods to more mathematically robust computational and numerical solution models.
文摘The Three Gorges Project is a very large project, and its structure is very complex. International advanced engineering equipment is broadly used. The state of equipment running directly influences project building qualities and limited time. According to the factual conditions of the Three Gorges Project, the characteristics of engineering equipment are analyzed. At the same time, some theories about equipment management are induced, and the TDCPR management mode of engineering equipment of the Three Gorges Project is put forward in order to gain the aim of managing and using equipment well and speeding up the project construction.
文摘Remanufacture Engineering is an important characteristic and development trend of a manufacturing system in the 21st Century, and product information management is very important to Remanufacture Engineering. In this paper, we first compared traditional manufacturing and remanufacturing. Then, according to the features of Remanufacture Engineering, we analyzed the request of product information management system facing Remanufacture Engineering, and designed the system module. Finally, we built a kind of system structure of product information management facing Remanufacture Engineering and gave realization methods based on Web.