In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis c...In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis curve is also considered when the earth is under cyclic load. The research work can make the calculation results of plastic collapse more accurate by including the effect of the post-earthquake degree of plastic deformation on the stability of the earth-rock dam, and the dam safety factor decreases from 2.50 to 1.90 after the magnitude-8 earthquake. Moreover, the research work will also improve the design of the earth-rock dam under abnormal operating conditions.展开更多
During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progres...During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progresses.Accurate identification of the risk factors,as well as clearing any possible effect that any risk factors might have on the construction project is the key and foundation to our cooperative control of the construction goals.According to the construction planning of earth-rock dam,the hall3 D structure was used to identify the potential changes of risk factors,and the possible means of any risk factors to interfere with the construction goals.The dynamic risk assessment index system is established by deploying the WBS-RBS(work breakdown structurerisk breakdown structure)method,aiming at the construction goals of earth-rock dam.The case study shows that the index system is very effective at risk management of earth-rock dam during construction,and relatively practicable.展开更多
Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- d...Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- dropower projects, the life-cycle risk management system of high earth-rock dam project for Nuozhadu project was developed. The system mainly includes digital dam, three-dimensional design, construction quality monito- ring, safety assessment and warning, etc, to integrally manage and analyze the dam design, constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safe- ty quality monitoring in the project life cycle, and provided the basic platform for the scientific management of the construction and operation safety of high earth-rock dam. Application in Nuozhadu earth-rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality, and provided a new way for the quality safety control of high earth-rock dam.展开更多
Based on raw data from dams damaged in the Wenchuan earthquake, including many that were severely damaged, characteristics and factors that influenced the damage are discussed in this paper. Findings from this study i...Based on raw data from dams damaged in the Wenchuan earthquake, including many that were severely damaged, characteristics and factors that influenced the damage are discussed in this paper. Findings from this study include: severely damaged dams were densely distributed along the seismologic fault; small dams, especially small earth-rock dams, had the most serious damage that was caused by a variety of factors; the most serious damage was caused by seismic waves; damage was aggregated by aftershocks; and the extent of the damage patterns increased with the seismic intensity. Damage patterns varied in different intensity zones and cracking was the most common type of damage. Most of the dams had a good base with relatively high bearing capacity, and the walls of the earth-rock dams were mostly of clay soil. This type of base and body material mitigated some of the damage to dams. Reservoir maintenance and other factors also have a significant impact on the seismic safety of the dam. Finally, some recommendations to reduce seismic damage to dams are proposed.展开更多
In this study,a numerical model,which can capture the full process of the development of seepage passages,the collapse of dams and the failure due to overtopping,is proposed for earth-rock dams.The critical incipient ...In this study,a numerical model,which can capture the full process of the development of seepage passages,the collapse of dams and the failure due to overtopping,is proposed for earth-rock dams.The critical incipient velocity for the occurrence of seepage failure is derived by analyzing the forces acting on soil particles in the seepage passage.The sediment transport formula is proposed to simulate the erosion process and the evolution of breach within the dam.In this model,the grain size distribution,the compaction density and the strength of dam materials are reasonably accounted for.Furthermore,the influences of the direction of seepage paths,the slope of the dam and the velocity of water flow on the amount of erosion are also taken into consideration.The proposed model and the corresponding numerical programs are employed to simulate the development of breaches and discharge of two typical cases due to seepage failure.The development of breaches,the history of discharge and the peak flood flux predicted by the numerical models are rather comparable to the measured data,which confirms the validity of the proposed model and the feasibility of applying the model in evaluating the disaster consequences and preparing the emergency counter measurements in the case of dam collapse.展开更多
This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete ...This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete faced rock-fill dams. This paper has raised the key technical problems which need to study for construction of 300 m-height-scale concrete faced rock-fill dams based on the main experiences on the extra-high concrete faced rock-fill dams built after the year of 2000.展开更多
With the characteristics of seepage flow in earth-rock dams, a seepagemonitoring model was established based on the finite element method for 3-D seepage flow togetherwith observed data and was used to analyze and mon...With the characteristics of seepage flow in earth-rock dams, a seepagemonitoring model was established based on the finite element method for 3-D seepage flow togetherwith observed data and was used to analyze and monitor the seepage of dams. In order to find out andmonitor the seepage status of the whole dam, the separation of seepage a-mount for dam body, damfoundation and side banks was made theoretically by using the model. Practical example shows thatthe accuracy of computed results is satisfactory and the separation results are more objective.展开更多
文摘In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis curve is also considered when the earth is under cyclic load. The research work can make the calculation results of plastic collapse more accurate by including the effect of the post-earthquake degree of plastic deformation on the stability of the earth-rock dam, and the dam safety factor decreases from 2.50 to 1.90 after the magnitude-8 earthquake. Moreover, the research work will also improve the design of the earth-rock dam under abnormal operating conditions.
基金National Natural Science Foundation of China(No.51379192)
文摘During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progresses.Accurate identification of the risk factors,as well as clearing any possible effect that any risk factors might have on the construction project is the key and foundation to our cooperative control of the construction goals.According to the construction planning of earth-rock dam,the hall3 D structure was used to identify the potential changes of risk factors,and the possible means of any risk factors to interfere with the construction goals.The dynamic risk assessment index system is established by deploying the WBS-RBS(work breakdown structurerisk breakdown structure)method,aiming at the construction goals of earth-rock dam.The case study shows that the index system is very effective at risk management of earth-rock dam during construction,and relatively practicable.
文摘Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- dropower projects, the life-cycle risk management system of high earth-rock dam project for Nuozhadu project was developed. The system mainly includes digital dam, three-dimensional design, construction quality monito- ring, safety assessment and warning, etc, to integrally manage and analyze the dam design, constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safe- ty quality monitoring in the project life cycle, and provided the basic platform for the scientific management of the construction and operation safety of high earth-rock dam. Application in Nuozhadu earth-rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality, and provided a new way for the quality safety control of high earth-rock dam.
基金Special Scientific Found for Seismic Industry Under Grant No.201008005
文摘Based on raw data from dams damaged in the Wenchuan earthquake, including many that were severely damaged, characteristics and factors that influenced the damage are discussed in this paper. Findings from this study include: severely damaged dams were densely distributed along the seismologic fault; small dams, especially small earth-rock dams, had the most serious damage that was caused by a variety of factors; the most serious damage was caused by seismic waves; damage was aggregated by aftershocks; and the extent of the damage patterns increased with the seismic intensity. Damage patterns varied in different intensity zones and cracking was the most common type of damage. Most of the dams had a good base with relatively high bearing capacity, and the walls of the earth-rock dams were mostly of clay soil. This type of base and body material mitigated some of the damage to dams. Reservoir maintenance and other factors also have a significant impact on the seismic safety of the dam. Finally, some recommendations to reduce seismic damage to dams are proposed.
基金supported by the National Basic Research Program of China ("973" Program) (Grant No. 2007CB714103)the National Natural Science Foundation of China (Grant No. 90815024)
文摘In this study,a numerical model,which can capture the full process of the development of seepage passages,the collapse of dams and the failure due to overtopping,is proposed for earth-rock dams.The critical incipient velocity for the occurrence of seepage failure is derived by analyzing the forces acting on soil particles in the seepage passage.The sediment transport formula is proposed to simulate the erosion process and the evolution of breach within the dam.In this model,the grain size distribution,the compaction density and the strength of dam materials are reasonably accounted for.Furthermore,the influences of the direction of seepage paths,the slope of the dam and the velocity of water flow on the amount of erosion are also taken into consideration.The proposed model and the corresponding numerical programs are employed to simulate the development of breaches and discharge of two typical cases due to seepage failure.The development of breaches,the history of discharge and the peak flood flux predicted by the numerical models are rather comparable to the measured data,which confirms the validity of the proposed model and the feasibility of applying the model in evaluating the disaster consequences and preparing the emergency counter measurements in the case of dam collapse.
文摘This paper summarizes the main technical points related to 100 m-height-scale concrete faced rock-fill dams and analyzes the main problems and their causes occurring during construction of 200 m-height-scale concrete faced rock-fill dams. This paper has raised the key technical problems which need to study for construction of 300 m-height-scale concrete faced rock-fill dams based on the main experiences on the extra-high concrete faced rock-fill dams built after the year of 2000.
文摘With the characteristics of seepage flow in earth-rock dams, a seepagemonitoring model was established based on the finite element method for 3-D seepage flow togetherwith observed data and was used to analyze and monitor the seepage of dams. In order to find out andmonitor the seepage status of the whole dam, the separation of seepage a-mount for dam body, damfoundation and side banks was made theoretically by using the model. Practical example shows thatthe accuracy of computed results is satisfactory and the separation results are more objective.