A discrete-event system simulation and animation program was developed to enhance the efficiency of a truck-excavator operation and reduce the environmental impact of haulage in an open-cut coal mine with multiple-pit...A discrete-event system simulation and animation program was developed to enhance the efficiency of a truck-excavator operation and reduce the environmental impact of haulage in an open-cut coal mine with multiple-pit operations. In any mine, a key objective is to have sufficient equipment for production and not to have excess to where it becomes counterproductive. Due to the advent of responsible mining,environmental regulations, and eco-friendly practices, these factors must also be considered in the analysis. Simulation studies can be financially advantageous for both the optimization of existing mine operations and new development phases in a mine. This study is a new approach to use discrete-event system simulation for mine systems, in order to investigate and possibly reduce environmental impact considering mining haulage performance and production target. A hypothetical layout of a surface coal mine with two pit operations was used for the simulation and animation model. The simulation model includes the animation of the operation. Animation is helpful to enhance the benefit of a mine simulation model. GPSS/Hòand Proof Professionalòwere the software used for the investigation.展开更多
This paper analyzes the main problems of Sinopec Beijing Yanshan Petrochemical Co.,Ltd.,such as decentralized steam system layout,many types of fuels,obvious increase in fuel cost,low operation efficiency of turbine a...This paper analyzes the main problems of Sinopec Beijing Yanshan Petrochemical Co.,Ltd.,such as decentralized steam system layout,many types of fuels,obvious increase in fuel cost,low operation efficiency of turbine and boiler and high self consumption loss,and puts forward and implements optimization and improvement measures such as pressure raising transformation of natural gas system,adjustment of energy consumption structure,reduction of energy consumption cost,improvement of steam production quality and equipment efficiency.The results showed that compared with the fuel consumption in 2018,the consumption of coal coke was reduced by 550000 t,the consumption of natural gas was increased by 170000 t,and the total consumption of fuel gas and fuel oil was increased by 50000 t,equivalent to 246000 t of standard coal;the purchased electricity was increased by about 5×10^(8) kW·h.Green power trading and 14.76 MW distributed photovoltaic projects were carried out.According to the calculation of 1400-1600 h annual power generation in class II photovoltaic areas and the emission factor of North China regional power grid baseline,the annual emission reduction was about 55000 t CO_(2) in 2021.After the above transformation,the goal of zero-coking is achieved;the steam consumption of units is reduced by 21.5%,the steam production of boilers is reduced by 24.9%,and the annual emission reduction is about 760000 t CO_(2),which has achieved good results.展开更多
文摘A discrete-event system simulation and animation program was developed to enhance the efficiency of a truck-excavator operation and reduce the environmental impact of haulage in an open-cut coal mine with multiple-pit operations. In any mine, a key objective is to have sufficient equipment for production and not to have excess to where it becomes counterproductive. Due to the advent of responsible mining,environmental regulations, and eco-friendly practices, these factors must also be considered in the analysis. Simulation studies can be financially advantageous for both the optimization of existing mine operations and new development phases in a mine. This study is a new approach to use discrete-event system simulation for mine systems, in order to investigate and possibly reduce environmental impact considering mining haulage performance and production target. A hypothetical layout of a surface coal mine with two pit operations was used for the simulation and animation model. The simulation model includes the animation of the operation. Animation is helpful to enhance the benefit of a mine simulation model. GPSS/Hòand Proof Professionalòwere the software used for the investigation.
文摘This paper analyzes the main problems of Sinopec Beijing Yanshan Petrochemical Co.,Ltd.,such as decentralized steam system layout,many types of fuels,obvious increase in fuel cost,low operation efficiency of turbine and boiler and high self consumption loss,and puts forward and implements optimization and improvement measures such as pressure raising transformation of natural gas system,adjustment of energy consumption structure,reduction of energy consumption cost,improvement of steam production quality and equipment efficiency.The results showed that compared with the fuel consumption in 2018,the consumption of coal coke was reduced by 550000 t,the consumption of natural gas was increased by 170000 t,and the total consumption of fuel gas and fuel oil was increased by 50000 t,equivalent to 246000 t of standard coal;the purchased electricity was increased by about 5×10^(8) kW·h.Green power trading and 14.76 MW distributed photovoltaic projects were carried out.According to the calculation of 1400-1600 h annual power generation in class II photovoltaic areas and the emission factor of North China regional power grid baseline,the annual emission reduction was about 55000 t CO_(2) in 2021.After the above transformation,the goal of zero-coking is achieved;the steam consumption of units is reduced by 21.5%,the steam production of boilers is reduced by 24.9%,and the annual emission reduction is about 760000 t CO_(2),which has achieved good results.