Drilling engineering has great uncertainty and it always involves huge investment and high risk. Risk analysis of extended reach drilling (ERD) is very important to prevent complex failures and to improve drilling e...Drilling engineering has great uncertainty and it always involves huge investment and high risk. Risk analysis of extended reach drilling (ERD) is very important to prevent complex failures and to improve drilling efficiency. Nowadays there are few reports on how to analyze quantitatively the drilling risk for extended reach wells (ERWs). Based on the fuzzy set theory, a comprehensive fuzzy evaluation model for analyzing risks of ERD is proposed in this paper. Well B6ERW07 is a planned 8,000-meter ERW with a high ratio of horizontal displacement (HD) to vertical depth (VD) in the Liuhua Oilfield, the South China Sea, China. On the basis of the evaluation model developed in this study, the risk for drilling Well B6ERW07 was evaluated before drilling. The evaluation result shows that the success rate of drilling this well is predicted to be 51.9%, providing important rational and scientific information for the decisionmakers.展开更多
Extended reach wells (ERWs), especially horizontal extended reach well with a high HD (horizontal displacement) to TVD (true vertical depth) ratio, represent a frontier technology and challenge the drilling limi...Extended reach wells (ERWs), especially horizontal extended reach well with a high HD (horizontal displacement) to TVD (true vertical depth) ratio, represent a frontier technology and challenge the drilling limitations. Oil and gas reservoir in beaches or lakes and offshore can be effectively exploited by using extended reach drilling (ERD) technology. This paper focuses on the difficult technological problems encountered during exploiting the Liuhua 11-1 oil field in the South China Sea, China. Emphasis is on investigating the key subjects including prediction and control of open hole limit extension in offshore ERD, prediction of casing wear and its prevention and torque reduction, φ244.5mm casing running with floating collars to control drag force, and steerable drilling modes. The basic concept of limit extension in ERD is presented and the prediction method for open hole limit extension is given in this paper. A set of advanced drilling mechanics and control technology has been established and its practical results are verified by field cases. All those efforts may be significant for further investigating and practicing ERD limit theory and control technology in the future.展开更多
A stuck drill string results in a major non-productive cost in extended reach drilling engineering. The first step is to determine the depth at which the sticking has occurred. Methods of measurement have been proved ...A stuck drill string results in a major non-productive cost in extended reach drilling engineering. The first step is to determine the depth at which the sticking has occurred. Methods of measurement have been proved useful for determining the stuck points, but these operations take considerable time. As a result of the limitation with the current operational practices, calculation methods are still preferred to estimate the stuck point depth. Current analytical methods do not consider friction and are only valid for vertical rather than extended reach wells. The numerical method is established to take full account of down hole friction, tool joint, upset end of drill pipe, combination drill strings and tubular materials so that it is valid to determine the stuck point in extended reach wells. The pull test, torsion test and combined test of rotation and pulling can be used to determine the stuck point. The results show that down hole friction, tool joint, upset end of drill pipe, tubular sizes and materials have significant effects on the pull length and/or the twist angle of the stuck drill string.展开更多
Intermediate casings in the build sections are subject to severe wear in extended-reach drilling. This paper presents a new method for predicting the depth of a wear groove on the intermediate casing. According to ene...Intermediate casings in the build sections are subject to severe wear in extended-reach drilling. This paper presents a new method for predicting the depth of a wear groove on the intermediate casing. According to energy principle and dynamic accumulation of casing wear by tool joints, a model is established to calculate the wear area on the inner wall of the casing. The relationship functions between the wear groove depth and area are obtained based on the geometry relationship between the drillstring and the wear section and the assumption that the casing wear groove is crescent-shaped. The change of casing wear groove depth versus drilling footage under different-sized drillstrings is also discussed. A mechanical model is proposed for predicting casing wear location, which is based on the well trajectory and drillstring movement. The casing wear groove depth of a planned well is predicted with inversion of the casing wear factor from the drilled well and necessarily revised to improve the prediction accuracy for differences between the drilled well and the planned well. The method for predicting casing wear in extended-reach drilling is verified through actual case study. The effect of drillstring size on casing wear should be taken into account in casing wear prediction.展开更多
The well cementing is important during the extended reach well drilling and the completion, whereas the displacement efficiency and the interface stability are important to guarantee the success of the cementing. In t...The well cementing is important during the extended reach well drilling and the completion, whereas the displacement efficiency and the interface stability are important to guarantee the success of the cementing. In this paper, the interface stability of the cement slurry is simulated using the computational fluid dynamics software. The calculation results indicate that during the displacement, the length of the displacement interface increases with the increase of the deviation angle. The larger the eccentricity, the more significant the velocity difference, along with a longer displacement interface length, a less stable interface, and a lower displacement efficiency. Therefore, to guarantee the cementing quality and maintain a high displacement efficiency, the eccentricity should be controlled within 0.5. Application of a casing centralizer will dramatically improve the interface stability, decrease the dilution zone length of the interface and thus, is beneficial to the slurry cementing and displacement. The simulations are verified with an average absolute deviation less than 3.76% and the 45? helix angle of the rigid centralizer is recommended. Combining the data of an extended reach well on-site, methods are proposed for improving the displacement efficiency and the interface stability during the well cementing and displacement with complex boreholes. These numerical methods can be used to provide some theoretical guidance for designing the cementing of an extended reach well.展开更多
基金support from the project of CNOOC China Limited-Shenzhen (Grant No. Z2007SLSZ-034)the foundation project of the State Key Laboratory of Petroleum Resource and Prospecting (Grant No. PRPDX2008-08) is gratefully acknowledged
文摘Drilling engineering has great uncertainty and it always involves huge investment and high risk. Risk analysis of extended reach drilling (ERD) is very important to prevent complex failures and to improve drilling efficiency. Nowadays there are few reports on how to analyze quantitatively the drilling risk for extended reach wells (ERWs). Based on the fuzzy set theory, a comprehensive fuzzy evaluation model for analyzing risks of ERD is proposed in this paper. Well B6ERW07 is a planned 8,000-meter ERW with a high ratio of horizontal displacement (HD) to vertical depth (VD) in the Liuhua Oilfield, the South China Sea, China. On the basis of the evaluation model developed in this study, the risk for drilling Well B6ERW07 was evaluated before drilling. The evaluation result shows that the success rate of drilling this well is predicted to be 51.9%, providing important rational and scientific information for the decisionmakers.
基金support from the project of CNOOC China Limited-Shenzhen (Grant No. Z2007SLSZ-034)the foundation project of the State Key Laboratory of Petroleum Resource and Prospecting (Grant No. PRPDX2008-08) is gratefully acknowledged
文摘Extended reach wells (ERWs), especially horizontal extended reach well with a high HD (horizontal displacement) to TVD (true vertical depth) ratio, represent a frontier technology and challenge the drilling limitations. Oil and gas reservoir in beaches or lakes and offshore can be effectively exploited by using extended reach drilling (ERD) technology. This paper focuses on the difficult technological problems encountered during exploiting the Liuhua 11-1 oil field in the South China Sea, China. Emphasis is on investigating the key subjects including prediction and control of open hole limit extension in offshore ERD, prediction of casing wear and its prevention and torque reduction, φ244.5mm casing running with floating collars to control drag force, and steerable drilling modes. The basic concept of limit extension in ERD is presented and the prediction method for open hole limit extension is given in this paper. A set of advanced drilling mechanics and control technology has been established and its practical results are verified by field cases. All those efforts may be significant for further investigating and practicing ERD limit theory and control technology in the future.
基金support from the national projects(Grant No.:2011ZX05009-005and2010CB226703)
文摘A stuck drill string results in a major non-productive cost in extended reach drilling engineering. The first step is to determine the depth at which the sticking has occurred. Methods of measurement have been proved useful for determining the stuck points, but these operations take considerable time. As a result of the limitation with the current operational practices, calculation methods are still preferred to estimate the stuck point depth. Current analytical methods do not consider friction and are only valid for vertical rather than extended reach wells. The numerical method is established to take full account of down hole friction, tool joint, upset end of drill pipe, combination drill strings and tubular materials so that it is valid to determine the stuck point in extended reach wells. The pull test, torsion test and combined test of rotation and pulling can be used to determine the stuck point. The results show that down hole friction, tool joint, upset end of drill pipe, tubular sizes and materials have significant effects on the pull length and/or the twist angle of the stuck drill string.
基金support from the national projects (Grant No.: 2009ZX05009-005 and 2010CB226703)
文摘Intermediate casings in the build sections are subject to severe wear in extended-reach drilling. This paper presents a new method for predicting the depth of a wear groove on the intermediate casing. According to energy principle and dynamic accumulation of casing wear by tool joints, a model is established to calculate the wear area on the inner wall of the casing. The relationship functions between the wear groove depth and area are obtained based on the geometry relationship between the drillstring and the wear section and the assumption that the casing wear groove is crescent-shaped. The change of casing wear groove depth versus drilling footage under different-sized drillstrings is also discussed. A mechanical model is proposed for predicting casing wear location, which is based on the well trajectory and drillstring movement. The casing wear groove depth of a planned well is predicted with inversion of the casing wear factor from the drilled well and necessarily revised to improve the prediction accuracy for differences between the drilled well and the planned well. The method for predicting casing wear in extended-reach drilling is verified through actual case study. The effect of drillstring size on casing wear should be taken into account in casing wear prediction.
基金Project supported by the National Basic Research Deve-lopment Program of China(973 Program,2015CB251200)the National Science and Technology Major Project(Grant No.2016ZX05020-006)the Changjiang Scholars and Innovative Research Team in University Project(Grant No.IRT_14R58)
文摘The well cementing is important during the extended reach well drilling and the completion, whereas the displacement efficiency and the interface stability are important to guarantee the success of the cementing. In this paper, the interface stability of the cement slurry is simulated using the computational fluid dynamics software. The calculation results indicate that during the displacement, the length of the displacement interface increases with the increase of the deviation angle. The larger the eccentricity, the more significant the velocity difference, along with a longer displacement interface length, a less stable interface, and a lower displacement efficiency. Therefore, to guarantee the cementing quality and maintain a high displacement efficiency, the eccentricity should be controlled within 0.5. Application of a casing centralizer will dramatically improve the interface stability, decrease the dilution zone length of the interface and thus, is beneficial to the slurry cementing and displacement. The simulations are verified with an average absolute deviation less than 3.76% and the 45? helix angle of the rigid centralizer is recommended. Combining the data of an extended reach well on-site, methods are proposed for improving the displacement efficiency and the interface stability during the well cementing and displacement with complex boreholes. These numerical methods can be used to provide some theoretical guidance for designing the cementing of an extended reach well.