期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Finite Element Analysis Study of Box Culvert Jacking-Out Construction under Existing Railway Line
1
作者 Senqiang Lu Yating Sun Qiaowen Hu 《Engineering(科研)》 CAS 2023年第3期196-206,共11页
To shorten the existing box culvert demolition construction period and ensure the normal operation of the railway, the jacking-out construction method was adopted. The ABAQUS finite element software was used to establ... To shorten the existing box culvert demolition construction period and ensure the normal operation of the railway, the jacking-out construction method was adopted. The ABAQUS finite element software was used to establish a three-dimensional model of the box culvert and soil body of the relying project, and three excavation thickness (0m, 1 m, 2 m) were used as the main variation parameters for numerical analysis and research, and the change law of the box culvert itself and soil body stress during the culvert jacking out process was obtained. The results show that the jacking force-displacement curves of the three working conditions can be divided into two stages, and the jacking force reaches the maximum value at the moment when the static friction turns into sliding friction at the end of the first stage. The stress distribution at the bottom slab of the box culvert in the jacking process is approximately normal, and the stress decreases with the increase of the roadbed excavation thickness. The increase of the roadbed excavation thickness can reduce the soil pressure on the side of the box culvert and effectively reduce the deformation of the roadbed in the jacking-out process. The deformation of the roadbed during the jacking process can be reduced by increasing the thickness of the roadbed excavation. 展开更多
关键词 existing Box culvert Jacking-Out Construction Excavation Thickness Jacking Force
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部