期刊文献+
共找到115篇文章
< 1 2 6 >
每页显示 20 50 100
Optimizing and slope determination of final wall for Maiduk Mine with consideration of destabilizer factors
1
作者 Shamsoddin Saeed Masoud Maarefvand Parviz Yaaghubi Ebrahim 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第3期501-509,共9页
In this research, determination of final slope for Maiduk copper mine of Kerman is investigated according to destabilizing factors of the mine. The development of the Maiduk Mine caused the extension of the mine area ... In this research, determination of final slope for Maiduk copper mine of Kerman is investigated according to destabilizing factors of the mine. The development of the Maiduk Mine caused the extension of the mine area and also withdrawal of its wall. So, optimizing possibility of mine slope is essential. Finally,the magnitude of optimized slopes for different walls of the mine in association with executive commands with better factors of safety is provided. The results show that the most important destabilizer factors are the presence of water and pore pressure in the faults and the main joints. With the omission of pore pressure, mine wall for the designed depth is quite stable. This requires a drainage pattern in the lifetime of the mine. In an optimistic point of view, the minimum factor of safety of the wall will be 2.81 even without drainage. This conclusion allows optimizing the slope to its maximum magnitude of 51 degree. With the pessimistic engineering judgment and with the higher SF, the magnitude of the slope is optimized to 47 degree. 展开更多
关键词 稳定因素 最终边坡 优化 孔隙水压力 矿山开发 矿山边坡 孔隙压力 设计深度
下载PDF
多煤层开采终采线外错对冲击地压影响机理研究
2
作者 乔文俊 秦子晗 +1 位作者 王鹏 白俊杰 《煤炭技术》 CAS 2024年第1期61-65,共5页
为研究冲击地压多煤层同时开采终采线外错对冲击地压的影响,以台格庙矿区地质条件为工程背景,采用FLAC3D对下部2-2煤层终采线与上部2-2上煤层终采线的6种不同错距进行数值模拟分析,基于模拟结果和理论分析研究了终采线不同错距煤层应力... 为研究冲击地压多煤层同时开采终采线外错对冲击地压的影响,以台格庙矿区地质条件为工程背景,采用FLAC3D对下部2-2煤层终采线与上部2-2上煤层终采线的6种不同错距进行数值模拟分析,基于模拟结果和理论分析研究了终采线不同错距煤层应力分布特征以及下部煤层终采线外错对上覆顶板铰接结构的影响。研究表明:当下部煤层终采线外错时,工作面超前应力集中程度增加,同时下部煤层开采可能破坏上部顶板铰接结构,造成变形失稳,动静载荷叠加作用使得下部煤层终采线外错后冲击风险大幅增加,由此提出了优化终采线位置、预裂上部煤层顶板和实施下部煤层卸压3种防治途径。 展开更多
关键词 冲击地压 多煤层开采 终采线 数值模拟 铰接结构
下载PDF
工作面末采期间煤层大巷群围岩控制技术研究
3
作者 李常浩 《煤》 2024年第4期20-23,28,共5页
N2105工作面末采期间所形成的超前支承应力和采空区上方覆岩运移所形成的动载扰动均会对停采线前方的煤层大巷群造成影响,基于此工程采用UDEC^(3D)离散元软件模拟分析揭示了对顶板内厚硬关键层进行充分致裂后,煤柱体内所承载的垂直应力... N2105工作面末采期间所形成的超前支承应力和采空区上方覆岩运移所形成的动载扰动均会对停采线前方的煤层大巷群造成影响,基于此工程采用UDEC^(3D)离散元软件模拟分析揭示了对顶板内厚硬关键层进行充分致裂后,煤柱体内所承载的垂直应力在“双峰值”位置处降幅分别为21.1%和16.0%.同时采用COMSOL Multiphysics数值仿真软件模拟确定了1号回风大巷围岩注浆加固的最佳的水灰质量比和压力值分别为1.5∶1和1.0 MPa.在1号回风大巷内实施工业性应用后的60 d内,围岩顶底板和两帮收敛率分别为3.3%和1.4%,煤层大巷围岩控制效果良好。 展开更多
关键词 末采 煤层大巷 数值模拟 定向致裂 注浆 矿压监测
下载PDF
综采工作面快速回撤工艺安全性的优化应用
4
作者 李超 《自动化应用》 2024年第8期150-151,154,共3页
为解决煤矿综采工作面因回撤通道的布置不合理、对应支护工艺的设计不合理导致综采工作面的回采效率降低且在工作面回撤期间出现顶板下沉、冒顶等事故的问题,以1108综采工作面为例,在对其顶底板条件和相对位置分析的基础上,研究回撤工... 为解决煤矿综采工作面因回撤通道的布置不合理、对应支护工艺的设计不合理导致综采工作面的回采效率降低且在工作面回撤期间出现顶板下沉、冒顶等事故的问题,以1108综采工作面为例,在对其顶底板条件和相对位置分析的基础上,研究回撤工艺中末采挂网工艺、支护工艺以及液压支架回撤工艺。该研究成果可指导1108回撤工艺的具体实施。 展开更多
关键词 末采挂网 液压支架 锚杆锚索 支护 回撤工艺
下载PDF
大采高回撤通道“高+低位”断顶爆破实践
5
作者 白俊杰 《陕西煤炭》 2024年第2期53-59,共7页
大采高冲击地压工作面末采期间面临的冲击地压风险极高,为了解决此类工作面的冲击地压防治难题,针对纳林河二号矿大采高工作面末采阶段顶板的处置问题,从覆岩冲击层位应力阻断和正面保护回撤通道的角度出发进行爆破方案的设计、对比及优... 大采高冲击地压工作面末采期间面临的冲击地压风险极高,为了解决此类工作面的冲击地压防治难题,针对纳林河二号矿大采高工作面末采阶段顶板的处置问题,从覆岩冲击层位应力阻断和正面保护回撤通道的角度出发进行爆破方案的设计、对比及优化,初步证实“高+低位”具有2个方面明显的技术优势。一是爆破对覆岩的致裂破碎方面,串联一次起爆增强了爆破致裂的效果和对爆破区域块体的破碎作用,与此同时该区域的应力变化梯度Δσ显著降低,更好的起到阻断高应力传递的作用;二是爆破覆盖的尺度方面,实现全层位的应力阻断,避免了卸压盲区。在此基础上,末采阶段工作面压力峰值分布范围、集中程度明显减小,同时末采阶段液压支架阻力正态分布中均值、标准差均减小,且10%~37%应力计不同程度出现卸荷状态,证实“高+低位”爆破对末采阶段、回撤通道及孤立煤体形成了正面保护作用。 展开更多
关键词 冲击地压 末采防冲 断顶爆破 应力变化 微震监测
下载PDF
华亭煤矿综放工作面末采阶段柔性网支护效果分析
6
作者 陈娜 林飞 王震 《陕西煤炭》 2024年第3期83-87,共5页
为确保华亭煤矿综放工作面安全高效回撤,250107-1综放工作面末采阶段采用高强聚酯纤维柔性网代替金属网铺顶。主要介绍柔性网使用前运网、挂网相关准备工作以及柔性网施工工艺,并根据250107-1综放工作面柔性网工程实践,分析柔性网在工... 为确保华亭煤矿综放工作面安全高效回撤,250107-1综放工作面末采阶段采用高强聚酯纤维柔性网代替金属网铺顶。主要介绍柔性网使用前运网、挂网相关准备工作以及柔性网施工工艺,并根据250107-1综放工作面柔性网工程实践,分析柔性网在工作面末采阶段的突出优势与存在的问题,并针对柔性网应用过程中存在的问题,提出优化柔性网尺寸、配合金属网挂网技术、加强放煤与割煤工艺管理的保障技术措施。 展开更多
关键词 综放工作面 柔性网 末采阶段 运网 挂网
下载PDF
Settlement behavior of coal mine waste in different surrounding rock conditions 被引量:1
7
作者 马春德 李夕兵 +3 位作者 胡炳南 陈枫 徐纪成 李地元 《Journal of Central South University of Technology》 EI 2008年第3期350-355,共6页
In order to investigate the influence of complex conditions of in-situ surrounding rocks on the settlement behavior of nubbly coal mine waste subjected to high gravity pressure,four kinds of loading chambers made of d... In order to investigate the influence of complex conditions of in-situ surrounding rocks on the settlement behavior of nubbly coal mine waste subjected to high gravity pressure,four kinds of loading chambers made of different similar materials with different elastic moduli in experiments were used to simulate the deformation features of in-site rocks,including soft,moderate hardness,hard and extra-hard rocks. The results show that all the settlement-axial load (or axial strain-stress) curves obtained under four different surrounding rock conditions present power-exponential function feature. The final settlement of coal mine waste under the same axial load is closely related to the lumpiness gradations and the deformation behavior of chamber materials used to simulate behaviors of different in-situ surrounding rocks. In the same surrounding rock condition,the final settlement under the same maximum axial load decreases with the decrease of the proportion of larger gradation of coal mine waste. While for the same lumpiness gradation case,the settlement increases with the decrease of elastic modulus of simulated surrounding rocks and the lateral pressure induced by axial load increases with the increase of elastic modulus of loading chambers that are used to simulate different surrounding rocks. The test results also reveal that both the compaction curve and lateral pressure curve show a three-stage behavior,and the duration of each stage,which is closely related to gradations and the deformation feature of loading chamber materials,decreases with the increase of the proportion of the small size of coal mine waste and elastic modulus of the simulated rock materials. 展开更多
关键词 煤矿废物 沉降特性 周围岩石环境 侧压
下载PDF
利用Dimine数字化软件优化露天矿山最终境界探讨 被引量:1
8
作者 周健 《世界有色金属》 2018年第23期230-231,共2页
根据某露天石墨矿的地质勘探报告数据,通过对矿体特征、矿石质量及开采技术条件分析,利用Dimine数字化软件系统建立矿体模型,然后输入开采成本、剥离成本、开采率及帮坡角等经济和工程参数,采用LG图论法优化得出露天坑最优开采境界。研... 根据某露天石墨矿的地质勘探报告数据,通过对矿体特征、矿石质量及开采技术条件分析,利用Dimine数字化软件系统建立矿体模型,然后输入开采成本、剥离成本、开采率及帮坡角等经济和工程参数,采用LG图论法优化得出露天坑最优开采境界。研究成果进一步拓展了露天矿最终境界圈定方法,对复杂地质条件、矿石质量变化大的露天矿最终开采境界圈定具有较好的借鉴意义。 展开更多
关键词 Dimine数字化 露天矿 最终境界 优化
下载PDF
12103综采工作面回撤通道围岩控制研究 被引量:2
9
作者 冯彦军 《能源与环保》 2023年第5期305-309,共5页
针对综采工作面末采阶段回撤通道矿压显现剧烈的问题,采用了数值模拟和现场观测的方法,研究了德泉煤矿12103综采工作面回撤通道围岩应力演化规律特征,数值模拟结果表明:当工作面距离回撤通道20 m时,回撤通道两帮应力呈现非对称应力现象... 针对综采工作面末采阶段回撤通道矿压显现剧烈的问题,采用了数值模拟和现场观测的方法,研究了德泉煤矿12103综采工作面回撤通道围岩应力演化规律特征,数值模拟结果表明:当工作面距离回撤通道20 m时,回撤通道两帮应力呈现非对称应力现象,随着工作面和回撤通道距离越来越近,应力峰值不断增加。现场观测结果表明,12103回撤通道顶底变形量为279 mm,两帮变形量最为158 mm,保障了工作面回撤期间的安全,现场应用良好。 展开更多
关键词 综采工作面 围岩稳定 回撤通道 末采期间
下载PDF
基于能量计算的预掘回撤通道顶板下沉量分析 被引量:2
10
作者 王博楠 谷拴成 李军 《矿业科学学报》 CSCD 2023年第5期623-632,共10页
采用预掘回撤通道技术的综采工作面在末采阶段易发生顶板大变形而引发压架事故。本文基于工作面贯通后的3种基本顶破坏形式,建立了不同的回撤通道顶板力学模型,通过分析顶板变形过程中的能量释放与做功过程,求得不同基本顶破坏形式下的... 采用预掘回撤通道技术的综采工作面在末采阶段易发生顶板大变形而引发压架事故。本文基于工作面贯通后的3种基本顶破坏形式,建立了不同的回撤通道顶板力学模型,通过分析顶板变形过程中的能量释放与做功过程,求得不同基本顶破坏形式下的回撤通道直接顶下沉量。结合张家峁煤矿N14201工作面回撤通道顶板大变形案例,分析了不同顶板力学模型的影响因素,发现基本顶破断位置、关键块及其上覆岩层厚度、关键块回转角和支护强度对回撤通道顶板下沉量影响显著,确定了张家峁煤矿N14201工作面发生压架事故的原因,即基本顶在保护煤柱上方4~6 m范围内破断以及上部3^(-1)煤层开采导致主关键层破断失稳。 展开更多
关键词 综采工作面 末采阶段 预掘回撤通道 顶板下沉量 压架事故
下载PDF
定向水平钻孔水力压裂卸压护巷技术研究及应用
11
作者 张俊虎 刘爱卿 张强 《煤炭工程》 北大核心 2023年第12期11-14,共4页
针对工作面回采过程中及收尾后大巷难以保持稳定的问题,为了改变传统卸压方式在卸压范围、卸压时间、卸压效果等方面存在的不足,提出利用定向水平钻孔水力压裂技术进行卸压,采用理论分析和数值计算相结合的方式分析了大巷高应力产生原因... 针对工作面回采过程中及收尾后大巷难以保持稳定的问题,为了改变传统卸压方式在卸压范围、卸压时间、卸压效果等方面存在的不足,提出利用定向水平钻孔水力压裂技术进行卸压,采用理论分析和数值计算相结合的方式分析了大巷高应力产生原因,揭示了定向水平钻孔水力压裂对于工作面高支承压力转移作用机理,结果表明:工作面末采期顶板的断裂、旋转、运移、垮落等剧烈活动是造成采区大巷围岩应力集聚的主要原因;在工作面终采线实施定向水平钻孔水力压裂能够消除工作面停采后顶板破断而产生的动压能量,同时能够使得垮落带岩层及时破断冒落充填采空区,改变悬臂结构,进而降低护巷煤柱应力,现场应用取得了良好的效果。 展开更多
关键词 定向水平钻孔 水力压裂 应力转移 工作面末采
下载PDF
矿山最终边坡稳定性预测分析与安全措施研究 被引量:1
12
作者 席政 席德美 +1 位作者 席燕 湛娇 《水泥工程》 CAS 2023年第2期74-76,79,共4页
为了确保露天矿山在开采结束时最终边坡能保持稳定,预防和减少边坡垮塌等生产安全事故,本文以贵州某水泥有限公司水泥用石灰岩矿山为研究对象,在现状分析的基础上,采用赤平投影方法对矿山最终边坡进行定性评价和预测分析,结果表明:北区... 为了确保露天矿山在开采结束时最终边坡能保持稳定,预防和减少边坡垮塌等生产安全事故,本文以贵州某水泥有限公司水泥用石灰岩矿山为研究对象,在现状分析的基础上,采用赤平投影方法对矿山最终边坡进行定性评价和预测分析,结果表明:北区、南区、东区、西区最终台阶边坡趋于稳定。 展开更多
关键词 最终边坡 石灰岩矿 赤平投影 定性评价 安全平台
下载PDF
综放工作面顶板精准预裂与村庄保护煤柱留设尺寸研究 被引量:1
13
作者 董飞 《煤炭与化工》 CAS 2023年第4期22-24,共3页
为探究常村煤矿村庄保护煤柱合理留设尺寸与切顶卸压对地表起到的保护作用,利用UDEC数值模拟软件验证不同煤柱留设方案的可行性,通过采动对地表造成的超前影响范围来看,认为将村庄保护煤柱从200 m减小至180 m,并配合切顶卸压措施实现顶... 为探究常村煤矿村庄保护煤柱合理留设尺寸与切顶卸压对地表起到的保护作用,利用UDEC数值模拟软件验证不同煤柱留设方案的可行性,通过采动对地表造成的超前影响范围来看,认为将村庄保护煤柱从200 m减小至180 m,并配合切顶卸压措施实现顶板精准致裂后,可将地表沉降量控制在合理范围之内。该研究可为其他类似矿井提供借鉴。 展开更多
关键词 村庄保护煤柱 切顶卸压 超前影响范围 末采
下载PDF
马蹄沟煤矿末采阶段回撤通道二次加固技术研究
14
作者 朱自新 赵东方 王余伟 《矿业安全与环保》 CAS 北大核心 2023年第5期124-129,136,共7页
马蹄沟煤矿3506末采工作面回撤通道受邻近工作面3505回采扰动影响,陆续发生顶板下沉、帮部内鼓、底板隆起及巷道断面缩小等严重变形,严重影响3505工作面生产设备回撤工作的安全高效开展。为有效控制围岩变形,基于锚杆与围岩的相互作用... 马蹄沟煤矿3506末采工作面回撤通道受邻近工作面3505回采扰动影响,陆续发生顶板下沉、帮部内鼓、底板隆起及巷道断面缩小等严重变形,严重影响3505工作面生产设备回撤工作的安全高效开展。为有效控制围岩变形,基于锚杆与围岩的相互作用力学模型,对回撤通道锚固围岩变形范围进行反演分析,在此基础上提出了具有针对性的二次锚注联合加固方案并实施,在二次加固后对围岩稳定性进行现场监测。结果表明:回撤通道经过二次锚注联合加固后,顶板下沉、两帮移近、底板隆起等变形得到了有效控制。 展开更多
关键词 围岩变形 末采阶段 回撤通道 二次加固 效果分析
下载PDF
2-105综采工作面末采贯通研究
15
作者 王鹏 《能源与节能》 2023年第12期106-108,共3页
为了顺利解决杜家沟煤业2-105综采工作面末采贯通的问题,基于地测数据,确定了工作面在运输顺槽和辅运顺槽的提刀量。根据贯通方案进行施工,末采矿压观测结果显示,主回撤巷道应力及变形均在合理范围内,且支架的压缩量较小,贯通方案成功... 为了顺利解决杜家沟煤业2-105综采工作面末采贯通的问题,基于地测数据,确定了工作面在运输顺槽和辅运顺槽的提刀量。根据贯通方案进行施工,末采矿压观测结果显示,主回撤巷道应力及变形均在合理范围内,且支架的压缩量较小,贯通方案成功实施。 展开更多
关键词 综采工作面 末采贯通 地测 矿压
下载PDF
综采工作面贯通机械化清煤与联网工艺研究
16
作者 王伟 冯志忠 +1 位作者 徐朝 弓仲标 《中国煤炭》 2023年第S02期292-296,共5页
为了解决国能神东煤炭集团有限责任公司大柳塔煤矿综采工作面在末采期间存在的回撤通道围岩变形严重难控制、矿压显现异常等问题,以22206综采工作面末采贯通为例,采用现场观测、数值模拟相结合的方法,研究了双回撤通道综采工作面末采段... 为了解决国能神东煤炭集团有限责任公司大柳塔煤矿综采工作面在末采期间存在的回撤通道围岩变形严重难控制、矿压显现异常等问题,以22206综采工作面末采贯通为例,采用现场观测、数值模拟相结合的方法,研究了双回撤通道综采工作面末采段围岩应力分布规律。提出了机械化清煤与联网的新工艺,以代替传统人员清煤的“人海战术”。该工艺大幅减少了清煤联网人员,降低人员劳动强度,缩短作业时间,效率得到大幅提升,为综采工作面末采贯通期间的安全高效开采提供了保障。 展开更多
关键词 回撤通道 应力分布 末采贯通 机械化清煤
下载PDF
综采工作面末采期间切顶卸压技术应用研究
17
作者 梁鑫 《山西冶金》 CAS 2023年第10期228-229,232,共3页
13302综采工作面末采期间受煤层顶板坚硬、不容易垮落等因素影响,超前支承压力影响范围广、应力集中现象明显,从而容易导致采区轨道上山变形量大。结合13302综采工作面现场情况,提出在末采期间采用切顶卸压技术切断顶板应力传递路径,在... 13302综采工作面末采期间受煤层顶板坚硬、不容易垮落等因素影响,超前支承压力影响范围广、应力集中现象明显,从而容易导致采区轨道上山变形量大。结合13302综采工作面现场情况,提出在末采期间采用切顶卸压技术切断顶板应力传递路径,在保证末采安全前提下降低采动对轨道上山影响,并具体给出切顶卸压技术方案。现场应用后,13302综采工作面在末采期间轨道上山围岩变形受采面回采影响较小,采面末采期间轨道上山顶底板、巷帮最大变形量分别为10.1 mm、7.9 mm,围岩变形在允许范围内。研究成果可为动压巷道围岩控制、缩小保护煤柱宽度等工作开展提供经验借鉴。 展开更多
关键词 煤炭开采 末采 坚硬顶板 切顶卸压 采动压力
下载PDF
深孔注浆在大采高工作面末采中的应用
18
作者 李文浩 《山西化工》 CAS 2023年第5期143-144,151,共3页
5303大采高工作面在末采期间面临煤壁片帮问题并有冒顶征兆,为实现采面末采期间安全高效回采,提出通过深孔注浆技术提高末采段煤岩体强度及稳定性。在53031巷及53032巷内分别布置注浆钻孔,对注浆钻孔布置方案、注浆材料、设备选取等进... 5303大采高工作面在末采期间面临煤壁片帮问题并有冒顶征兆,为实现采面末采期间安全高效回采,提出通过深孔注浆技术提高末采段煤岩体强度及稳定性。在53031巷及53032巷内分别布置注浆钻孔,对注浆钻孔布置方案、注浆材料、设备选取等进行分析,现场应用表明,末采阶段注浆后煤岩体承载能力得以显著提升,采面在末采期间保持快速推进,末采50 m耗时10 d即回采结束,末采期间片帮发生降至2~6次/班、最大片帮深度为450 mm,且末采期间未有片帮征兆。通过深孔注浆为5303大采高工作面末采安全高效回采创造良好条件。 展开更多
关键词 深孔注浆 大采高工作面 末采 采动压力
下载PDF
综采工作面末采安全回撤工艺优化与应用
19
作者 李志刚 《能源与节能》 2023年第10期98-100,共3页
针对综采工作面末采期间施工组织复杂、工艺繁复、围岩控制困难等诸多问题,以成庄矿4315工作面末采施工为工程背景,在现场调研基础上,结合工程实践经验,提出工作面停采线优化、末采区域预注浆加固措施,后期通过柔性网的替代、优化上网... 针对综采工作面末采期间施工组织复杂、工艺繁复、围岩控制困难等诸多问题,以成庄矿4315工作面末采施工为工程背景,在现场调研基础上,结合工程实践经验,提出工作面停采线优化、末采区域预注浆加固措施,后期通过柔性网的替代、优化上网与连绳工艺、撤架通道支护参数优化等多项技术措施,有力保障4315工作面末采期间的安全。 展开更多
关键词 综采工作面 末采 安全回撤工艺
下载PDF
矿用高强聚酯纤维柔性网在3201工作面末采中的应用
20
作者 牛嘉 《能源与节能》 2023年第1期219-221,共3页
针对3201工作面末采施工撤架通道时使用矿用高强聚酯纤维柔性网的技术特点,与之前回采工作面末采施工撤架通道时使用的金属网进行了对比,得出柔性网具有诸多优点,能够提高工作面末采回撤效率和安全性。
关键词 聚酯纤维柔性网 末采 割煤 移架
下载PDF
上一页 1 2 6 下一页 到第
使用帮助 返回顶部