期刊文献+
共找到4,717篇文章
< 1 2 236 >
每页显示 20 50 100
Method of non-stationary random vibration reliability of hydro-turbine generator unit
1
作者 Zhaojun Li Fuxiu Liu +2 位作者 Ganwei Cai Jiang Ding Jiaquan Chen 《Acta Mechanica Sinica》 SCIE EI CAS CSCD 2024年第9期98-115,共18页
The hydraulic excitation acting on a hydro-turbine generator unit exhibits obvious non-stationary characteristics.In order to account for these characteristics,this study focuses on the non-stationary random vibration... The hydraulic excitation acting on a hydro-turbine generator unit exhibits obvious non-stationary characteristics.In order to account for these characteristics,this study focuses on the non-stationary random vibration reliability of the hydro-turbine generator unit.Firstly,the non-stationary characteristics of the hydraulic excitation are analyzed,and a mathematical ex-pression is constructed using the virtual excitation method.Secondly,a dynamic model of the unit is established to demonstrate the non-stationary random vibration characteristics under hydraulic excitation.Thirdly,an active learning non-stationary vibration reliability analysis method AK-MCS-T-H is proposed combining the Kriging model,the Monte Carlo simulation(MCS)method,and the information entropy learning function H.This method reveals the influence of the non-stationary hydraulic excitation on the random vibration reliability of the hydro-turbine generator unit.Finally,an example is presented to analyze the random vibration reliability.The study shows that the AK-MCS-T-H proposed in this paper can solve the problem of non-stationary random vibration reliability of the Francis hydro-turbine generator unit more effectively. 展开更多
关键词 Hydro-turbine generator unit Hydraulic excitation Non-stationarity Vibration reliability Active learning
原文传递
Using Hybrid Penalty and Gated Linear Units to Improve Wasserstein Generative Adversarial Networks for Single-Channel Speech Enhancement
2
作者 Xiaojun Zhu Heming Huang 《Computer Modeling in Engineering & Sciences》 SCIE EI 2023年第6期2155-2172,共18页
Recently,speech enhancement methods based on Generative Adversarial Networks have achieved good performance in time-domain noisy signals.However,the training of Generative Adversarial Networks has such problems as con... Recently,speech enhancement methods based on Generative Adversarial Networks have achieved good performance in time-domain noisy signals.However,the training of Generative Adversarial Networks has such problems as convergence difficulty,model collapse,etc.In this work,an end-to-end speech enhancement model based on Wasserstein Generative Adversarial Networks is proposed,and some improvements have been made in order to get faster convergence speed and better generated speech quality.Specifically,in the generator coding part,each convolution layer adopts different convolution kernel sizes to conduct convolution operations for obtaining speech coding information from multiple scales;a gated linear unit is introduced to alleviate the vanishing gradient problem with the increase of network depth;the gradient penalty of the discriminator is replaced with spectral normalization to accelerate the convergence rate of themodel;a hybrid penalty termcomposed of L1 regularization and a scale-invariant signal-to-distortion ratio is introduced into the loss function of the generator to improve the quality of generated speech.The experimental results on both TIMIT corpus and Tibetan corpus show that the proposed model improves the speech quality significantly and accelerates the convergence speed of the model. 展开更多
关键词 Speech enhancement generative adversarial networks hybrid penalty gated linear units multi-scale convolution
下载PDF
Analysis on the Problems in Start-up and Debugging of Two 600 MW Generating Units in Yangzhou No.2 Thermal Power Plant
3
作者 蒯狄正 《Electricity》 2001年第2期11-15,共5页
The problems including excessive flow of attemperating water for boiler, failure of butterfly valve at the outlet of circulating water pump, burnt-out of thyristor for excitation regulator, load variation rate of CCS ... The problems including excessive flow of attemperating water for boiler, failure of butterfly valve at the outlet of circulating water pump, burnt-out of thyristor for excitation regulator, load variation rate of CCS not complying with the contract target, etc. occurred during start-up and debugging of two 600 MW generating units in Yangzhou No.2 Thermal Power Plant. Through analysis on these problems. the remedial measures were put forward, to which can be referred for similar units. 展开更多
关键词 start-up and debugging problems analysis remedial measures 600 MW generating unit
下载PDF
Improved Units of Measure in Rotational Mechanics
4
作者 Richard James Petti 《World Journal of Mechanics》 2024年第1期1-7,共7页
The SI system of units in rotational mechanics yields correct numerical results, but it produces physically incorrect units of measure in many cases. SI units also violate the principle of general covariance—the gene... The SI system of units in rotational mechanics yields correct numerical results, but it produces physically incorrect units of measure in many cases. SI units also violate the principle of general covariance—the general rule for defining continuous coordinates and units in mathematics and mathematical physics. After 30+ years of wrestling with these problems, the ultimate authority on units of measure has declared that Newton–meter and Joule are not equivalent in rotational mechanics, as they are in the rest of physics. This article proposes a simple modification to SI units called “Nonstandard International units” (“NI units”) until a better name is agreed upon. NI units yield correct numerical results and physically correct units of measure, and they satisfy the principle of general covariance. The main obstacle to the adoption of NI units is the consensus among users that the radius of rotation should have the unit meter because the radius can be measured with a ruler. NI units assigned to radius should have units meter/radian because the radius is a conversion factor between angular size and circumferential length, as in arclength = rθ. To manage the social consensus behind SI units, the author recommends retaining SI units as they are, and informing users who want correct units that NI units solve the technical problems of SI units. 展开更多
关键词 Rotational Mechanics Angular unit TORQUE Moment of Inertia Angular Momentum general Covariance
下载PDF
Construction Schedule of Generating Units Actually Realized in 1996 (as of Aug. 8,1996) 被引量:2
5
《Electricity》 1996年第4期53-53,共1页
关键词 as of Aug Construction Schedule of generating units Actually Realized in 1996
下载PDF
An Analysis of the Designed Performance and Structural Characteristics of the Turbine Generating Units of TGP 被引量:1
6
作者 Huang Yuanfang (China Yangtze Three Gorges Project Development Corporation, Yichang, Hubei\ 443002) 《工程科学(英文版)》 2003年第1期47-52,共6页
The main technical requirement of the turbine generating units for the Three Gorges Project (TGP) has a basic conclusion through a long term study and research as well as demonstration.Along with the TGP construction ... The main technical requirement of the turbine generating units for the Three Gorges Project (TGP) has a basic conclusion through a long term study and research as well as demonstration.Along with the TGP construction and successful execution of the contract of turbine generating units,the technical difficulties concerning the performance and structure of turbine generating units have been further recognized.In this paper some issues are discussed and analyzed in connection with a deep going cognition of turbine generating units for TGP during the period of design, manufacture and installation. 展开更多
关键词 Three Gorges Project TURBINE generating units TECHNICAL problems DISCUSSION and ANALYSIS
下载PDF
The design and practice of giant hydro turbine generating units of Three Gorges Project
7
作者 Shao Jianxiong Liu Jingwang Yuan Dafu 《Engineering Sciences》 EI 2011年第3期88-95,共8页
The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters... The main technical problems that should be considered in the design of hydro-turbine generating units of Three Gorges Project (TGP) are analyzed;the key technical researches performed are summarized,and the parameters of hydro-turbine generating units are optimized through the study on key technical problems.The unit operation indicates that the performance of the hydro-turbine generating units is excellent,and the units can operate in a safe,stable and highly efficient mode for a long term.Therefore,it is verified effectively that the general technical design of units is scientific and rational. 展开更多
关键词 Three Gorges Project (TGP) 700 MW hydro-turbine generating unit unit capacity design and research operation stability practice
下载PDF
Analysis on Operation Reliability of Generating Units in 2009
8
作者 Zhou Hong Power Reliability Management Center Li Shixue 《Electricity》 2010年第3期26-31,共6页
This paper presents the data on operation reliability indices and relevant analyses toward China's conventional power generating units in 2009.The units brought into the statistical analysis include 100-MW or abov... This paper presents the data on operation reliability indices and relevant analyses toward China's conventional power generating units in 2009.The units brought into the statistical analysis include 100-MW or above thermal generating units,40-MW or above hydro generating units,and all nuclear generating units.The reliability indices embodied include utilization hours,times and hours of scheduled outages,times and hours of unscheduled outages,equivalent forced outage rate and equivalent availability factor. 展开更多
关键词 power plant generating unit operation reliability statistical data
下载PDF
Construction Schedule of Generating Units to be Commissioned in 1998 (as of Dec 11, 1998)
9
《Electricity》 1999年第2期50-50,共1页
关键词 as of Dec 11 Construction Schedule of generating units to be Commissioned in 1998
下载PDF
8 large coal-fired generating units planned to be commissioned in Shandong Power Grid in 1997
10
《Electricity》 1997年第2期51-52,共2页
关键词 GRID large coal-fired generating units planned to be commissioned in Shandong Power Grid in 1997
下载PDF
Speed up the Retrofit of Thermal Power Generating Units, Raise the Effectiveness of Power Plant Comprehensively
11
作者 Jiang Zhesheng 《Electricity》 2000年第1期13-16,共4页
关键词 Speed up the Retrofit of Thermal Power generating units Raise the Effectiveness of Power Plant Comprehensively
下载PDF
Study on Generation Cost Prediction Based on Coal Quality and Generating Unit Performance 被引量:6
12
作者 ZHONG Wei LIU Chenggang ZHOU Yonggang WU Yanling ZHOU Yi LI Pei 《中国电机工程学报》 EI CSCD 北大核心 2013年第11期I0004-I0004,6,共1页
燃料变化条件下发电成本的预测是火电厂普遍关心的重要课题。分析了影响机组性能及发电电量成本的各种煤质指标,重点研究了基于结构参数及燃烧传热机理的锅炉稳态热力性能分析计算方法,讨论了制粉系统、风机、脱硫和脱硝装置性能随燃... 燃料变化条件下发电成本的预测是火电厂普遍关心的重要课题。分析了影响机组性能及发电电量成本的各种煤质指标,重点研究了基于结构参数及燃烧传热机理的锅炉稳态热力性能分析计算方法,讨论了制粉系统、风机、脱硫和脱硝装置性能随燃料等运行条件的变化关系,最终提出了基于煤质和机组性能分析计算的发电电量成本预测模型并研发了“煤炭选配与机组发电成本预测系统”。该系统在我国某600MW火电厂的实际应用经验表明:提出的电量成本分析预测模型合理,研发的软件系统有助于辅助火电厂的选煤和购煤决策,优化动力配煤方案,从而提高火电厂的运行经济性。 展开更多
关键词 成本预测 发电成本 机组性能 市场化改革 煤质 火电厂 电力 燃料
下载PDF
Designing a Protection Scheme in Micro-Grid Systems with DG Using Central Protection Unite and Multiple Setting Group Protection Relays
13
作者 Mostafa I. Saleh Gaber El-Saady +1 位作者 Ali M. Yousef El-Noby A. Ibrahim 《Journal of Power and Energy Engineering》 2024年第9期37-49,共13页
Distributed generators now is widely used in electrical power networks, in some cases it works seasonally, and some types works at special weather conditions like photo voltaic systems and wind energy, and due to this... Distributed generators now is widely used in electrical power networks, in some cases it works seasonally, and some types works at special weather conditions like photo voltaic systems and wind energy, and due to this continuous changes in generation condition, the fault current level in network will be affected, this changes in fault current level will affect in the coordination between protection relays and to keep the coordination at right way, an adaptive protection system is required that can adaptive its setting according to generation changes, the fault current level in each case is evaluated using ETAP software, and the required relay setting in each case is also evaluated using Grey Wolf Optimizer (GWO) algorithm, and to select suitable setting which required in each condition, to select the active setting group of protection relay according to generation capacity, central protection unite can be used, and to improve protection stability and minimizing relays tripping time, a proposed method for selecting suitable backup relay is used, which leads to decrease relays tripping time and increase system stability, output settings for relays in all cases achieved our constrains. 展开更多
关键词 Directional Overcurrent Relay Protection Coordination Distributed generators Central Protection unite Multiple Setting Group Protection Relay
下载PDF
ZIZ-2 Vibration monitoring and diagnosing system for turbine generator units
14
《Electricity》 1996年第1期53-53,共1页
ZJZ-2 system has the following functions: (1) Real-time on-line sampling and FFT analysis (32 channel); (2) Data aquisition, analysis and storage during start-up and shut-down; (3) Alarming, emergency recognition and ... ZJZ-2 system has the following functions: (1) Real-time on-line sampling and FFT analysis (32 channel); (2) Data aquisition, analysis and storage during start-up and shut-down; (3) Alarming, emergency recognition and fault retrieval; (4) Data aquisition, analysis and storage during daily operation; (5) Recall of historic data; (6) Output of routine reports and tables; (7) Analysis of vibration behaviour: Bode plot, polar plot, spectrum, cascade, waveform, shaft orbit, trend, etc; 展开更多
关键词 LINE ZIZ-2 Vibration monitoring and diagnosing system for turbine generator units
下载PDF
An Analysis of Zhabei Cas Turbine Project and the Development of Cas Turbine Generating Unit
15
《Electricity》 1997年第4期21-23,共3页
关键词 PROJECT An Analysis of Zhabei Cas Turbine Project and the Development of Cas Turbine generating unit
下载PDF
Optimal Load Dispatch of Gas Turbine Power Generation Units based on Multiple Population Genetic Algorithm
16
作者 Hua Xiao Cheng Yang +1 位作者 Jie Wu Xiaoqian Ma 《Engineering(科研)》 2013年第1期197-201,共5页
In this paper, a multiple population genetic algorithm (MPGA) is proposed to solve the problem of optimal load dispatch of gas turbine generation units. By introducing multiple populations on the basis of Standard Gen... In this paper, a multiple population genetic algorithm (MPGA) is proposed to solve the problem of optimal load dispatch of gas turbine generation units. By introducing multiple populations on the basis of Standard Genetic Algorithm (SGA), connecting each population through immigrant operator and preserving the best individuals of every generation through elite strategy, MPGA can enhance the efficiency in obtaining the global optimal solution. In this paper, MPGA is applied to optimize the load dispatch of 3×390MW gas turbine units. The results of MPGA calculation are compared with that of equal micro incremental method and AGC instruction. MPGA shows the best performance of optimization under different load conditions. The amount of saved gas consumption in the calculation is up to 2337.45m3N/h, which indicates that the load dispatch optimization of gas turbine units via MPGA approach can be effective. 展开更多
关键词 Gas TURBINE generation units LOAD DISPATCH MPGA Optimization
下载PDF
The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan Thermal Power Plant went into commercial operation
17
《Electricity》 2000年第3期45-45,共1页
关键词 The first thermal power plant project solely invested by foreign firms in china-The first generating unit in Meizhouwan Thermal Power Plant went into commercial operation
下载PDF
Optimizing Combination of Units Commitment Based on Improved Genetic Algorithms
18
作者 LAI Yifei ZHANG Qianhua JIA Junping 《Wuhan University Journal of Natural Sciences》 CAS 2007年第6期1003-1007,共5页
GAs are general purpose optimization techniques based on principles inspired from the biological evolution using metaphors of mechanisms, such as natural selection, genetic recombination and survival of the fittest. B... GAs are general purpose optimization techniques based on principles inspired from the biological evolution using metaphors of mechanisms, such as natural selection, genetic recombination and survival of the fittest. By use of coding betterment, the dynamic changes of the mutation rate and the crossover probability, the dynamic choice of subsistence, the reservation of the optimal fitness value, a modified genetic algorithm for optimizing combination of units in thermal power plants is proposed. And through taking examples, test result are analyzed and compared with results of some different algorithms. Numerical results show available value for the unit commitment problem with examples. 展开更多
关键词 generating units unit commitment genetic algorithms
下载PDF
Economical operation of Baosteel's oxygen generating system
19
作者 ZHU Huizhong GAO Yuan GU Yunjie MA Yi 《Baosteel Technical Research》 CAS 2009年第3期27-31,共5页
Baosteel's 60000 m^3/h air separation unit (ASU) is the largest oxygen generating system in China. The operational cost of such a giant system is very high. How to reduce the operational cost is a critical issue. T... Baosteel's 60000 m^3/h air separation unit (ASU) is the largest oxygen generating system in China. The operational cost of such a giant system is very high. How to reduce the operational cost is a critical issue. This paper discusses the system's characteristics,the current operational status and the difficulties in reducing the cost,and analyzes relevant indicators, such as the technical and economical indicators of individual units and systems as well as the indicators concerning the costs. The relationship between the cost and each economical indicator and measures to optimize an economical operation of the oxygen generating system are also discussed in this paper. 展开更多
关键词 large-scale air separation unit oxygen generating system oxygen dispersion rate
下载PDF
Acute Generalized Peritonitis in Intensive Care Unit at University Hospital of Brazzaville, Republic of Congo: Etiological, Therapeutic Aspects and Issues
20
作者 Christ Mayick Mpoy Emy Monkessa Peggy Dahlia Gallou Leyono-Mawandza +4 位作者 Marie Elombila Gilles Niengo Outsouta Marina Aurole Bokoba-Nde Ngala Giresse Bienvenu Tsouassa Wa Ngono Gilbert Fabrice Otiobanda 《Open Journal of Emergency Medicine》 2020年第4期86-94,共9页
<b><span style="font-family:Verdana;">Aim: </span></b><span style="font-family:""><span style="font-family:Verdana;">To determine etiological, the... <b><span style="font-family:Verdana;">Aim: </span></b><span style="font-family:""><span style="font-family:Verdana;">To determine etiological, therapeutic aspects and issues of AGP in intensive care unit (ICU) at University Hospital of Brazzaville (UHB). </span><b><span style="font-family:Verdana;">Materials and Methods: </span></b><span style="font-family:Verdana;">It was a retrospective and descriptive study carried out from January to December 2016 in ICU at UHB. We collected completed medical records of patients admitted and operated for AGP regardless of age or sex. The parameters studied were age, sex, admission’s reasons, etiologies, management, post-operative complications, length of hospital and mortality. Data were treated in Excel 2010 and Epi info 2007. </span><b><span style="font-family:Verdana;">Results: </span></b><span style="font-family:Verdana;">Thirty-one complete medical records were identified (mean age: 40.6 ± 22.0 years). The sex ratio was 2.4. Shock was the most common reason for admission with 67.7% of the cases. The etiologies of AGP w</span></span><span style="font-family:Verdana;">ere</span><span style="font-family:Verdana;"> dominated by gastroduodenal perforating ulcer (41.9%) followed </span><span style="font-family:Verdana;">by </span><span style="font-family:""><span style="font-family:Verdana;">complicated appendicitis (19.4%). The management of all patients was medico-surgical. The bi antibiotic ceftriaxone-metronidazole was administered in 29 patients (93.6%). 18 patients (59.1%) received vasopressor therapy. The complications had occurred among 9 patients </span><i><span style="font-family:Verdana;">i.e.</span></i><span style="font-family:Verdana;"> 29% of the cases;parietal suppurations represented 44.5% of the complications. The average length of hospitalization was 5.2 ± 4.6 days. The overall mortality was 41.9%. </span><b><span style="font-family:Verdana;">Conclusion: </span></b><span style="font-family:Verdana;">In our study, the most frequent etiologies were gastroduodenal perforating ulcer and complicated appendicitis. They affected young patients. The complications were dominated by parietal suppurations. The mortality rate was high. 展开更多
关键词 Acute generalized Peritonitis BRAZZAVILLE ETIOLOGIES Intensive Care unit ISSUES
下载PDF
上一页 1 2 236 下一页 到第
使用帮助 返回顶部