Test and Analysis of an Existing Tunnel Vibration Induced by Blasting Construction of Diaphragm Wall 被引量:1
1
作者 于光喜 禹海涛 +4 位作者 柳献 袁勇 王庆国 程国荣 吴晓峰 《Transactions of Tianjin University》 EI CAS 2008年第B10期569-575,共7页
According to the blasting construction of the diaphragm wall of Puxi approaching section of East Fuxing Road river-crossing tunnel, the monitoring project of the vibration of the existing tun-nel induced by the blasti... According to the blasting construction of the diaphragm wall of Puxi approaching section of East Fuxing Road river-crossing tunnel, the monitoring project of the vibration of the existing tun-nel induced by the blasting construction is put forward, which includes the sensors’ location, moni-tor method and the vibration monitoring system. Based on the monitoring data of the explosion vibration, the vibration wave forms, velocities, acceleration responses, main frequencies and fields of measure points are analyzed under the conditions of three locations and different charge quanti-ties. According to the safety-judging standard of explosion vibration, the conclusion that the exist- ing tunnel is safe under the explosion vibration is then drawn. Furthermore, the spectrum character-istics of three explosion vibrations and the spectrum changing properties of explosion vi-bration wave transmitting in different directions are concluded, which can provide reference to similar projects. 展开更多
关键词 diaphragm wall explosion vibration vibration monitoring TUNNEL spectrum properties
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部