期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Key rock mechanical problems of underground powerhouse in Shuibuya hydropower station 被引量:2
1
作者 Aiqing Wu1,Qigui Yang2,Xiuli Ding1,Huoming Zhou1,Bo Lu1 1 Key Laboratory of Geotechnical Mechanics and Engineering of Ministry of Water Resources,Yangtze River Scientific Research Institute,Wuhan 430010,China 2 Changjiang Institute of Survey,Planning,Design and Research,Wuhan,430010,China 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第1期64-72,共9页
The complicated rock structures and the stability of surrounding rocks of the underground powerhouse were the key rock mechanical problems in Shuibuya hydropower station.In order to overcome the related rock mechanica... The complicated rock structures and the stability of surrounding rocks of the underground powerhouse were the key rock mechanical problems in Shuibuya hydropower station.In order to overcome the related rock mechanical problems encountered during its construction,a comprehensive research was carried out for the underground powerhouse in Shuibuya hydropower station based on a detailed geological survey.It covers the investigations on the initial in-situ stress distribution features,rock mechanical properties,engineering rock mass classifications by different methods,numerical modeling for stability and support analysis,proper measures for rock excavation and support.The results show that the rock excavations of the underground powerhouse under the given geological conditions can be controlled effectively.Some measures,suggested by the designers,are proved to be rational and effective.These measures mainly consist of:(1) the soft rock replacements by concrete in local area below the crane beam,(2) the shotcrete and reinforcement by rock bolts and anchor cables in surrounding rocks,and (3) 2 m concrete placement on the rock bench between adjacent tailrace tubes.The engineering practice shows that the treated surrounding rocks have a good overall stability.The deformation behaviors observed by safety equipments are within the designing limits.The research conclusions on the related rock mechanical problems,prior to the underground powerhouse excavations,are reliable. 展开更多
关键词 Shuibuya hydropower station underground powerhouse stability of surrounding rocks rock excavation and support soft rock replacement
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部