To investigate the effect of deep foundation pit excavation on the stability of retaining structure, a subway stationin the city of Jinan was selected as a project, and a FLAC3D-based three dimensional model was devel...To investigate the effect of deep foundation pit excavation on the stability of retaining structure, a subway stationin the city of Jinan was selected as a project, and a FLAC3D-based three dimensional model was developed fornumerical simulation. The horizontal displacement of the retaining structure, the axial force of the support, andthe vertical displacement of the column were studied and compared to the collected data from the field. The findingsindicate that when the foundation pit is excavated, the maximum deformation of the retaining structure progressivelydecreases from the top, the distortion of the retaining structure gradually rises, and the final maximumdeformation is around 17 meters deep. In each layer of support, the largest axial force support is located in thefirst reinforced concrete support;the uplift of the pit bottom caused by soil unloading plays a primary role in thevertical displacement of the column, and the column exhibits an upward trend under all construction conditions.When compared to the measured data, the generated findings are comparable and the fluctuation trend is extremelyconsistent. The findings of this article may give technical direction for the development of subway stationswith a comparable engineering basis.展开更多
Taking the deep foundation pit accident occurring at a station of metro Line 2 in Taiyuan as an example,the influence of the seepage and inrush of the foundation pit on the retaining structure and surrounding environm...Taking the deep foundation pit accident occurring at a station of metro Line 2 in Taiyuan as an example,the influence of the seepage and inrush of the foundation pit on the retaining structure and surrounding environment were studied under the geological conditions of the confined aquifer on the east coast of Fenhe River.The causes of deep foundation pit accident were also analyzed systematically based on the monitoring data,and various emergency measures were proposed to control the occurrence of secondary accident for deep foundation pit.The results showed that the occurrence of inrush for foundation pit was mainly caused by the insufficient dewatering.The development of the accident was effectively controlled by the adding of the dewatering wells,local grouting of retaining structure to stop seepage,surface grouting to reinforcement and uplift soil.The successful experience can provide some guidance to the construction of similar projects in the proposal.展开更多
The excavation of a foundation pit considerably affects the adjacent structures and underground pipelines owing to the change in the stress state of the surrounding soil,resulting in deformation.The study of an actual...The excavation of a foundation pit considerably affects the adjacent structures and underground pipelines owing to the change in the stress state of the surrounding soil,resulting in deformation.The study of an actual engineering case was conducted to examine the influence of excavation on the deformation of adjacent subway tunnels.The finite element analysis software PLAXIS 3D was used to simulate the entire excavation process.The structural design of the foundation pit was optimized based on the simulation results to ensure the stability of the foundation pit and the safety of the existing subway tunnel structure.Finally,the safety evaluation of the excavation of the foundation pit that caused the deformation of the adjacent subway tunnel was performed.The influence of the excavation and unloading of the foundation pit on the subway tunnel is closely related to the distance between the subway and the foundation pit,the amount of earthwork excavated at one time,and the engineering geological conditions.The results of this paper can provide useful reference for the design optimization and safety assessment of similar projects.展开更多
基金supported by the National Natural Science Foundation of China(51774199).
文摘To investigate the effect of deep foundation pit excavation on the stability of retaining structure, a subway stationin the city of Jinan was selected as a project, and a FLAC3D-based three dimensional model was developed fornumerical simulation. The horizontal displacement of the retaining structure, the axial force of the support, andthe vertical displacement of the column were studied and compared to the collected data from the field. The findingsindicate that when the foundation pit is excavated, the maximum deformation of the retaining structure progressivelydecreases from the top, the distortion of the retaining structure gradually rises, and the final maximumdeformation is around 17 meters deep. In each layer of support, the largest axial force support is located in thefirst reinforced concrete support;the uplift of the pit bottom caused by soil unloading plays a primary role in thevertical displacement of the column, and the column exhibits an upward trend under all construction conditions.When compared to the measured data, the generated findings are comparable and the fluctuation trend is extremelyconsistent. The findings of this article may give technical direction for the development of subway stationswith a comparable engineering basis.
基金National Natural Science Foundation of China(No.51908516)Natural Science Foundation of Shanxi Province,China(No.201901D211207)。
文摘Taking the deep foundation pit accident occurring at a station of metro Line 2 in Taiyuan as an example,the influence of the seepage and inrush of the foundation pit on the retaining structure and surrounding environment were studied under the geological conditions of the confined aquifer on the east coast of Fenhe River.The causes of deep foundation pit accident were also analyzed systematically based on the monitoring data,and various emergency measures were proposed to control the occurrence of secondary accident for deep foundation pit.The results showed that the occurrence of inrush for foundation pit was mainly caused by the insufficient dewatering.The development of the accident was effectively controlled by the adding of the dewatering wells,local grouting of retaining structure to stop seepage,surface grouting to reinforcement and uplift soil.The successful experience can provide some guidance to the construction of similar projects in the proposal.
基金the National Natural Science Foundation Project of China(grant number:51768040 and 51508256).
文摘The excavation of a foundation pit considerably affects the adjacent structures and underground pipelines owing to the change in the stress state of the surrounding soil,resulting in deformation.The study of an actual engineering case was conducted to examine the influence of excavation on the deformation of adjacent subway tunnels.The finite element analysis software PLAXIS 3D was used to simulate the entire excavation process.The structural design of the foundation pit was optimized based on the simulation results to ensure the stability of the foundation pit and the safety of the existing subway tunnel structure.Finally,the safety evaluation of the excavation of the foundation pit that caused the deformation of the adjacent subway tunnel was performed.The influence of the excavation and unloading of the foundation pit on the subway tunnel is closely related to the distance between the subway and the foundation pit,the amount of earthwork excavated at one time,and the engineering geological conditions.The results of this paper can provide useful reference for the design optimization and safety assessment of similar projects.