With the increasing demand worldwide for power grid interconnection,a growing number of related projects are under planning or construction.Despite the rapid growth of cross-border interconnection projects,the systema...With the increasing demand worldwide for power grid interconnection,a growing number of related projects are under planning or construction.Despite the rapid growth of cross-border interconnection projects,the systematic research on profit models for these projects is insufficient.This paper first analyzes the profit sources of interconnection projects.Based on the analysis results,profit models are considered under different regulatory systems for three types of crossborder interconnection projects:fully market-oriented,semi-marketization,and fully supervised.Finally,measures for increasing the profitability and sustainable development of power interconnection projects are proposed.展开更多
基金supported by the State Grid Corporation of China’s Science & Technology Project “Risk Identification and Countermeasures of SGCC in the Transition Period of Power Sector Reform.”
文摘With the increasing demand worldwide for power grid interconnection,a growing number of related projects are under planning or construction.Despite the rapid growth of cross-border interconnection projects,the systematic research on profit models for these projects is insufficient.This paper first analyzes the profit sources of interconnection projects.Based on the analysis results,profit models are considered under different regulatory systems for three types of crossborder interconnection projects:fully market-oriented,semi-marketization,and fully supervised.Finally,measures for increasing the profitability and sustainable development of power interconnection projects are proposed.