Water resources development in Turkey
1
作者 Bulent Acma 《水道港口》 2010年第5期544-544,共1页
The Southeastern Anatolia Projec(tGAP),one of the most important projects for developing remarkable natural resources of the world,is accepted as a change for getting benefit from rich water and agricultural resources... The Southeastern Anatolia Projec(tGAP),one of the most important projects for developing remarkable natural resources of the world,is accepted as a change for getting benefit from rich water and agricultural resources of the Southeastern Anatolia Region.The GAP Project has been considered as a regional development projects through years,but the dimensions of sustainability,protection of environment and participatory have been attached to the master of the project in recent years.When the GAP Project is completed,the Upper Mesopotomia, the centers of many civilisation,will re-again its importance as it had in the ancient times,and will be alive a center of civilisation.Moreover,when the problem of water shortage and water supplies in the world for the future is kept in mind,the importance of Southeastern Anatolia′s water supplies will be doubled.For this reason,the GAP Project,developed by depending on water and natural resources of the region,will have an important place in the world.The aim of this study is to introduce the region with rich natural resources and the GAP Project.For this reason,firstly,the natural potential of the region will be introduced.Second,the GAP Project will be presented in details.In the third stage,the projects being processed for protecting the natural sources and environment will be analyzed.In the last stage,strategies and policies to develop and to protect the natural resources of the region in short,mid,and long terms will be proposed. 展开更多
关键词 natural and water resources turkey Southeastern Anatolia Region Southeastern Anatolia project (GAP)
下载PDF
The Risks of Financing Energy in Turkey: Heading for a Rocky Road
2
作者 Esin Okay 《Open Journal of Energy Efficiency》 2014年第1期1-13,共13页
After the implementation of Energy Efficiency Law (EEL) in Turkey, Turkish engineering firms show considerable interest in energy savings projects. There is a growing sign of an energy effi- ciency implementation in T... After the implementation of Energy Efficiency Law (EEL) in Turkey, Turkish engineering firms show considerable interest in energy savings projects. There is a growing sign of an energy effi- ciency implementation in Turkey. However, energy importation costs of Turkey still present a challenge leading to huge financial burdens. This paper explores the energy financing in Turkey and the likelihood of risks after the establishment of structural reforms. The so-called structural problems on the agenda of Turkey are emphasized during the crisis. Actually, global crisis affected the lending conditions herein counterparty risk and restricted the relations of enterprises and banks. In this study, it is argued that there are strong barriers for the future energy saving industry in Turkey made up of macro-economic, micro-economic and financial risks coming through both domestic and global means. 展开更多
关键词 ENERGY projects ENERGY SAVING Industry ENERGY FINANCING Credit RISK Country RISK turkey
下载PDF
A Study on the Causes of Sediment Accumulation in the Drainage Systems
3
作者 Cengiz Koc Ebru Yilmaz 《Journal of Water Resource and Protection》 2014年第4期224-235,共12页
Accumulation of sediment and silt in the drainage canals is undesirable, yet inevitable occurrence in the course of the use and operation of any drainage canal network. In this study, D-25 drainage canal group, taking... Accumulation of sediment and silt in the drainage canals is undesirable, yet inevitable occurrence in the course of the use and operation of any drainage canal network. In this study, D-25 drainage canal group, taking place in the Nazilli irrigation system with an area of 1165 ha is the only system where all planned activities have been completed. It has been determined that the drainage system was constructed according to original drainage project. The depth of accumulated sediment in the drainage canals in the research area was determined from the difference between the measured elevation and the elevation given in the design projects. The reasons for siltation in the D-25 drainage canal group have been studied by looking at the results of the elevation measurements made in 2010-2012. The measurements made in D-25 drainage canal group showed that there were significant differences between the actual structure (bridge, culvert, and conduit) bottom elevations and the elevations given in the design projects. In addition, the length of some canals would not coincide with the design project either. 83.3% (93.3% in length) of the canals had differences in structure bottom elevations. Of the total 55 structures 45 (81.8%) had a 0.10 m or more difference in bottom elevation from the project. Of the erroneous structures 73.3% had an average of 0.40 m, and 26.7% had an average of -0.25 m difference in bottom elevations from the design projects. 展开更多
关键词 Drainage Canal SEDIMENT STRUCTURE Design project turkey