期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
A quantitative model for danger degree evaluation of staged operation of earth dam reservoir in flood season and its application 被引量:3
1
作者 Chong-xun Mo Gui-yan Mo +3 位作者 Qing Yang Yu-li Ruan Qing-ling Jiang Ju-liang Jin 《Water Science and Engineering》 EI CAS CSCD 2018年第1期81-87,共7页
Based on the natural disaster risk evaluation mode, a quantitative danger degree evaluation model was developed to evaluate the danger degree of earth dam reservoir staged operation in the flood season. A formula for ... Based on the natural disaster risk evaluation mode, a quantitative danger degree evaluation model was developed to evaluate the danger degree of earth dam reservoir staged operation in the flood season. A formula for the overtopping risk rate of the earth dam reservoir staged operation was established, with consideration of the joint effect of flood and wind waves in the flood sub-seasons with the Monte Carlo method, and the integrated overtopping risk rate for the whole flood season was obtained via the total probability approach. A composite normalized function was used to transform the dam overtopping risk rate into the danger degree, on a scale of 0-1. Danger degree gradating criteria were divided by four significant characteristic values of the dam overtopping rate, and corresponding guidelines for danger evaluation are explained in detail in this paper. Examples indicated that the dam overtopping danger degree of the Chengbihe Reservoir in China was 0.33-0.57, within the range of moderate danger level, and the flood-limiting water level (FLWL) can be adjusted to 185.00 m for the early and main flood seasons, and 185.00-187.50 m for the late flood season. The proposed quantitative model offers a theoretical basis for determination of the value of the danger degree of an earth dam reservoir under normal operation as well as the optimal scheduling scheme for the reservoir in each stage of the flood season. 展开更多
关键词 Reservoir staged operation in flood season Earth dam Danger degree Quantitative evaluation Overtopping risk rate
下载PDF
The Operational Forecasting of Total Precipitation in Flood Seasons (April to September) of 5 Years (1983-1987)
2
作者 汤懋苍 李天时 +1 位作者 张建 李存强 《Advances in Atmospheric Sciences》 SCIE CAS CSCD 1989年第3期289-300,共12页
Ⅰ.INTRODUCTION We have discovered that there exists a good corresponding relationship between theanomalous axes of soil temperature at a depth of 1.6m in winter (December to February) andprecipitations in following f... Ⅰ.INTRODUCTION We have discovered that there exists a good corresponding relationship between theanomalous axes of soil temperature at a depth of 1.6m in winter (December to February) andprecipitations in following flood season (Tang et al., 1982a). We have also designed a simplethermodynamical model and applied it to the forecasting of precipitations in the flood season(Tang et al., 1982 b,c). The practical forecast started from 1975. Before 1980, however, therewere only 40-50 stations in China for measuring the soil temperature at a 1.6m depth. Since1980, the stations have been increased to a total of about 180, but no available mean valueshad been obtained from newly added stations before 1982. Therefore the analysis and map-ping of anomalies of soil temperature was not performed until 1983, and from then on theprecision of analysis has been greatly improved. The following is the actual situation of forecast in five years from 1983 to 1987. 展开更多
关键词 of 5 Years April to September The operational Forecasting of Total Precipitation in flood Seasons
下载PDF
Assessing Flood Risk Using Reservoir Flood Control Rules 被引量:1
3
作者 Xiang Fu Yadong Mei Zhihuai Xiao 《Journal of Earth Science》 SCIE CAS CSCD 2016年第1期68-73,共6页
The application of conventional flood operation regulation is restricted due to insufficient description of flood control rules for the Pubugou Reservoir in southern China. Based on the requirements of different flood... The application of conventional flood operation regulation is restricted due to insufficient description of flood control rules for the Pubugou Reservoir in southern China. Based on the requirements of different flood control objects, this paper proposes to optimize flood control rules with punishment mechanism by defining different parameters of flood control rules in response to flood inflow forecast and reservoir water level. A genetic algorithm is adopted for solving parameter optimization problem. The failure risk and overflow volume of the downstream insufficient flood control capacity are assessed through the reservoir operation policies. The results show that an optimised regulation can provide better performance than the current flood control rules. 展开更多
关键词 reservoir flood control operation parameters optimization of rules risk assessment.
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部