Glutamatergic projection neurons generate sophisticated excitatory circuits to integrate and transmit information among different cortical areas,and between the neocortex and other regions of the brain and spinal cord...Glutamatergic projection neurons generate sophisticated excitatory circuits to integrate and transmit information among different cortical areas,and between the neocortex and other regions of the brain and spinal cord.Appropriate development of cortical projection neurons is regulated by certain essential events such as neural fate determination,proliferation,specification,differentiation,migration,survival,axonogenesis,and synaptogenesis.These processes are precisely regulated in a tempo-spatial manner by intrinsic factors,extrinsic signals,and neural activities.The generation of correct subtypes and precise connections of projection neurons is imperative not only to support the basic cortical functions(such as sensory information integration,motor coordination,and cognition)but also to prevent the onset and progression of neurodevelopmental disorders(such as intellectual disability,autism spectrum disorders,anxiety,and depression).This review mainly focuses on the recent progress of transcriptional regulations on the development and diversity of neocortical projection neurons and the clinical relevance of the failure of transcriptional modulations.展开更多
A two-dimensional flow numerical model of the tidal reaches, which total length is more than 700 km, is established from Datong to the Yangtze River estuary. The tidal levels, velocities, diversion ratios and dynamic ...A two-dimensional flow numerical model of the tidal reaches, which total length is more than 700 km, is established from Datong to the Yangtze River estuary. The tidal levels, velocities, diversion ratios and dynamic axes before and after the separate regulation of each reach and combined regulation of all reaches are obtained. The comparative analysis shows that the regulation project of a separate reach basically has no impact on velocity distributions and variations of diversion ratios of upper and lower reaches, the variations of dynamic axes are only within the local scope of the project. The regulation project of a separate reach also has less impact on the water level in the lower adjacent reaches, but will make the water levels in the upper reaches rise. After the implementation of the regulation projects for all reaches, the rise of water level in the upstream reaches will have a cumulative impact.展开更多
The important role of Three Gorges Project (TGP) in the flood management of the Yangtze River Basin is summarized.The Optimal Regulation Schemes of the Three Gorge Reservoir is briefly described.The flood regulation e...The important role of Three Gorges Project (TGP) in the flood management of the Yangtze River Basin is summarized.The Optimal Regulation Schemes of the Three Gorge Reservoir is briefly described.The flood regulation effect of TGP is analyzed.Typical issues related to reservoir operation for flood regulation are discussed and suggestions are put forward for the future work.展开更多
The problems of environmental geology refer to the geologic phenomena, incidents or accidents arising from action of environmental geology. The action is mainly the mutual influence between human activity and geologic...The problems of environmental geology refer to the geologic phenomena, incidents or accidents arising from action of environmental geology. The action is mainly the mutual influence between human activity and geologic environment. When human activity is uncoordinated with objective laws of the geologic environment, the problems of environmental geology or economic loss would occur.Therefore,the level and the changing orientation of geologic environmental quality are relative to the types of human activity,particularly relative to human intentional-activities of geologic environmental exploitation project. The geologic environment fitting to mining may not fit to urban construction,and fitting to water conservancy and hydroelectric projects may not fit to communication,and so on.Economy evaluation on the profit and loss of geologic environmental quality is exactly to depict the level of the profit and loss of geologic environmental quality about geologic environmental exploitation projects and the展开更多
With the implementation of the CPC's eight-point regulation as a natural experiment platform, this paper seeks to unravel the causality between rent-seeking and firm performance for SOEs and private firms respectivel...With the implementation of the CPC's eight-point regulation as a natural experiment platform, this paper seeks to unravel the causality between rent-seeking and firm performance for SOEs and private firms respectively. Our empirical research has found that after the release of the "eight-point regulation ", investors responded negatively to private frms and positively to SOEs. Such market response is more significant for firms with a high degree of rent-seeking. Further research has found that rent-seeking helps both SOEs and private firms receive more subsidies from the government. While government subsidy from rent-seeking is conducive to the performance of private firms, it is not the case for SOEs. This implies that rent-seeking activities serve as a "lubricant'for private firms but have a "stumbling block" effect for SOEs.展开更多
The process of constructing hydraulic projects on international rivers is governed by several legal regulations, among the most important of these regulations are: the Principle of no harm, and the Principle of Prior...The process of constructing hydraulic projects on international rivers is governed by several legal regulations, among the most important of these regulations are: the Principle of no harm, and the Principle of Prior Notification, protection of the river's environment and the Principle of Settling the International Disputes via Peaceful Means, which is considered one of the most important principles called for by the UN Pact, as it provides for adopting the peaceful means by the member states of the organization to settle international disputes through peaceful means, in addition to an applied study on the Nile Basin's projects.展开更多
One of the roles of nuctear regulators is to review population projections calculated by applicants for populations lying in the vicinity of nuclear power plants. This paper examines methods of calculating rates of gr...One of the roles of nuctear regulators is to review population projections calculated by applicants for populations lying in the vicinity of nuclear power plants. This paper examines methods of calculating rates of growth and thus calculating future population growth. This paper is concerned about regulators making sure that nuclear power plants are not located near densely populated centers and that population centers located near nuclear power plants do not become densely populated. In the case of El Dabaa city in the north coast of Egypt, south west of the nominated plant site, three rates of growth 1.5%, 2.5% and 3% were identified. The first is the current population growth rate of the city, the second is the average national growth rate and the third is the expected growth rate of the city when the nuclear power plant gets constructed and operated. In all three cases, this city is a population center and rules of distance from the nuclear power plant shall apply. Thus the further natural growth of this city should be controlled and directed away from the downwind of the plant.展开更多
China is country of massive agriculture.Although it has gradually changed from traditionalagriculture to modern agriculture in recent years, thereare still many problems in the transition. Rivers playan important role...China is country of massive agriculture.Although it has gradually changed from traditionalagriculture to modern agriculture in recent years, thereare still many problems in the transition. Rivers playan important role in water conservancy projects offarmland. Therefore, full attention should be paid toriver management of farmland. This thesis analyzes itand proposes countermeasures for governance.展开更多
基金supported by Guangdong Provincial Basic and Applied Basic Research Fund,No.2021A1515011299(to KT)。
文摘Glutamatergic projection neurons generate sophisticated excitatory circuits to integrate and transmit information among different cortical areas,and between the neocortex and other regions of the brain and spinal cord.Appropriate development of cortical projection neurons is regulated by certain essential events such as neural fate determination,proliferation,specification,differentiation,migration,survival,axonogenesis,and synaptogenesis.These processes are precisely regulated in a tempo-spatial manner by intrinsic factors,extrinsic signals,and neural activities.The generation of correct subtypes and precise connections of projection neurons is imperative not only to support the basic cortical functions(such as sensory information integration,motor coordination,and cognition)but also to prevent the onset and progression of neurodevelopmental disorders(such as intellectual disability,autism spectrum disorders,anxiety,and depression).This review mainly focuses on the recent progress of transcriptional regulations on the development and diversity of neocortical projection neurons and the clinical relevance of the failure of transcriptional modulations.
基金financially supported by the Major Project"Golden Waterway Capacity Enhancement Technology"of Ministry of Transport of China(Grant No.201132874640)
文摘A two-dimensional flow numerical model of the tidal reaches, which total length is more than 700 km, is established from Datong to the Yangtze River estuary. The tidal levels, velocities, diversion ratios and dynamic axes before and after the separate regulation of each reach and combined regulation of all reaches are obtained. The comparative analysis shows that the regulation project of a separate reach basically has no impact on velocity distributions and variations of diversion ratios of upper and lower reaches, the variations of dynamic axes are only within the local scope of the project. The regulation project of a separate reach also has less impact on the water level in the lower adjacent reaches, but will make the water levels in the upper reaches rise. After the implementation of the regulation projects for all reaches, the rise of water level in the upstream reaches will have a cumulative impact.
文摘The important role of Three Gorges Project (TGP) in the flood management of the Yangtze River Basin is summarized.The Optimal Regulation Schemes of the Three Gorge Reservoir is briefly described.The flood regulation effect of TGP is analyzed.Typical issues related to reservoir operation for flood regulation are discussed and suggestions are put forward for the future work.
文摘The problems of environmental geology refer to the geologic phenomena, incidents or accidents arising from action of environmental geology. The action is mainly the mutual influence between human activity and geologic environment. When human activity is uncoordinated with objective laws of the geologic environment, the problems of environmental geology or economic loss would occur.Therefore,the level and the changing orientation of geologic environmental quality are relative to the types of human activity,particularly relative to human intentional-activities of geologic environmental exploitation project. The geologic environment fitting to mining may not fit to urban construction,and fitting to water conservancy and hydroelectric projects may not fit to communication,and so on.Economy evaluation on the profit and loss of geologic environmental quality is exactly to depict the level of the profit and loss of geologic environmental quality about geologic environmental exploitation projects and the
基金"A Study on the Rent-seeking,Political Capital Burst and Economic Consequences of Private Enterprises,Based on the Perspective of Officials Arrest"(Grant No.71702178),National Natural Sciences Foundation"Anti-Corruption,Reconstruction of the Relationship Between Government and Enterprises Social Capital Investment:An Integrated Research Based on Social Relation Network Theory"(Grant No.17YJC790005),MOE Project of Humanities and Social Sciences Foundation
文摘With the implementation of the CPC's eight-point regulation as a natural experiment platform, this paper seeks to unravel the causality between rent-seeking and firm performance for SOEs and private firms respectively. Our empirical research has found that after the release of the "eight-point regulation ", investors responded negatively to private frms and positively to SOEs. Such market response is more significant for firms with a high degree of rent-seeking. Further research has found that rent-seeking helps both SOEs and private firms receive more subsidies from the government. While government subsidy from rent-seeking is conducive to the performance of private firms, it is not the case for SOEs. This implies that rent-seeking activities serve as a "lubricant'for private firms but have a "stumbling block" effect for SOEs.
文摘The process of constructing hydraulic projects on international rivers is governed by several legal regulations, among the most important of these regulations are: the Principle of no harm, and the Principle of Prior Notification, protection of the river's environment and the Principle of Settling the International Disputes via Peaceful Means, which is considered one of the most important principles called for by the UN Pact, as it provides for adopting the peaceful means by the member states of the organization to settle international disputes through peaceful means, in addition to an applied study on the Nile Basin's projects.
文摘One of the roles of nuctear regulators is to review population projections calculated by applicants for populations lying in the vicinity of nuclear power plants. This paper examines methods of calculating rates of growth and thus calculating future population growth. This paper is concerned about regulators making sure that nuclear power plants are not located near densely populated centers and that population centers located near nuclear power plants do not become densely populated. In the case of El Dabaa city in the north coast of Egypt, south west of the nominated plant site, three rates of growth 1.5%, 2.5% and 3% were identified. The first is the current population growth rate of the city, the second is the average national growth rate and the third is the expected growth rate of the city when the nuclear power plant gets constructed and operated. In all three cases, this city is a population center and rules of distance from the nuclear power plant shall apply. Thus the further natural growth of this city should be controlled and directed away from the downwind of the plant.
文摘China is country of massive agriculture.Although it has gradually changed from traditionalagriculture to modern agriculture in recent years, thereare still many problems in the transition. Rivers playan important role in water conservancy projects offarmland. Therefore, full attention should be paid toriver management of farmland. This thesis analyzes itand proposes countermeasures for governance.