With a high penetration of Plug-In Electric Vehicles (PEVs) in the electric grid, utilities will have to face the challenges related to them. Considerable research is being done to study and mitigate the impact of PEV...With a high penetration of Plug-In Electric Vehicles (PEVs) in the electric grid, utilities will have to face the challenges related to them. Considerable research is being done to study and mitigate the impact of PEVs on the electric grid and devise methodologies to utilize them for energy storage and distributed generation. In this paper, the impact of PEVs in a smart car park, placed in an unbalanced distribution system, during a Single Line to Ground fault with auto-recloser operation is studied. Level-2, bidirectional battery chargers with Current Controlled and Voltage Controlled Voltage Source Converters are modeled for the battery charging systems of the PEVs. A smart car park, with 16 vehicles connected to each of the three phases is simulated at one of the buses in the IEEE 13 Bus Test Feeder. The impacts observed during the fault are analyzed and a method to mitigate them is suggested.展开更多
电网换相换流器型高压直流输电(line commutated converter-based high voltage direct current,LCC-HVDC)系统若发生后续换相失败,将严重影响交直流混联电网的安全稳定运行。文中首先针对LCC-HVDC系统故障恢复过程中电流偏差控制作用...电网换相换流器型高压直流输电(line commutated converter-based high voltage direct current,LCC-HVDC)系统若发生后续换相失败,将严重影响交直流混联电网的安全稳定运行。文中首先针对LCC-HVDC系统故障恢复过程中电流偏差控制作用阶段易再次发生换相失败的问题,对电流偏差控制参数与换相失败之间的关系进行理论分析,发现此阶段系统若不发生换相失败,逆变侧LCC直流电压和交流换相电压须满足一定的约束关系,且该约束关系受电流偏差控制参数的直接影响。然后,基于理论分析结果,提出一种电流偏差控制参数整定方法,可改善系统故障恢复过程中对直流电压恢复速度和程度的控制要求,使系统更易满足直流电压与交流换相电压稳定运行约束关系,以降低后续换相失败概率。最后,利用PSCAD/EMTDC仿真平台CIGRE标准测试模型验证了理论分析的正确性以及参数整定方法的有效性。展开更多
文摘With a high penetration of Plug-In Electric Vehicles (PEVs) in the electric grid, utilities will have to face the challenges related to them. Considerable research is being done to study and mitigate the impact of PEVs on the electric grid and devise methodologies to utilize them for energy storage and distributed generation. In this paper, the impact of PEVs in a smart car park, placed in an unbalanced distribution system, during a Single Line to Ground fault with auto-recloser operation is studied. Level-2, bidirectional battery chargers with Current Controlled and Voltage Controlled Voltage Source Converters are modeled for the battery charging systems of the PEVs. A smart car park, with 16 vehicles connected to each of the three phases is simulated at one of the buses in the IEEE 13 Bus Test Feeder. The impacts observed during the fault are analyzed and a method to mitigate them is suggested.
文摘基于模块化多电平换流器(modular multilevel converter,MMC)的柔性直流电网是实现大规模可再生能源发电汇集、输送和并网的有效手段。针对传统直流故障穿越(fault ride-through,FRT)方案会引起全网功率传输中断的问题,提出一种新型的直流FRT协调控制策略,其可快速阻断故障电流并维持非故障线路换流站不退出运行。在分析故障电流组成及关键影响因素的基础上,针对故障线路MMC(fault line MMC,FLMMC),提出了自适应于故障线电流变化的负压控制策略,该策略可以提升电流衰减速度,保证故障可靠隔离。针对非故障线路MMC(non-fault line MMC,NFLMMC),考虑到FLMMC的过电流、过电压风险,提出了NFLMMC主动限流(active current-limiting control,ACLC)协同控制方法,设计了限流性能可自适应于直流母线电压变化的参数选取原则,在抑制故障电流的同时兼顾直流电网的快速恢复。最后,基于RTLAB实时数字仿真平台搭建了四端柔性直流电网仿真模型。仿真结果表明,所提协同控制策略能够快速阻断直流故障电流,缩短直流电网功率恢复时间,提高系统安全稳定性。
文摘电网换相换流器型高压直流输电(line commutated converter-based high voltage direct current,LCC-HVDC)系统若发生后续换相失败,将严重影响交直流混联电网的安全稳定运行。文中首先针对LCC-HVDC系统故障恢复过程中电流偏差控制作用阶段易再次发生换相失败的问题,对电流偏差控制参数与换相失败之间的关系进行理论分析,发现此阶段系统若不发生换相失败,逆变侧LCC直流电压和交流换相电压须满足一定的约束关系,且该约束关系受电流偏差控制参数的直接影响。然后,基于理论分析结果,提出一种电流偏差控制参数整定方法,可改善系统故障恢复过程中对直流电压恢复速度和程度的控制要求,使系统更易满足直流电压与交流换相电压稳定运行约束关系,以降低后续换相失败概率。最后,利用PSCAD/EMTDC仿真平台CIGRE标准测试模型验证了理论分析的正确性以及参数整定方法的有效性。