The bearing capacity testing and evaluation of the existing bridge engineering structure is not only the key to clarify its structural quality and safety performance,but it also can lay a solid foundation for subseque...The bearing capacity testing and evaluation of the existing bridge engineering structure is not only the key to clarify its structural quality and safety performance,but it also can lay a solid foundation for subsequent repairs and maintenance work.To ensure the bearing capacity,durability and reliability of existing bridges,this paper analyzes the importance and methods of testing and evaluation of structural bearing capacity of a bridge.This analysis aims to provide scientific reference for the quality assessment and subsequent repair and maintenance of existing bridge engineering structures.展开更多
This article uses real engineering projects as examples to analyze how static load test technology is applied in testing the bridge-bearing capacity.The analysis covers aspects such as testing section layout,test load...This article uses real engineering projects as examples to analyze how static load test technology is applied in testing the bridge-bearing capacity.The analysis covers aspects such as testing section layout,test load and efficiency coefficient,loading plan,evaluation optimization,test result modification,and result evaluation.The aim is to support the accurate detection and evaluation of bridge-bearing capacity.展开更多
Dongying City, which is the most important central city in the Yellow River Delta, is located in the estuary of the Yellow River. With a short land formation time, ecological environment is very weak in this area. To ...Dongying City, which is the most important central city in the Yellow River Delta, is located in the estuary of the Yellow River. With a short land formation time, ecological environment is very weak in this area. To realize the sustainable economic development of the Yellow River Delta, resource environment and resource environmental bearing capacity(REBC) must be improved. This study builds assessment system of regional REBC through resource and economic characteristics in Yellow River Delta and uses principal component analysis(PCA) method to evaluate REBC of five counties and districts in Dongying City in 2011-2015 on the dimensions of time and space. Results show that, on the time dimension, Guangrao County is ranked first, Dongying district second for four years and Hekou and Kenli districts with lower ranks in 2012-2015, indicating that more attention needs to be paid to REBC of Hekou and Dongying districts and these two districts should be included into key monitoring areas. From space scale, REBC in five counties and districts has been gradually improving. In order to further develop REBC in Dongying City, measures such as intensifying protection of urban ecological environment and developing circular economy, etc. should be implemented.展开更多
In the background of a new round reform and western development strategy, making suitability evaluation of construction land complex topography area in southwest China scientifically and accurately has an important gu...In the background of a new round reform and western development strategy, making suitability evaluation of construction land complex topography area in southwest China scientifically and accurately has an important guiding significance on the construction of local urban and rural development. We selected economic factor of construction, safety factor of construction, factor of the present situation of land use and ecological protection factor in Tongzi county as evaluation indexes, and ascertained the weight of each elastic indicator using the analytic hierarchy process method. By the support of GIS and RS technology, we combined the single-factor qualitative classification with the multi-factor weighted overlay analysis to make comprehensive suitability evaluation of construction land on the whole study area. And five different types of construction land were divided, namely, ‘excellent', ‘very good', ‘good', ‘moderate' and ‘poor'. The result shows that the area of ‘excellent' construction land is 30.47 km^2(0.95%), 101.46 km^2(3.16%) of ‘very good', 550.34 km^2(17.16%) of ‘good', and 664.69 km^2(20.72%) and 1 860.65 km^2(58.01%) of ‘moderate' and ‘poor', respectively. The land space bearing capacity is a population of 791 600, and the remaining population capacity is 170 900 persons.展开更多
This design is about Chongqing Wanzhou district KanKan river crossing test evaluation and reinforcement renovation. The bridge is an open spandrel stone arch bridge. After years of operating, defects arise from differ...This design is about Chongqing Wanzhou district KanKan river crossing test evaluation and reinforcement renovation. The bridge is an open spandrel stone arch bridge. After years of operating, defects arise from different parts. To verify whether the bridge meets the bearing capacity of highway grade I standard, this design firstly evaluates the bridge through the apparent diseases. Then it uses Midas/Civil to calculate the bearing capacity of lateral control section for Zhou Jiaba arch foot, L/4 and arch section. Using Midas/Civil control section load calculation, load test plan is made. In the end, by increasing cross-section method, the bridge reinforcement maintenance plan is made;that is increasing abdominal 26 cm concrete layer in the main arch ring of arch so that the bridge meets grade I highway capacity requirements.展开更多
文摘The bearing capacity testing and evaluation of the existing bridge engineering structure is not only the key to clarify its structural quality and safety performance,but it also can lay a solid foundation for subsequent repairs and maintenance work.To ensure the bearing capacity,durability and reliability of existing bridges,this paper analyzes the importance and methods of testing and evaluation of structural bearing capacity of a bridge.This analysis aims to provide scientific reference for the quality assessment and subsequent repair and maintenance of existing bridge engineering structures.
文摘This article uses real engineering projects as examples to analyze how static load test technology is applied in testing the bridge-bearing capacity.The analysis covers aspects such as testing section layout,test load and efficiency coefficient,loading plan,evaluation optimization,test result modification,and result evaluation.The aim is to support the accurate detection and evaluation of bridge-bearing capacity.
基金jointly funded by The National Natural Science Fund Project(41602356)Open Projects of Key REBC Laboratories supported by the Ministry of Land and Resources(Number:CCA2016.08)+1 种基金Shandong Provincial Geological Prospecting Fund Project(Prospecting number in Shandong Province:2013(55)2016(07))
文摘Dongying City, which is the most important central city in the Yellow River Delta, is located in the estuary of the Yellow River. With a short land formation time, ecological environment is very weak in this area. To realize the sustainable economic development of the Yellow River Delta, resource environment and resource environmental bearing capacity(REBC) must be improved. This study builds assessment system of regional REBC through resource and economic characteristics in Yellow River Delta and uses principal component analysis(PCA) method to evaluate REBC of five counties and districts in Dongying City in 2011-2015 on the dimensions of time and space. Results show that, on the time dimension, Guangrao County is ranked first, Dongying district second for four years and Hekou and Kenli districts with lower ranks in 2012-2015, indicating that more attention needs to be paid to REBC of Hekou and Dongying districts and these two districts should be included into key monitoring areas. From space scale, REBC in five counties and districts has been gradually improving. In order to further develop REBC in Dongying City, measures such as intensifying protection of urban ecological environment and developing circular economy, etc. should be implemented.
基金Funded by National Natural Science Foundation of China(No.40771135No.41201546+6 种基金and No 41261038)Special Project for Technological Basic Work of China(No.2011FY110400)Basic and Frontier Research Project in Chongqing of China(No.cstc2014jcyj A1557)Science and Technology Project of Chongqing Municipal Education Commission(No.KJ130625)Science and Technology Planning of Guizhou Province in China(Qiankehe JZ code[2014]200206)Natural Science Foundation of Chongqing in China(No.cstc2012jj A20010)Chongqing Normal University Graduate Student Research Innovation Project(No.YKC14010)
文摘In the background of a new round reform and western development strategy, making suitability evaluation of construction land complex topography area in southwest China scientifically and accurately has an important guiding significance on the construction of local urban and rural development. We selected economic factor of construction, safety factor of construction, factor of the present situation of land use and ecological protection factor in Tongzi county as evaluation indexes, and ascertained the weight of each elastic indicator using the analytic hierarchy process method. By the support of GIS and RS technology, we combined the single-factor qualitative classification with the multi-factor weighted overlay analysis to make comprehensive suitability evaluation of construction land on the whole study area. And five different types of construction land were divided, namely, ‘excellent', ‘very good', ‘good', ‘moderate' and ‘poor'. The result shows that the area of ‘excellent' construction land is 30.47 km^2(0.95%), 101.46 km^2(3.16%) of ‘very good', 550.34 km^2(17.16%) of ‘good', and 664.69 km^2(20.72%) and 1 860.65 km^2(58.01%) of ‘moderate' and ‘poor', respectively. The land space bearing capacity is a population of 791 600, and the remaining population capacity is 170 900 persons.
文摘This design is about Chongqing Wanzhou district KanKan river crossing test evaluation and reinforcement renovation. The bridge is an open spandrel stone arch bridge. After years of operating, defects arise from different parts. To verify whether the bridge meets the bearing capacity of highway grade I standard, this design firstly evaluates the bridge through the apparent diseases. Then it uses Midas/Civil to calculate the bearing capacity of lateral control section for Zhou Jiaba arch foot, L/4 and arch section. Using Midas/Civil control section load calculation, load test plan is made. In the end, by increasing cross-section method, the bridge reinforcement maintenance plan is made;that is increasing abdominal 26 cm concrete layer in the main arch ring of arch so that the bridge meets grade I highway capacity requirements.