期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Numerical Analysis of Emergency River Restoration Scheme for Qingping Mega Debris Flow 被引量:2
1
作者 CHEN Ri-dong LIU Xing-nian +1 位作者 HUANG Er GUO Zhi-xue 《Journal of Mountain Science》 SCIE CSCD 2013年第1期130-136,共7页
The mega debris flow occurred on August 13 th 2010 in Qingping town,China(hereafter called '8.13' Debris Flow) have done great damage to the local habitants as well as to the re-construction projects in the qu... The mega debris flow occurred on August 13 th 2010 in Qingping town,China(hereafter called '8.13' Debris Flow) have done great damage to the local habitants as well as to the re-construction projects in the quake-hit areas,and the channel-fill deposit problem caused by the debris flow was the most destructive.Moreover,it is of high possibility that an even severe deposit problem would reappear and result in worse consequences.In order to maximize risk reduction of this problem,relevant departments of the government established a series of emergency river restoration schemes,for which the numerical analysis is an important procedure to evaluate and determine the optimized one.This study presents a numerical analysis by applying a twodimensional debris flow model combined with a relevant water-sediment model to simulate the deposit during the progress of the debris flow,and to calculate and analyze the river flow field under both the present condition and different restoration conditions.The results show that the debris flow model,which takes the confluence of the Wenjia Gully to the main river into account,could simulate the deposit process quite well.In the reproduced debris flow from the simulation of the '8.13' Debris Flow,the original river flow path has switched to a relatively lower place just along the right bank with a high speed of near 7m.s-1 after being blocked by the deposit,which is highly hazardous.To prevent this hazard,a recommended scheme is derived through inter-comparison of different restoration conditions.It shows that the recommended scheme is able to reduce the water level and as well to regulate the flow path.Based on the given conditions of the mainstream and the tributary confluence for the simulated '8.13' Debris Flow,when encountering a debris flow with deposit volume less than 0.5 million m3,the river channel can endure a 20-year return flood;however,when the deposit volume increases to 2 million m3,the flood capacity of the river will be greatly impacted and the scheme becomes invalid.The recommended scheme supported by the present study has been applied to the emergency river restoration after this mega-debris flow. 展开更多
关键词 Flash flood Debris flow River restoration Numerical analysis Finite element method
下载PDF
The Effect of integrated Traditional Chineseand Western Medicine on the Recovery of Patients with Early Acute Cerebral Hemorrhage
2
作者 吴延林 《Chinese Journal of Integrative Medicine》 SCIE CAS 1996年第4期258-261,共4页
The author compared in this study the effects of the treatment with integrated traditional andwestern medicine with that of routine western medicine alone on the recovery of patients with acute hyperten-sive cerebral ... The author compared in this study the effects of the treatment with integrated traditional andwestern medicine with that of routine western medicine alone on the recovery of patients with acute hyperten-sive cerebral hemorrhage. The results of the treatments showed that integrated traditional Chinese and west-ern medicine had better effect on speeding up the absorption of intracranial hematoma, elimination of en-cephaledema and restoration of neural functions than routine western medicine. There is significant differencebetween the results of the two kinds of treatment (P< 0. 05 ̄0. 01 ) , which suggested that treating patientsearly with traditional Chinese medicine greatly helps the recovery of patients with cerebral hemorrhage. 展开更多
关键词 cerebral hemorrhage intracranial hematoma tonify the Kidney and promote blood flow restoration of neural function
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部