期刊文献+
共找到4,729篇文章
< 1 2 237 >
每页显示 20 50 100
A digital twin model-based approach to cost optimization of residential community microgrids
1
作者 Mariem Dellaly Sondes Skander-Mustapha Ilhem Slama-Belkhodja 《Global Energy Interconnection》 EI CSCD 2024年第1期82-93,共12页
This paper presents a peer-to-peer community cost optimization approach based on a single-prosumer energy management system.Its objective is to optimize energy costs for prosumers in the community by enhancing the con... This paper presents a peer-to-peer community cost optimization approach based on a single-prosumer energy management system.Its objective is to optimize energy costs for prosumers in the community by enhancing the consumption efficiency.This study was conducted along two main axes.The first axis focuses on designing a digital twin for a residential community microgrid platform.This phase involves data collection,cleaning,exploration,and interpretation.Moreover,it includes replicating the functionality of the real platform and validating the results.The second axis involves the development of a novel approach that incorporates two distinct prosumer behaviors within the same community microgrid,while maintaining the concept of peer-to-peer energy trading.Prosumers without storage utilize their individual PV systems to fulfill their energy requirements and inject excess energy into a local microgrid.Meanwhile,a single prosumer with a storage system actively engages in energy exchange to maximize the community’s profit.This is achieved by optimizing battery usage using a cost optimization solution.The proposed solution is validated using the developed digital twin. 展开更多
关键词 Energy management system(EMS) cost optimization Digital twin Photovoltaic systems MICROGRID
下载PDF
Reliability-based life-cycle cost seismic design optimization of coastal bridge piers with nonuniform corrosion using different materials
2
作者 Wu Xiangtong Yuan Wenting Guo Anxin 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2024年第1期209-225,共17页
Reinforcement corrosion is the main cause of performance deterioration of reinforced concrete(RC)structures.Limited research has been performed to investigate the life-cycle cost(LCC)of coastal bridge piers with nonun... Reinforcement corrosion is the main cause of performance deterioration of reinforced concrete(RC)structures.Limited research has been performed to investigate the life-cycle cost(LCC)of coastal bridge piers with nonuniform corrosion using different materials.In this study,a reliability-based design optimization(RBDO)procedure is improved for the design of coastal bridge piers using six groups of commonly used materials,i.e.,normal performance concrete(NPC)with black steel(BS)rebar,high strength steel(HSS)rebar,epoxy coated(EC)rebar,and stainless steel(SS)rebar(named NPC-BS,NPC-HSS,NPC-EC,and NPC-SS,respectively),NPC with BS with silane soakage on the pier surface(named NPC-Silane),and high-performance concrete(HPC)with BS rebar(named HPC-BS).First,the RBDO procedure is improved for the design optimization of coastal bridge piers,and a bridge is selected to illustrate the procedure.Then,reliability analysis of the pier designed with each group of materials is carried out to obtain the time-dependent reliability in terms of the ultimate and serviceability performances.Next,the repair time of the pier is predicted based on the time-dependent reliability indices.Finally,the time-dependent LCCs for the pier are obtained for the selection of the optimal design. 展开更多
关键词 reliability-based design optimization(RBDO) life-cycle cost(LCC) nonuniform corrosion coastal bridge pier REPAIR
下载PDF
Optimized scheduling of integrated energy systems for low carbon economy considering carbon transaction costs
3
作者 Chao Liu Weiru Wang +2 位作者 Jing Li Xinyuan Liu Yongning Chi 《Global Energy Interconnection》 EI CSCD 2024年第4期377-390,共14页
With the introduction of the“dual carbon”goal and the continuous promotion of low-carbon development,the integrated energy system(IES)has gradually become an effective way to save energy and reduce emissions.This st... With the introduction of the“dual carbon”goal and the continuous promotion of low-carbon development,the integrated energy system(IES)has gradually become an effective way to save energy and reduce emissions.This study proposes a low-carbon economic optimization scheduling model for an IES that considers carbon trading costs.With the goal of minimizing the total operating cost of the IES and considering the transferable and curtailable characteristics of the electric and thermal flexible loads,an optimal scheduling model of the IES that considers the cost of carbon trading and flexible loads on the user side was established.The role of flexible loads in improving the economy of an energy system was investigated using examples,and the rationality and effectiveness of the study were verified through a comparative analysis of different scenarios.The results showed that the total cost of the system in different scenarios was reduced by 18.04%,9.1%,3.35%,and 7.03%,respectively,whereas the total carbon emissions of the system were reduced by 65.28%,20.63%,3.85%,and 18.03%,respectively,when the carbon trading cost and demand-side flexible electric and thermal load responses were considered simultaneously.Flexible electrical and thermal loads did not have the same impact on the system performance.In the analyzed case,the total cost and carbon emissions of the system when only the flexible electrical load response was considered were lower than those when only the flexible thermal load response was taken into account.Photovoltaics have an excess of carbon trading credits and can profit from selling them,whereas other devices have an excess of carbon trading and need to buy carbon credits. 展开更多
关键词 Demand response Combined cooling Heating and power system Carbon transaction costs Flexible electric and thermal loads optimal scheduling
下载PDF
Structural optimization of a reusable seismic frame active link
4
作者 Károly Jármai Maryam Hasanali Kaveh Andisheh 《China Welding》 CAS 2024年第3期1-7,共7页
Circular design encompasses the use of inventive construction methodologies that possess the capability to be readily dismantled,repurposed,or recycled upon reaching the conclusion of their functional lifespan.This wo... Circular design encompasses the use of inventive construction methodologies that possess the capability to be readily dismantled,repurposed,or recycled upon reaching the conclusion of their functional lifespan.This work specifically examines the creation of a reusable design case-study idea for seismic frame design,which is commonly employed in steel-frame constructions in New Zealand.A reusable optimized design for the full seismic frame was proposed in the research.Optimizing the dimensions of welded structures,whether in terms of weight or cost,leads to a decrease in the weight of the steel utilized.The decrease in weight is directly associated with a decrease in environ-mental impact,as the environmental impact is directly proportional to the mass of the construction.The environmental consequences associated with welding technique are contingent upon the dimensions of the weld,hence exerting an indirect influence on the overall mass of the structure.Given the presence of mass dependence in all three areas,albeit in distinct manners,this work employed a multi-objective function optimization strategy to simultaneously address these areas while also partially evaluating them separately.On this way substantial reductions can be achieved both at structural mass and environmental effects. 展开更多
关键词 welded frame design structural optimization environmental effects cost calculations
下载PDF
Economic Power Dispatching from Distributed Generations: Review of Optimization Techniques
5
作者 Paramjeet Kaur Krishna Teerth Chaturvedi Mohan Lal Kolhe 《Energy Engineering》 EI 2024年第3期557-579,共23页
In the increasingly decentralized energy environment,economical power dispatching from distributed generations(DGs)is crucial to minimizing operating costs,optimizing resource utilization,and guaranteeing a consistent... In the increasingly decentralized energy environment,economical power dispatching from distributed generations(DGs)is crucial to minimizing operating costs,optimizing resource utilization,and guaranteeing a consistent and sustainable supply of electricity.A comprehensive review of optimization techniques for economic power dispatching from distributed generations is imperative to identify the most effective strategies for minimizing operational costs while maintaining grid stability and sustainability.The choice of optimization technique for economic power dispatching from DGs depends on a number of factors,such as the size and complexity of the power system,the availability of computational resources,and the specific requirements of the application.Optimization techniques for economic power dispatching from distributed generations(DGs)can be classified into two main categories:(i)Classical optimization techniques,(ii)Heuristic optimization techniques.In classical optimization techniques,the linear programming(LP)model is one of the most popular optimization methods.Utilizing the LP model,power demand and network constraints are met while minimizing the overall cost of generating electricity from DGs.This approach is efficient in determining the best DGs dispatch and is capable of handling challenging optimization issues in the large-scale system including renewables.The quadratic programming(QP)model,a classical optimization technique,is a further popular optimization method,to consider non-linearity.The QP model can take into account the quadratic cost of energy production,with consideration constraints like network capacity,voltage,and frequency.The metaheuristic optimization techniques are also used for economic power dispatching from DGs,which include genetic algorithms(GA),particle swarm optimization(PSO),and ant colony optimization(ACO).Also,Some researchers are developing hybrid optimization techniques that combine elements of classical and heuristic optimization techniques with the incorporation of droop control,predictive control,and fuzzy-based methods.These methods can deal with large-scale systems with many objectives and non-linear,non-convex optimization issues.The most popular approaches are the LP and QP models,while more difficult problems are handled using metaheuristic optimization techniques.In summary,in order to increase efficiency,reduce costs,and ensure a consistent supply of electricity,optimization techniques are essential tools used in economic power dispatching from DGs. 展开更多
关键词 Economic power dispatching distributed generations decentralized energy cost minimization optimization techniques
下载PDF
Design Optimization of a Lattice Tower: Structure and Foundations
6
作者 Cossi Télesphore Nounangnonhou Guy Clarence Semassou +1 位作者 Kossoun Alain Tossa Noémie Sintondji 《Open Journal of Applied Sciences》 2024年第2期483-493,共11页
Produced in power plants, electrical energy is transported to places of consumption via the electricity network. At the heart of this network are the supports that allow electricity to be efficiently transported over ... Produced in power plants, electrical energy is transported to places of consumption via the electricity network. At the heart of this network are the supports that allow electricity to be efficiently transported over long distances, guaranteeing the security and supply of energy to the various centers of use. In the construction of a line, supports occupy an important part in terms of safety and construction cost. It is therefore essential to optimize their use to reduce the cost of transmission lines. This work addresses this problem, which focuses on the optimal utilization of X-lattice towers in the construction of overhead power lines. The challenge is to reconcile the search for optimal cost and respect for the design, resistance and service constraints of the structure. To do this, a parameter having a strong correlation with the weight, foundation and construction cost of the X-lattice tower for 161 kV lines is determined as an important cost variable. This parameter is the wheelbase of the towers. The junction point between the structure and the foundations is obtained by measuring the forces at the base of the tower following the lowering of the loads. These efforts make it possible to size foundations which are of the inverted or isolated sole type. The results obtained reveal that from 8 meters in width, the wheelbase gradually changes until the optimum is obtained at 6.29 meters. With this wheelbase, the production cost is optimal. It clearly emerges from this study that the construction of lattice pylons with a wheelbase of approximately 6.29 meters makes it possible to optimize the cost of construction of 161 kV lines in the Republic of Benin. 展开更多
关键词 Lattice Tower WHEELBASE cost optimization FOUNDATION
下载PDF
Ultimate pit optimization with ecological cost for open pit metal mines 被引量:3
7
作者 胥孝川 顾晓薇 +2 位作者 王青 刘剑平 王俊 《Transactions of Nonferrous Metals Society of China》 SCIE EI CAS CSCD 2014年第5期1531-1537,共7页
The ecological costs of open pit metal mining are quantified, which include lost value of direct eco-services, lost value of indirect eco-services, prevention and restoration costs, and cost of carbon emission from en... The ecological costs of open pit metal mining are quantified, which include lost value of direct eco-services, lost value of indirect eco-services, prevention and restoration costs, and cost of carbon emission from energy consumption. These ecological costs are incorporated in an iterative ultimate pit optimization algorithm. A case study is presented to demonstrate the influence of ecological costs on pit design outcome. The results show that it is possible to internalize ecological costs in mine designs. The pit optimization outcome shifts considerably to the conservative side and the profitability decreases substantially when ecological costs are accounted for. 展开更多
关键词 ultimate pit optimization ecological cost open pit metal mine
下载PDF
Layered power scheduling optimization of PV hydrogen production system considering performance attenuation of PEMEL 被引量:1
8
作者 Yanhui Xu Haowei Chen 《Global Energy Interconnection》 EI CSCD 2023年第6期714-725,共12页
To analyze the additional cost caused by the performance attenuation of a proton exchange membrane electrolyzer(PEMEL)under the fluctuating input of renewable energy,this study proposes an optimization method for powe... To analyze the additional cost caused by the performance attenuation of a proton exchange membrane electrolyzer(PEMEL)under the fluctuating input of renewable energy,this study proposes an optimization method for power scheduling in hydrogen production systems under the scenario of photovoltaic(PV)electrolysis of water.First,voltage and performance attenuation models of the PEMEL are proposed,and the degradation cost of the electrolyzer under a fluctuating input is considered.Then,the calculation of the investment and operating costs of the hydrogen production system for a typical day is based on the life cycle cost.Finally,a layered power scheduling optimization method is proposed to reasonably distribute the power of the electrolyzer and energy storage system in a hydrogen production system.In the up-layer optimization,the PV power absorbed by the hydrogen production system was optimized using MALTAB+Gurobi.In low-layer optimization,the power allocation between the PEMEL and battery energy storage system(BESS)is optimized using a non-dominated sorting genetic algorithm(NSGA-Ⅱ)combined with the firefly algorithm(FA).A better optimization result,characterized by lower degradation and total costs,was obtained using the method proposed in this study.The improved algorithm can search for a better population and obtain optimization results in fewer iterations.As a calculation example,data from a PV power station in northwest China were used for optimization,and the effectiveness and rationality of the proposed optimization method were verified. 展开更多
关键词 PV electrolysis of water Proton exchange membrane electrolyzer Performance attenuation Degradation cost Power scheduling optimization
下载PDF
An estimation method for direct maintenance cost of aircraft components based on particle swarm optimization with immunity algorithm 被引量:3
9
作者 吴静敏 左洪福 陈勇 《Journal of Central South University》 SCIE EI CAS 2005年第S2期95-101,共7页
A particle swarm optimization (PSO) algorithm improved by immunity algorithm (IA) was presented. Memory and self-regulation mechanisms of IA were used to avoid PSO plunging into local optima. Vaccination and immune se... A particle swarm optimization (PSO) algorithm improved by immunity algorithm (IA) was presented. Memory and self-regulation mechanisms of IA were used to avoid PSO plunging into local optima. Vaccination and immune selection mechanisms were used to prevent the undulate phenomenon during the evolutionary process. The algorithm was introduced through an application in the direct maintenance cost (DMC) estimation of aircraft components. Experiments results show that the algorithm can compute simply and run quickly. It resolves the combinatorial optimization problem of component DMC estimation with simple and available parameters. And it has higher accuracy than individual methods, such as PLS, BP and v-SVM, and also has better performance than other combined methods, such as basic PSO and BP neural network. 展开更多
关键词 aircraft design maintenance cost PARTICLE SWARM optimization IMMUNITY algorithm PREDICT
下载PDF
Solving resource availability cost problem in project scheduling by pseudo particle swarm optimization 被引量:4
10
作者 Jianjun Qi Bo Guo +1 位作者 Hongtao Lei Tao Zhang 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2014年第1期69-76,共8页
This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations amo... This paper considers a project scheduling problem with the objective of minimizing resource availability costs appealed to finish al activities before the deadline. There are finish-start type precedence relations among the activities which require some kinds of renewable resources. We predigest the process of sol-ving the resource availability cost problem (RACP) by using start time of each activity to code the schedule. Then, a novel heuris-tic algorithm is proposed to make the process of looking for the best solution efficiently. And then pseudo particle swarm optimiza-tion (PPSO) combined with PSO and path relinking procedure is presented to solve the RACP. Final y, comparative computational experiments are designed and the computational results show that the proposed method is very effective to solve RACP. 展开更多
关键词 project scheduling resource availability cost problem(RACP) HEURISTICS particle swarm optimization (PSO) path relin-king.
下载PDF
Drilling cost optimization in a hydrocarbon field by combination of comparative and mathematical methods 被引量:2
11
作者 A.Bahari A.Baradaran Seyed 《Petroleum Science》 SCIE CAS CSCD 2009年第4期451-463,共13页
In drilling operation, a large saving in time and money would be achieved by reducing the drilling time, since some of the costs are time-dependent. Drilling time could be minimized by raising the penetration rate. In... In drilling operation, a large saving in time and money would be achieved by reducing the drilling time, since some of the costs are time-dependent. Drilling time could be minimized by raising the penetration rate. In the comparative optimization method, by using the records of the first drilled wells and comparing the criteria like penetration rate, cost per foot and specific energy, the drilling parameters of the next wells being drilled can be optimized in each depth interval. In the mathematical optimization technique, some numerical equations to model the penetration rate, bit wear rate and hydraulics would be used to minimize the drilling cost and time as much as possible and improve the results of the primary comparative optimization. In this research, as a case study the Iranian Khangiran gas field has been evaluated to optimize the drilling costs. A combination of the mentioned optimization techniques resulted in an optimal well which reduced the drilling time and cost considerably in comparison with the wells already drilled. 展开更多
关键词 optimization cost per foot penetration rate drilling performance
下载PDF
Multi-objective optimization of rolling schedule based on cost function for tandem cold mill 被引量:4
12
作者 陈树宗 张欣 +3 位作者 彭良贵 张殿华 孙杰 刘印忠 《Journal of Central South University》 SCIE EI CAS 2014年第5期1733-1740,共8页
In terms of tandem cold mill productivity and product quality, a multi-objective optimization model of rolling schedule based on cost fimction was proposed to determine the stand reductions, inter-stand tensions and r... In terms of tandem cold mill productivity and product quality, a multi-objective optimization model of rolling schedule based on cost fimction was proposed to determine the stand reductions, inter-stand tensions and rolling speeds for a specified product. The proposed schedule optimization model consists of several single cost fi.mctions, which take rolling force, motor power, inter-stand tension and stand reduction into consideration. The cost function, which can evaluate how far the rolling parameters are from the ideal values, was minimized using the Nelder-Mead simplex method. The proposed rolling schedule optimization method has been applied successfully to the 5-stand tandem cold mill in Tangsteel, and the results from a case study show that the proposed method is superior to those based on empirical formulae. 展开更多
关键词 tandem cold mill multi-object optimization rolling schedule cost function simplex algorithm
下载PDF
Modeling of Combined Economic and Emission Dispatch Using Improved Sand Cat Optimization Algorithm
13
作者 Fadwa Alrowais Jaber S.Alzahrani +2 位作者 Radwa Marzouk Abdullah Mohamed Gouse Pasha Mohammed 《Computers, Materials & Continua》 SCIE EI 2023年第6期6145-6160,共16页
Combined Economic and Emission Dispatch(CEED)task forms multi-objective optimization problems to be resolved to minimize emission and fuel costs.The disadvantage of the conventional method is its incapability to avoid... Combined Economic and Emission Dispatch(CEED)task forms multi-objective optimization problems to be resolved to minimize emission and fuel costs.The disadvantage of the conventional method is its incapability to avoid falling in local optimal,particularly when handling nonlinear and complex systems.Metaheuristics have recently received considerable attention due to their enhanced capacity to prevent local optimal solutions in addressing all the optimization problems as a black box.Therefore,this paper focuses on the design of an improved sand cat optimization algorithm based CEED(ISCOA-CEED)technique.The ISCOA-CEED technique majorly concen-trates on reducing fuel costs and the emission of generation units.Moreover,the presented ISCOA-CEED technique transforms the equality constraints of the CEED issue into inequality constraints.Besides,the improved sand cat optimization algorithm(ISCOA)is derived from the integration of tra-ditional SCOA with the Levy Flight(LF)concept.At last,the ISCOA-CEED technique is applied to solve a series of 6 and 11 generators in the CEED issue.The experimental validation of the ISCOA-CEED technique ensured the enhanced performance of the presented ISCOA-CEED technique over other recent approaches. 展开更多
关键词 Economic and emission dispatch multi-objective optimization metaheuristics fuel cost minimization sand cat optimization
下载PDF
Black Widow Optimization for Multi Area Economic Emission Dispatch
14
作者 G.Girishkumar S.Ganesan +1 位作者 N.Jayakumar S.Subramanian 《Intelligent Automation & Soft Computing》 SCIE 2023年第1期609-625,共17页
The optimizationfield has grown tremendously,and new optimization techniques are developed based on statistics and evolutionary procedures.There-fore,it is necessary to identify a suitable optimization technique for a... The optimizationfield has grown tremendously,and new optimization techniques are developed based on statistics and evolutionary procedures.There-fore,it is necessary to identify a suitable optimization technique for a particular application.In this work,Black Widow Optimization(BWO)algorithm is intro-duced to minimize the cost functions in order to optimize the Multi-Area Economic Dispatch(MAED).The BWO is implemented for two different-scale test systems,comprising 16 and 40 units with three and four areas.The performance of BWO is compared with the available optimization techniques in the literature to demonstrate the strategy’s efficacy.Results show that the optimized cost for four areas with 16 units is found to be 7336.76$/h,whereas it is 121,589$/h for four areas with 40 units using BWO.It is also noted that optimization algo-rithms other than BWO require higher cost value.The best-optimized solution for emission is achieved at 9.2784e+06 tones/h,and it is observed that there is a considerable difference between the worst and the best values.Also,the suggested technique is implemented for large-scale test systems successfully with high precision,and rapid convergence occurs in MAED. 展开更多
关键词 Black widow optimization algorithm multi-objective multi-area economic dispatch emission optimization cost optimization
下载PDF
Optimization for performance-based design under seismic demands, including social costs 被引量:2
15
作者 Oscar Moller Ricardo O.Foschi +2 位作者 Juan P.Ascheri Marcelo Rubinstein Sergio Grossman 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2015年第2期315-328,共14页
Performance-based design in earthquake engineering is a structural optimization problem that has, as the objective, the determination of design parameters for the minimization of total costs, while at the same time sa... Performance-based design in earthquake engineering is a structural optimization problem that has, as the objective, the determination of design parameters for the minimization of total costs, while at the same time satisfying minimum reliability levels for the specifi ed performance criteria. Total costs include those for construction and structural damage repairs, those associated with non-structural components and the social costs of economic losses, injuries and fatalities. This paper presents a general framework to approach this problem, using a numerical optimization strategy and incorporating the use of neural networks for the evaluation of dynamic responses and the reliability levels achieved for a given set of design parameters. The strategy is applied to an example of a three-story offi ce building. The results show the importance of considering the social costs, and the optimum failure probabilities when minimum reliability constraints are not taken into account. 展开更多
关键词 earthquake engineering performance-based design optimization reliabiliy social costs
下载PDF
Optimizing Factory Performance for Unit Cost in Semiconductor Manufacturing
16
作者 Adar A. Kalir 《Open Journal of Optimization》 2023年第2期61-71,共11页
The integrated circuit (IC) manufacturing process is capital intensive and complex. The production process of unit product (or die, as it is commonly referred to) takes several weeks. Semiconductor factories (fabs) co... The integrated circuit (IC) manufacturing process is capital intensive and complex. The production process of unit product (or die, as it is commonly referred to) takes several weeks. Semiconductor factories (fabs) continuously attempt to improve their productivity, as measured in output and cycle time (or mean flow time). The conflicting objective of producing maximum units at minimal production cycle time and at the highest quality, as measured by die yield, is discussed in this paper. The inter-related effects are characterized, and a model is proposed to address this multi-objective function. We then show that, with this model, die cost can be optimized for any given operating conditions of a fab. A numerical example is provided to illustrate the practicality of the model and the proposed optimization method. 展开更多
关键词 Semiconductor Manufacturing Cycle Time Die cost Unit cost YIELD optimization PRODUCTIVITY
下载PDF
Collaborative optimization model of renewable energy development considering peak shaving costs of various flexibility resources 被引量:5
17
作者 Ji Liang Xingang Zhao Shangdong Yang 《Global Energy Interconnection》 CSCD 2021年第4期394-404,共11页
China has set carbon emission goals for 2030 and 2060.Renewable energy sources,primarily wind and photovoltaic power,are being considered as the future of power generation.The major limitation to the development of ne... China has set carbon emission goals for 2030 and 2060.Renewable energy sources,primarily wind and photovoltaic power,are being considered as the future of power generation.The major limitation to the development of new energies is the limited flexibility of regulations on power system resources,resulting in insufficient consumption capacity.Thus,the flexible resource costs for peak shaving as well as the reasonable coordinated development and operation optimization of regional renewable energy need to be considered.In this study,a renewable energy development layout configuration analysis method was established by considering the composite cost of a power system,comprehensively analyzing the potential of various flexibility regulation resources for the power system and its composite peak shaving cost,and combining renewable energy output characteristics,load forecasting,grid development,and other factors.For the optimization of various flexible resource utilization methods,a peak shaving cost estimation method from the perspective of the entire power system was established by combining the on-grid electricity prices and operating costs of different power sources.A collaborative optimization model of power system operation that aims at the lowest peak shaving cost and satisfies the constraints of operation,safety,and environmental protection was proposed.Finally,a certain area of Gansu Province was used as an example to perform detailed analysis and calculation,which demonstrated that the model has an optimal effect.This model can provide an analysis method for regional renewable energy development layout configurations and system optimization operations. 展开更多
关键词 Renewable Energy Peak Shaving cost Collaborative optimization Model
下载PDF
Green Investment Cost Optimization Model in the Supply Chain 被引量:2
18
作者 Seungbae Sim Hosang Jung 《American Journal of Operations Research》 2013年第6期454-462,共9页
The objective of this study is to develop a model that determines the optimal points for investment in green management by defining a mathematical relationship between carbon trading profits and investments in green m... The objective of this study is to develop a model that determines the optimal points for investment in green management by defining a mathematical relationship between carbon trading profits and investments in green management using a company’s supply chain information. To formulate this model, we first define and analyze a green supply chain in a multi-dimensional and quantitative manner. The green investment alternatives considering in our model are as follows: 1) purchasing eco-friendly raw materials that cost more than conventional raw materials but whose use in production results in lower CO2 emissions;2) replacing current facilities with new eco-friendly facilities that have the capability to reduce CO2 emissions;and 3) changing modes of transport from less eco-friendly to more eco-friendly modes. We propose a green investment cost optimization (GICO) model that enables us to determine the optimal investment points. The proposed GICO model can support decision-making processes in green supply chain management environments. 展开更多
关键词 Green INVESTMENT cost optimization MODEL in the Supply CHAIN
下载PDF
Capacity Optimization Configuration of Hydrogen Production System for Offshore Surplus Wind Power
19
作者 Yanshan Lu Binbin He +6 位作者 Jun Jiang Ruixiao Lin Xinzhen Zhang Zaimin Yang Zhi Rao Wenchuan Meng Siyang Sun 《Energy Engineering》 EI 2023年第12期2803-2818,共16页
To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of re... To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of residual wind power.By studying the mathematical model of wind power output and calculating surplus wind power,as well as considering the hydrogen production/storage characteristics of the electrolyzer and hydrogen storage tank,an innovative capacity optimization allocation model was established.The objective of the model was to achieve the lowest total net present value over the entire life cycle.The model took into account the cost-benefit breakdown of equipment end-of-life cost,replacement cost,residual value gain,wind abandonment penalty,hydrogen transportation,and environmental value.The MATLAB-based platform invoked the CPLEX commercial solver to solve the model.Combined with the analysis of the annual average wind speed data from an offshore wind farm in Guangdong Province,the optimal capacity configuration results and the actual operation of the hydrogen production system were obtained.Under the calculation scenario,this hydrogen production system could consume 3,800 MWh of residual electricity from offshore wind power each year.It could achieve complete consumption of residual electricity from wind power without incurring the penalty cost of wind power.Additionally,it could produce 66,500 kg of green hydrogen from wind power,resulting in hydrogen sales revenue of 3.63 million RMB.It would also reduce pollutant emissions from coal-based hydrogen production by 1.5 tons and realize an environmental value of 4.83 million RMB.The annual net operating income exceeded 6 million RMB and the whole life cycle NPV income exceeded 50 million RMB.These results verified the feasibility and rationality of the established capacity optimization allocation model.The model could help advance power system planning and operation research and assist offshore wind farm operators in improving economic and environmental benefits. 展开更多
关键词 Surplus wind power offshore wind power hydrogen generation capacity optimization configuration total net present cost
下载PDF
Simple Real Time Non-Co-Operative Game Theoritic Model for Energy Cost Optimization in Developing Countries 被引量:1
20
作者 Amit S. Closepet 《Journal of Power and Energy Engineering》 2014年第4期220-226,共7页
This paper describes the significant cost saving opportunities for consumers in developing countries by the use of a simple non-cooperative game theoretic mathematical model for demandside management techniques to mit... This paper describes the significant cost saving opportunities for consumers in developing countries by the use of a simple non-cooperative game theoretic mathematical model for demandside management techniques to mitigate the massive use of diesel back-up during grid outages and also other cost optimization schemes. Application of real time load scheduling optimization is investigated during power outages, for residential consumer in India. This method involves a beautiful formulation of a non–cooperation behavior between the diesel generator & the residential consumer during power outages. This involves a tree model with a two player game, where in player one is the diesel generator & player two is the consumer. Depending on the duration of the outage & the consumers limit on the cost for energy different cost optimization strategies can be generated. The load types modeled include passive loads and schedulable, i.e. typically heavy loads. It is found that this DSM schemes show excellent benefits to the consumer. The maximum diesel savings for the consumer due to strategy formulation can be approximately ranging from 45% to as high as 75% for a flat-tariff grid. The study also showed that the actual savings potential depends on the timing of power outage, duration and the specific load characteristics. 展开更多
关键词 GAME Theory DEMAND Side Management cost optimization DIESEL Mitigation
下载PDF
上一页 1 2 237 下一页 到第
使用帮助 返回顶部