Construction Project Management and Construction Quality Control Strategy
1
作者 Qinrong Zhang 《Journal of Architectural Research and Development》 2024年第4期45-50,共6页
With the gradual acceleration of the urbanization process,the construction industry has been developing rapidly.As the key link to ensure the quality and safety of the project,construction management and construction ... With the gradual acceleration of the urbanization process,the construction industry has been developing rapidly.As the key link to ensure the quality and safety of the project,construction management and construction quality control are of great significance to enhance the competitiveness of construction enterprises and realize sustainable development.In this paper,the effective strategy of construction management and the effective strategy of construction quality control will be discussed in depth,aiming at providing useful management and quality control strategies for construction enterprises. 展开更多
关键词 construction engineering management construction quality control STRATEGY Quality control point
下载PDF
Construction Safety Management of Mechanical and Electrical Installation Projects
2
作者 Honglou Chi 《Journal of Architectural Research and Development》 2024年第2期50-54,共5页
Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of exp... Various industries today rely on the support of electromechanical equipment,expanding its scope of application and leading to an increase in electromechanical installation projects.However,due to the high level of expertise required and the potential risks involved,it is crucial to emphasize safety management during construction.This paper delves into the significance of construction safety management for electromechanical installation projects,identifies common problems encountered during construction,and proposes solutions.This analysis aims to provide relevant personnel with essential guidance and references for managing electromechanical installation projects safely. 展开更多
关键词 construction safety Mechanical and electrical installation Installation engineering engineering projects Safety management
下载PDF
Financial Calculation Problems and Countermeasure Analysis of Large-Scale Engineering Construction Projects
3
作者 Qiong Hou 《Proceedings of Business and Economic Studies》 2024年第2期15-21,共7页
The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s... The financial aspects of large-scale engineering construction projects profoundly influence their success.Strengthening cost control and establishing a scientific financial evaluation system can enhance the project’s economic benefits,minimize unnecessary costs,and provide decision-makers with a robust financial foundation.Additionally,implementing an effective cash flow control mechanism and conducting a comprehensive assessment of potential project risks can ensure financial stability and mitigate the risk of fund shortages.Developing a practical and feasible fundraising plan,along with stringent fund management practices,can prevent fund wastage and optimize fund utilization efficiency.These measures not only facilitate smooth project progression and improve project management efficiency but also enhance the project’s economic and social outcomes. 展开更多
关键词 Large-scale engineering construction projects Financial calculation Fund management
下载PDF
Research on Quality Management Measures of Green Building Construction
4
作者 Jie Hong Xiang Xu 《Journal of Architectural Research and Development》 2024年第3期8-13,共6页
Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering ... Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development. 展开更多
关键词 Green building engineering construction process control Quality management construction publicity
下载PDF
Analysis of Highway Project Construction Technology Management
5
作者 Yuan Zhou 《Journal of World Architecture》 2023年第6期1-5,共5页
Highway engineering construction plays a pivotal role in driving urban economic development,in the face of modern urban transportation high-quality development.To achieve high-quality development in modern urban trans... Highway engineering construction plays a pivotal role in driving urban economic development,in the face of modern urban transportation high-quality development.To achieve high-quality development in modern urban transportation,it is imperative to engage in effective management practices.This article analyzes the technology involved in highway engineering construction,delving into key aspects of highway construction technology,and examining measures for managing and controlling highway engineering construction technology effectively. 展开更多
关键词 Highway engineering construction technology Technology management construction control
下载PDF
Control and Management of Construction Project Cost 被引量:1
6
作者 ZHU Lili 《Journal of Landscape Research》 2016年第4期7-8,共2页
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje... Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost. 展开更多
关键词 construction project construction stage project cost control and management
下载PDF
Application of Three-Dimensional Visualization Technology in Project Management of Offshore Platform Engineering Construction
7
作者 Jianyuan Yang Songlin Xia +2 位作者 Jie Shang Shaofang Li Zhongde Zhang 《Engineering(科研)》 2019年第11期727-734,共8页
Three-dimensional visualization technology converts engineering design drawings and data into graphics or images, realizes virtual reality perception of simulated users in future construction scene, enhances the inter... Three-dimensional visualization technology converts engineering design drawings and data into graphics or images, realizes virtual reality perception of simulated users in future construction scene, enhances the interaction between project management and technical personnel and engineering construction achievement, and provides intuitive, flexible and strong realistic experience for project management. It can effectively improve the level of project communication, and assist the needs of project construction planning management, training, exhibition, etc. As a tool to help improve project management skills, it has good application effect and prospects. 展开更多
关键词 THREE-DIMENSIONAL VISUALIZATION VIRTUAL REALITY engineering construction project management
下载PDF
Cost Control research in Construction Project Management
8
作者 Danjing wang 《International Journal of Technology Management》 2013年第4期98-100,共3页
关键词 建设项目管理 成本控制 工程项目管理 施工项目管理 管理科学 竞争对手 竞争环境 建筑公司
下载PDF
Thinking substation construction project management methods
9
作者 HU Wenmin 《International English Education Research》 2015年第10期21-23,共3页
关键词 建设项目管理 变电站 施工项目管理 项目成本控制 工程招投标 质量管理 安全管理 工程建设管理
下载PDF
Research on Progress Control of Overseas Cement EPC General Contracting Project
10
作者 Jianke Gu 《Journal of World Architecture》 2021年第6期42-46,共5页
The purpose of Engineering Procurement Construction(EPC)general contracting project schedule management is to ensure that the project meets its deadlines,and it plays a critical role in contract performance.In compari... The purpose of Engineering Procurement Construction(EPC)general contracting project schedule management is to ensure that the project meets its deadlines,and it plays a critical role in contract performance.In comparison to the domestic general contracting model,project management and coordination are more complex for the general contractor of international EPC projects.As a result,scientific project schedule process control is critical to effectively ensuring project duration,saving project costs,improving project management level,and project quality,and ensuring that the project achieves the promised advantages for both the contractor and the owner.Through the research and analysis of the status of the schedule management of the Indonesia B Project Phase II cement project,corresponding optimization measures are proposed for the project schedule process control. 展开更多
关键词 EPC cement engineering project management schedule management Process control
下载PDF
The Influence of Construction Manager Experience in Project Accomplishment
11
作者 Mamoon Mousa Atout 《Management Studies》 2014年第8期515-532,共18页
关键词 管理学 管理技术 管理方法 管理学理论
下载PDF
工程造价超预算的原因分析和控制方法研究
12
作者 胡立群 唐克静 +2 位作者 周文瑞 汤飞 江柳清 《湖北工业职业技术学院学报》 2024年第3期76-79,共4页
在工程项目实施过程中,工程造价控制成为项目管理中的关键环节。本文从工程造价预算控制有益于项目顺利结算、有利于项目合理投入、有助于减少变更数量三个方面阐述了其意义。提出了造成超预算是因为施工组织设计脱离实际、工程施工进... 在工程项目实施过程中,工程造价控制成为项目管理中的关键环节。本文从工程造价预算控制有益于项目顺利结算、有利于项目合理投入、有助于减少变更数量三个方面阐述了其意义。提出了造成超预算是因为施工组织设计脱离实际、工程施工进度失去控制、项目成本管理缺乏力度三个主要原因,提出了相应的控制方法,应严审施工组织设计以减少施工变更、严控工程施工进度以降低延期消耗、强化预算控制意识以提升投入效能。 展开更多
关键词 工程造价 超预算 控制方法 项目管理
下载PDF
改进关键链技术在泵站施工进度管控中的应用
13
作者 刘永强 孙昊聪 +1 位作者 朱斌 杨志帅 《中国农村水利水电》 北大核心 2024年第7期249-254,共6页
为解决工程施工进度管控关键链技术应用中存在的缓冲区计算方法粗略,缓冲区监控方法脱离实际施工的问题,通过引入风险控制系数、资源影响系数、工序复杂系数、工序位置系数以及环境系数五个指标,运用层次分析法和CRITIC(Criteria Import... 为解决工程施工进度管控关键链技术应用中存在的缓冲区计算方法粗略,缓冲区监控方法脱离实际施工的问题,通过引入风险控制系数、资源影响系数、工序复杂系数、工序位置系数以及环境系数五个指标,运用层次分析法和CRITIC(Criteria Importance Through Intercriteria Correlation)客观赋权法构建缓冲区优化模型;将缓冲区消耗率和项目工作链完成进度百分比相关联,建立了缓冲区动态监控机制。运用缓冲区优化模型和动态监控机制改进关键链技术,将改进关键链技术应用于泵站工程施工进度管理。结果表明:该方法所得到的缓冲区尺寸较为合理,可以实现缩短计划工期和实现缓冲区动态监控,为水利工程施工进度管控提供借鉴。 展开更多
关键词 关键链法 项目进度管理 泵站工程
下载PDF
智能建管平台下工程总承包项目信息共享激励研究
14
作者 丁继勇 孙梦 《科技管理研究》 2024年第6期166-176,共11页
信息共享是提高工程总承包(engineering-procurement-construction,EPC)项目管理效率的关键因素之一,而以建筑信息模型(BIM)技术为基础,结合云计算、人工智能、物联网等技术,在项目全生命周期内对项目成本、进度、质量、安全等多方面进... 信息共享是提高工程总承包(engineering-procurement-construction,EPC)项目管理效率的关键因素之一,而以建筑信息模型(BIM)技术为基础,结合云计算、人工智能、物联网等技术,在项目全生命周期内对项目成本、进度、质量、安全等多方面进行有效的数字化管控的智能建管平台的应用可以有效改善EPC项目中信息不对称现象。但是工程实践中存在总承包商信息共享积极性不高的问题。针对这一问题,以业主方主导构建的智能建管平台为特定情境,运用演化博弈理论构建业主方和总承包商之间的博弈模型,分析双方在信息共享激励过程中的策略选择并进行仿真研究,以探讨不同参数对总承包商信息共享行为的影响,以及影响双方策略选择的关键因素。结果发现:业主方的额外收益越大、激励成本越低,其更倾向于采取激励策略;总承包商积极信息共享的潜在收益越大、消极信息共享的机会收益越小,其更倾向于采取积极信息共享策略;总承包商的智能建管平台应用成熟度和对总承包商的补贴对双方的策略都有显著影响。基于此,提出业主方应从物质激励和声誉激励相结合、基于智能建管平台应用的不同时期及时调整激励策略和辅以适当惩罚机制3个维度来制定激励策略,以促进总承包商积极共享信息。 展开更多
关键词 智能建管平台 工程总承包项目 信息共享 演化博弈 工程项目管理
下载PDF
海洋石油工程项目建设成本管理思路
15
作者 单晓亮 《化工管理》 2024年第16期12-14,共3页
海洋石油工程项目的开展对缓解中国石油资源紧缺有重大意义及价值。这类项目建设运行具有高风险、工程周期长、海上运输工作量大、长期合作企业多、管理环节错综复杂等特点,实施过程应加强成本管理工作,有效提升企业的经济效益,降低建... 海洋石油工程项目的开展对缓解中国石油资源紧缺有重大意义及价值。这类项目建设运行具有高风险、工程周期长、海上运输工作量大、长期合作企业多、管理环节错综复杂等特点,实施过程应加强成本管理工作,有效提升企业的经济效益,降低建设风险。文章结合海洋石油工程项目管理中加强成本管理的价值意义分析出发,对当前成本管理工作开展中的现状及实施路径进行了综合探究,着重从成本管理构架、成本预算管理、成本控制要点、成本核算分析、成本考核等方面阐述,以期提升中国海上工程项目建设国际市场竞争力。 展开更多
关键词 海洋石油 工程项目 施工成本 成本控制 预算管理
下载PDF
山西农业大学综合教学楼工程全过程管理与质量控制探讨
16
作者 王秋生 《建筑技术开发》 2024年第3期142-144,共3页
工程项目管理和质量控制一直是建筑工程建设关注的核心。以山西农业大学综合教学楼为例,对建筑工程项目质量管理和质量控制体系,以及工程质量控制策略及实践进行探讨,以丰富建筑工程项目管理和质量控制的实践。
关键词 山西农业大学 综合教学楼 建筑工程 工程质量控制 全过程管理
下载PDF
干扰情形下重复性项目快速修复策略模型与算法
17
作者 王浩 张立辉 +1 位作者 周琳 郭欣雨 《科学技术与工程》 北大核心 2024年第7期2876-2884,共9页
重复性项目受到干扰事件影响后,如何使其低成本,快速修复到基准调度计划,是项目管理者面临的重要问题。本文研究了干扰情形下重复性项目的反应性调度问题。首先提出了一种新的快速修复策略模型,旨在使项目以较低的成本快速修复到基准调... 重复性项目受到干扰事件影响后,如何使其低成本,快速修复到基准调度计划,是项目管理者面临的重要问题。本文研究了干扰情形下重复性项目的反应性调度问题。首先提出了一种新的快速修复策略模型,旨在使项目以较低的成本快速修复到基准调度计划;针对问题特点,设计了一种Q-learning与遗传算法结合的混合算法进行求解;最后通过一个高速公路项目和蒙特卡洛模拟验证了本文模型和算法的有效性。结果表明:本文所提出的修复策略可以显著降低反应性调度成本;在一定范围内,增加修复的范围可以有效降低反应性调度成本;Q-learning与遗传算法混合算法在该问题上的求解质量和效率优于遗传算法。本文可以为重复性项目管理者进行反应性调度提供决策依据。 展开更多
关键词 项目管理 重复性项目 反应性调度 遗传算法
下载PDF
基于BIM技术的工程进度管理研究
18
作者 徐凯祥 方必和 王军 《智能建筑与智慧城市》 2024年第4期78-80,共3页
文章通过研究分析大量的文献资料,对传统进度管理的理论、方法等内容做出概述,在此基础上论述了BIM技术应用在进度管理方面的相关理论,并通过对BIM技术下进度计划的编制、控制两方面内容进行分析,阐述了BIM技术的引入打破了传统进度管... 文章通过研究分析大量的文献资料,对传统进度管理的理论、方法等内容做出概述,在此基础上论述了BIM技术应用在进度管理方面的相关理论,并通过对BIM技术下进度计划的编制、控制两方面内容进行分析,阐述了BIM技术的引入打破了传统进度管理的局限性和不足,为后续相关研究提供参考。 展开更多
关键词 工程建设 进度管理 BIM技术 进度计划
下载PDF
基于数字孪生的建设工程项目管理数字化
19
作者 宫志群 王永志 廖少明 《土木工程学报》 EI CSCD 北大核心 2024年第7期106-128,共23页
我国大型建设项目具有规模大、工序复杂交叉、信息碎片化、劳动力短缺等问题,对传统项目管理方式形成了挑战,项目管理数字化需求十分迫切,其中数字孪生是当前实现项目管理数字化的重要手段。通过研究数字孪生的内涵、孪生映射以及数字... 我国大型建设项目具有规模大、工序复杂交叉、信息碎片化、劳动力短缺等问题,对传统项目管理方式形成了挑战,项目管理数字化需求十分迫切,其中数字孪生是当前实现项目管理数字化的重要手段。通过研究数字孪生的内涵、孪生映射以及数字孪生成熟度评价,并结合南通绕城高速公路项目的应用实践,总结并提出基于数字孪生的建设项目管理数字化转型的实现路径、技术手段及建议。主要结论如下:(1)基于数字孪生内涵,构建了建设项目管理的数字孪生模型及考虑生命周期、模型映射、功能和数据完备性的四维度数字孪生成熟度评价模型。(2)采用BIM、GIS、UAV和IoT技术集成,在BIM“一模到底”理念下构建以BIM为数据载体的高速公路项目的数字孪生模型,实现孪生体虚实精准映射。(3)基于数字孪生的工程项目管理数字化具有提升组织管理能力、管理效益提升、提升工程质量、项目数字资产价值再生等意义。(4)为切实推动建设项目管理数字化,需根据项目特点,着力解决项目结合、理念转变、组织保障和技术支撑等问题。 展开更多
关键词 建设项目管理 数字孪生 数字化 建筑信息模型
下载PDF
施工企业建安工程成本考核工作标准化及应用研究
20
作者 杨吉星 胡立新 《中国标准化》 2024年第6期192-199,共8页
“成本考核”工作是成本管理工作中的重点内容。通过对某施工企业建筑安装工程成本考核工作的调研与分析,发现企业成本考核工作存在的问题,如核算对象定义规则不统一、考核周期随意划分、考核方式选择不当等;借助“建安工程费用项目组... “成本考核”工作是成本管理工作中的重点内容。通过对某施工企业建筑安装工程成本考核工作的调研与分析,发现企业成本考核工作存在的问题,如核算对象定义规则不统一、考核周期随意划分、考核方式选择不当等;借助“建安工程费用项目组成”及“价税分离”的理论基础,针对现存问题及企业管理现状,梳理出企业建安工程成本考核工作的业务流程及各项工作的标准化做法,并举例进行说明。以期助力企业更好地进行项目成本管理,助力企业数字化转型。 展开更多
关键词 施工企业 建安工程 项目管理 项目经理部 成本考核 标准化
下载PDF