A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to...A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency.展开更多
The concept of a flexible power electronics substation(FPES)was first applied in the Zhangbei DC distribution network demonstration project.As a multi-port power electronics transformer(PET)with different AC and DC vo...The concept of a flexible power electronics substation(FPES)was first applied in the Zhangbei DC distribution network demonstration project.As a multi-port power electronics transformer(PET)with different AC and DC voltage levels,the FPES has adopted a novel topology integrating modular multilevel converter(MMC)and four-winding medium frequency transformer(FWMFT)based multiport DC-DC converter,which can significantly reduce capacitance in each sub-module(SM)of a MMC and also save space and cost.In this paper,in order to accelerate speed of electromagnetic transient(EMT)simulations of FPES based hybrid AC/DC distribution systems,an averaged-value model(AVM)is proposed for efficient and accurate representation of FPES.Assume that all SM capacitor voltages are perfectly balanced in the MMC,then the MMC behavior can be modeled using controlled voltage sources based on modulation voltages from control systems.In terms of the averaged current transfer characteristics among the windings of the FWMFT,we consider that all multiport DC-DC converters are controlled with the same dynamics,a lumped averaged model using controlled current and voltage sources has been developed for these four-port DC-DC converters connected to the upper or lower arms of the MMC.The presented FPES AVM model has been tested and validated by comparison with a detailed IGBT-based EMT model.Results show that the AVM is significantly more efficient while maintaining its accuracy in an EMT simulation.展开更多
5G通信基站通常配备光储,数量庞大、功耗可调,是一种优质的电力灵活性调节资源。提出了多类型光储式5G基站集群灵活性资源聚合方法以及参与电网调峰的协同调度策略。首先,分析休眠机制下多类型基站功耗可调特性与计及基站备用电量的储...5G通信基站通常配备光储,数量庞大、功耗可调,是一种优质的电力灵活性调节资源。提出了多类型光储式5G基站集群灵活性资源聚合方法以及参与电网调峰的协同调度策略。首先,分析休眠机制下多类型基站功耗可调特性与计及基站备用电量的储能调节能力。基于极限场景思想,构建了光储式5G基站的灵活性空间量化模型。在此基础上,利用闵可夫斯基和法刻画异构基站柔性资源的时空耦合能量轨迹,得到海量基站集群的灵活性资源聚合可调域。其次,建立了基站集群聚合资源参与电能量市场和辅助服务市场的协同调度优化模型,提出了基于交替方向乘子法(alternating direction method of multipliers, ADMM)的分层分布式基站集群协同优化调度策略,将大规模基站集群调度问题降维分解为统一协同调峰功率响应、聚合功率自治调度和基站集群功率分配3个子问题进行求解。通过算例对比分析可知,所提策略可降低通信基站69.86%的用能成本,为提升通信资源利用率和电力系统灵活调节能力提供了有效手段。展开更多
文摘A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency.
基金This work was supported in part by the National Nature Science Foundation of China(51977142)。
文摘The concept of a flexible power electronics substation(FPES)was first applied in the Zhangbei DC distribution network demonstration project.As a multi-port power electronics transformer(PET)with different AC and DC voltage levels,the FPES has adopted a novel topology integrating modular multilevel converter(MMC)and four-winding medium frequency transformer(FWMFT)based multiport DC-DC converter,which can significantly reduce capacitance in each sub-module(SM)of a MMC and also save space and cost.In this paper,in order to accelerate speed of electromagnetic transient(EMT)simulations of FPES based hybrid AC/DC distribution systems,an averaged-value model(AVM)is proposed for efficient and accurate representation of FPES.Assume that all SM capacitor voltages are perfectly balanced in the MMC,then the MMC behavior can be modeled using controlled voltage sources based on modulation voltages from control systems.In terms of the averaged current transfer characteristics among the windings of the FWMFT,we consider that all multiport DC-DC converters are controlled with the same dynamics,a lumped averaged model using controlled current and voltage sources has been developed for these four-port DC-DC converters connected to the upper or lower arms of the MMC.The presented FPES AVM model has been tested and validated by comparison with a detailed IGBT-based EMT model.Results show that the AVM is significantly more efficient while maintaining its accuracy in an EMT simulation.
文摘5G通信基站通常配备光储,数量庞大、功耗可调,是一种优质的电力灵活性调节资源。提出了多类型光储式5G基站集群灵活性资源聚合方法以及参与电网调峰的协同调度策略。首先,分析休眠机制下多类型基站功耗可调特性与计及基站备用电量的储能调节能力。基于极限场景思想,构建了光储式5G基站的灵活性空间量化模型。在此基础上,利用闵可夫斯基和法刻画异构基站柔性资源的时空耦合能量轨迹,得到海量基站集群的灵活性资源聚合可调域。其次,建立了基站集群聚合资源参与电能量市场和辅助服务市场的协同调度优化模型,提出了基于交替方向乘子法(alternating direction method of multipliers, ADMM)的分层分布式基站集群协同优化调度策略,将大规模基站集群调度问题降维分解为统一协同调峰功率响应、聚合功率自治调度和基站集群功率分配3个子问题进行求解。通过算例对比分析可知,所提策略可降低通信基站69.86%的用能成本,为提升通信资源利用率和电力系统灵活调节能力提供了有效手段。