As an independent sand control unit or a common protective shell of a high-quality screen,the punching screen is the outermost sand retaining unit of the sand control pipe which is used in geothermal well or oil and g...As an independent sand control unit or a common protective shell of a high-quality screen,the punching screen is the outermost sand retaining unit of the sand control pipe which is used in geothermal well or oil and gas well.However,most screens only consider the influence of the internal sand retaining medium parameters in the sand control performance design while ignoring the influence of the plugging of the punching screen on the overall sand retaining performance of the screen.To explore the clogging mechanism of the punching screen,this paper established the clogging mechanism calculation model of a single punching screen sand control unit by using the computational fluid mechanics-discrete element method(CFD-DEM)combined method.According to the combined motion of particles and fluids,the influence of the internal flow state on particle motion and accumulation was analyzed.The results showed that(1)the clogging process of the punching sand control unit is divided into three stages:initial clogging,aggravation of clogging and stability of clogging.In the initial stage of blockage,coarse particles form a loose bridge structure,and blockage often occurs preferentially at the streamline gathering place below chamfering inside the sand control unit.In the stage of blockage intensification,the particle mass develops into a relatively complete sand bridge,which develops from both ends of the opening to the center of the opening.In the stable plugging stage,the sand deposits show a“fan shape”and form a“V-shaped”gully inside the punching slot element.(2)Under a certain reservoir particle-size distribution,The slit length and opening height have a large influence on the permeability and blockage rate,while the slit width size has little influence on the permeability and blockage rate.The microscopic clogging mechanism and its law of the punching screen prevention unit are proposed in this study,which has some field guidance significance for the design of punching screen and sand prevention selection.展开更多
Based on the data of field outcrops,drilling cores,casting thin sections,well logging interpretation,oil/gas shows during drilling,and oil/gas testing results,and combined with modern salt-lake sediments in the Qingha...Based on the data of field outcrops,drilling cores,casting thin sections,well logging interpretation,oil/gas shows during drilling,and oil/gas testing results,and combined with modern salt-lake sediments in the Qinghai Lake,the Neogene saline lake beach-bars in southwestern Qaidam Basin are studied from the perspective of sedimentary characteristics,development patterns,sand control factors,and hydrocarbon accumulation characteristics.Beach-bar sand bodies are widely developed in the Neogene saline lake basin,and they are lithologically fine sandstone and siltstone,with wavy bedding,low-angle cross bedding,and lenticular-vein bedding.In view of spatial-temporal distribution,the beach-bar sand bodies are stacked in multiple stages vertically,migratory laterally,and extensive and continuous in NW-SE trending pattern in the plane.The stacking area of the Neogene beach-bar sandstone is predicted to be 3000 km^(2).The water salinity affects the sedimentation rate and offshore distance of beach-bar sandstone,and the debris input from the source area affects the scale and enrichment of beach-bar sandstone.The ancient landform controls the morphology and stacking style of beach-bar sandstone,and the northwest monsoon driving effect controls the long-axis extension direction of beach-bar sandstone.The beach-bars have a reservoir-forming feature of“one reservoir in one sand body”,with thick beach-bar sand bodies controlling the effective reservoir distribution and oil-source faults controlling the oil/gas migration and accumulation direction.Three favorable exploration target zones in Zhahaquan,Yingdong-eastern Wunan and Huatugou areas are proposed based on the analysis of reservoir-forming elements.展开更多
To meet the requirements of marine natural gas hydrate exploitation,it is necessary to improve the penetration of completion sand control string in the large curvature borehole.In this study,large curvature test wells...To meet the requirements of marine natural gas hydrate exploitation,it is necessary to improve the penetration of completion sand control string in the large curvature borehole.In this study,large curvature test wells were selected to carry out the running test of sand control string with pre-packed screen.Meanwhile,the running simulation was performed by using the Landmark software.The results show that the sand control packer and screen can be run smoothly in the wellbore with a dogleg angle of more than 20°/30 m and keep the structure stable.Additionally,the comprehensive friction coefficient is 0.4,under which and the simulation shows that the sand control string for hydrate exploitation can be run smoothly.These findings have important guiding significance for running the completion sand control string in natural gas hydrate exploitation.展开更多
The Golmud-Korla Railway in the Gobi area faces operational challenges due to sand hazards,caused by strong and variable winds.This study addresses these challenges by conducting wind tunnel tests to evaluate the prot...The Golmud-Korla Railway in the Gobi area faces operational challenges due to sand hazards,caused by strong and variable winds.This study addresses these challenges by conducting wind tunnel tests to evaluate the protective benefits of High Density Polyethylene(HDPE)board sand fences,focusing on their orientation relative to various wind directions(referred to as'wind angle').This study found that the size of the low-velocity zone on the leeward side of the sand fences(LSF)expanded with an increase in the wind angle(WA).At 1H(the height of the sand fence)and 2H positions on the LSF,the wind speed profiles(WSP)exhibited a segmented logarithmic growth,constrained by Z=H at varying WAs.The efficacy of the sand fence in obstructing airflow escalated as WA increased.The size of the WA has a significant impact on the protective efficiency of HDPE board sand fences.Furthermore,compared to typical sandy surfaces,the rate of sand transport across the Gobi surface diminishes more slowly with height,attributed to the gravel's rebound effect.This phenomenon allows some sand particles to bypass the fences,rendering them less effective at blocking wind and trapping sand than in sandy environments.This paper offers scientific evidence supporting the practical use and enhancement of HDPE board sand fences in varied wind conditions.展开更多
Desertification is one of the most serious environmental problems in the world,especially in the arid desert regions.Combating desertification,therefore,is an urgent task on a regional or even global scale.The Taklima...Desertification is one of the most serious environmental problems in the world,especially in the arid desert regions.Combating desertification,therefore,is an urgent task on a regional or even global scale.The Taklimakan Desert in China is the second largest mobile desert in the world and has been called the''Dead Sea''due to few organisms can exist in such a harsh environment.The Taklimakan Desert Highway,the longest desert highway(a total length of 446 km)across the mobile desert in the world,was built in the 1990s within the Taklimakan Desert.It has an important strategic significance regarding oil and gas resources exploration and plays a vital role in the socio-economic development of southern Xinjiang,China.However,wind-blow sand seriously damages the smoothness of the desert highway and,in this case,mechanical sand control system(including sand barrier fences and straw checkerboards)was used early in the life of the desert highway to protect the road.Unfortunately,more than 70%of the sand barrier fences and straw checkerboards have lost their functions,and the desert highway has often been buried and frequently blocked since 1999.To solve this problem,a long artificial shelterbelt with the length of 437 km was built along the desert highway since 2000.However,some potential problems still exist for the sustainable development of the desert highway,such as water shortage,strong sandstorms,extreme environmental characteristics and large maintenance costs.The study aims to provide an overview of the damages caused by wind-blown sand and the effects of sand control measures along the Taklimakan Desert Highway.Ultimately,we provide some suggestions for the biological sand control system to ensure the sustainable development of the Taklimakan Desert Highway,such as screening drought-resistant species to reduce the irrigation requirement and ensure the sound development of groundwater,screening halophytes to restore vegetation in the case of soil salinization,and planting cash crops,such as Cistanche,Wolfberry,Apocynum and other cash crops to decrease the high cost of maintenance on highways and shelterbelts.展开更多
Re puted as a wonderful achievement of the world's highway construction h istory, the Taklimakan Desert highway is now facing serious sand drift encroachment problems due to its 447-km-long passage of sand sea con...Re puted as a wonderful achievement of the world's highway construction h istory, the Taklimakan Desert highway is now facing serious sand drift encroachment problems due to its 447-km-long passage of sand sea consist ing of crescent dunes, barchan chains, compound transverse dune ridges and co mplex megadunes. To solve some technical problems in the protection of the highway from sand drift encroachment, desert experts have been conductin g the theoretical and applied studies on sand movement laws; causes, severities and time-space differentiation of sand drift damages; and control ways in cluding mechanical, chemical and biological measures. In this paper the authors give an overall summary on the research contents and recent progress i n the control of sand drift damages in China and hold that the theoretica l research results and practices in the prevention of sand drift encr oachment on the cross-desert highway represent a breakthrough and has an epoch-making significance. Since the construction of protective forest along the cross-desert highway requires large amount of ground water, what will be its environmental consequence and whether it can effectiv ely halt sand drift encroachment on the highway forever are the questions to be studied urgently.展开更多
Sand production is a crucial problem during the process of extracting natural gas from hydrate reservoirs. To deal with sand-production problems systematically, a sand-production control system (SCS) is first proposed...Sand production is a crucial problem during the process of extracting natural gas from hydrate reservoirs. To deal with sand-production problems systematically, a sand-production control system (SCS) is first proposed in this paper, specialized for pore-distributed clayey silt hydrate reservoirs. Secondly, a nodal system analysis method (NSAM) is applied to analyze the sand migration process during hydrate exploitation. The SCS is divided into three sub-systems, according to different sand migration mechanisms, and three key scientific problems and advances in SCS research in China Geological Survey are reviewed and analyzed. The maximum formation sanding rate, proper sand-control gravel size, and borehole blockage risk position were provided for clayey hydrate exploitation wells based on the SCS analysis. The SCS sub-systems are closely connected via bilateral coupling, and coordination of the subsystems is the basis of maintaining formation stability and prolonging the gas production cycle. Therefore, contradictory mitigation measures between sand production and operational systems should be considered preferentially. Some novel and efficient hydrate exploitation methods are needed to completely solve the contradictions caused by sand production.展开更多
Serious desertification caused by human activity and climate change,in addition to water loss and soil erosion related to arsenic sandstone in the Mu Us Sandy Land,lead to severe scarcity of soil and water resources,w...Serious desertification caused by human activity and climate change,in addition to water loss and soil erosion related to arsenic sandstone in the Mu Us Sandy Land,lead to severe scarcity of soil and water resources,which causes worse local agricultural conditions accordingly.Many physical properties of arsenic sandstone is complementary with that of sand,arsenic sandstone is therefore supposed to be blended to enhance water productivity and arability of sandy land.Container experiments are carried out to study the enhancement of water holding capacity of the mixture,the blending ratio of arsenic sandstone and sand,and the proper size of the arsenic sandstone particles,respectively.The results of the experiments show that particle size of 4 cm with a ratio of 1∶2 between arsenic sandstone and sand are the proper parameters on blending.Both water content and fertility increase after blending.Water use efficiency in the mixture is 2.7 times higher than that in sand by the water release curves from experiments.Therefore,a new sand control and development model,including arsenic sandstone blending with sand,efficient water irrigation management and reasonable farming system,is put forward to control and develop sandy land so that water-saving agriculture could be developed.Demonstration of potato planting about 153.1 ha in area in the Mu Us Sandy Land in China indicates that water consumption is 3018 m3/ha in the whole growth period.It means that about 61%of irrigation water can be saved compared with water use in coarse sand without treatment.Recycle economic mode and positive feedback of sand resource-crop planting-soil resource are constructed,which changes sand into arable soil and make it possible to develop water-saving agriculture on it.The proposed model will be helpful for soil-water resources utilization and management in the Mu Us Sandy Land.展开更多
Sand production is one of the major problems in sandstone reservoirs. Different mechanical and chemical methods have been proposed to control sand production. In this paper, we propose a chemical method based on using...Sand production is one of the major problems in sandstone reservoirs. Different mechanical and chemical methods have been proposed to control sand production. In this paper, we propose a chemical method based on using polyacrylamide/chromium triacetate hydrogel to investigate sand production in a synthetic sandpack system. To this end, a series of bulk experiments including the bottle test and rheological analysis along with compression tests were conducted. Experimental results indicated that the compressive strength of the sandpack was increased as much as 30 times by injecting 0.5 pore volume of hydrogel. Also, it was found that the increases in cross-linker and polymer concentrations exhibited a positive impact on the compressive strength of the sandpack, mostly by cross-linker concentration(48 psi). Hydrogel with a higher value of cross-linker could retain its viscoelastic properties against the strain which was a maximum of 122% for 0.5 weight ratio of cross-linker/polymer. The presence of salts, in particular divalent cations, has a detrimental effect on the hydrogel stability. The maximum strain value applied on hydrogel in the presence of CaCl_2 was only about 201% as compared to 1010% in the presence of distilled water. Finally, thermogravimetric analysis and its derivative showed that the hydrogel could retain its structure up to 300 °C. The results of this study revealed the potential application of the hydrogel to control sand production.展开更多
Launched in 2002, the Beiing–Tianjin Sand Source Control Project (BTSSCP) is an ecological restoration project intended to prevent desertification in China. Evidence from multiple sources has confirmed increases in v...Launched in 2002, the Beiing–Tianjin Sand Source Control Project (BTSSCP) is an ecological restoration project intended to prevent desertification in China. Evidence from multiple sources has confirmed increases in vegetation growth in the BTSSCP region since the initiation of this project. Precipitation and essential climate variable-soil moisture (ECV-SM) conditions are typically considered to be the main drivers of vegetation growth in this region. Although many studies have investigated the inter-annual variations of vegetation growth, few concerns have been focused on the annual and seasonal variations of vegetation growth and their climatic drivers, which are crucial for understanding the relationships among the climate, vegetation, and human activities at the regional scale. Based on the normalized difference vegetation index (NDVI) derived from MODIS and the corresponding climatic data, we explored the responses of vegetation growth to climatic factors at annual and seasonal scales in the BTSSCP region during the period 2000–2014. Over the study region as a whole, NDVI generally increased from 2000 to 2014, at a rate of 0.002/a. Vegetation growth is stimulated mainly by the elevated temperature in spring, whereas precipitation is the leading driver of summer greening. In autumn, positive effects of both temperature and precipitation on vegetation growth were observed. The warming in spring promotes vegetation growth but reduces ECV-SM. Summer greening has a strong cooling effect on land surface temperature. These results indicate that the ecological and environmental consequences of ecological restoration projects should be comprehensively evaluated.展开更多
Straw checkerboard sand barriers with a porous structure that consists of a pervious upper portion and a dense lower portion are widely used to achieve great sand control effect.Considering this,and resolving the seri...Straw checkerboard sand barriers with a porous structure that consists of a pervious upper portion and a dense lower portion are widely used to achieve great sand control effect.Considering this,and resolving the serious earth surface undercutting problem after HDPE sandbreak net checkboard barriers setting,the authors used HDPE(high-density polyethylene)materials to prepare new sandbreak materials with a similar porous structure.Through wind tunnel simulations and field sand control monitoring,we compared the sand control effect of three HDPE sandbreak nets with different porosity structure.Compared to the sandbreak net with uniform porosity structure,the three types of HDPE sandbreak nets with different porosity structure had poorer effect on reducing sand transport rates,but had longer effective protection distance before sandbreak nets at low wind velocity conditions(<12 m/s),longer effective protection distance at high wind velocity(>14 m/s)and longer effective protection distance between sandbreak nets at all experimental wind velocity conditions.Wind and sand control effect characteristics of HDPE sandbreak nets with different porosity structure provide an ideal material on semiburied checkerboard sand barriers for sand stabilization.By contrast,uniform-type sandbreak nets are used as materials on high upright sand fences for sand blocking.These HDPE sandbreak nets can be used to replace traditional sandbreak materials and have a very high potential for widespread and popular application in aeolian sand disaster control.展开更多
Although scientists have performed many studies in the Taklimakan Desert, few of them have reported the blown sand motion along the southern edge of the Taklimakan Desert Highway, which differs significantly from the ...Although scientists have performed many studies in the Taklimakan Desert, few of them have reported the blown sand motion along the southern edge of the Taklimakan Desert Highway, which differs significantly from the northern region in terms of aeolian sand geomorphology and formation environment. Based on the field ob- servation data of airflow and aeolian sand transport, continuous monitoring data of erosional and depositional processes between 14 April 2009 and 9 April 2011 and data of surface sand grains from the classical section along the southern edge of the Taklimakan Desert Highway, this paper reported the blown sand motion within the sand-control system of the highway. The main results are as follows: 1) The existing sand-control system is highly effective in preventing and controlling desertification. Wind velocities within the sand-control system were ap- proximately 33%-100% of those for the same height above the mobile sand surface. Aeolian sand fluxes were approximately 0-31.21% of those of the mobile sand surface. Sand grains inside the system, with a mean diameter of 2.89 q), were finer than those (2.15 q)) outside the system. In addition, wind velocities basically followed a loga- rithmic law, but the airflow along the classical section was mainly determined by topography and vegetation. 2) There were obvious erosional and depositional phenomena above the surface within the sand-control system, and these phenomena have very consistent patterns for all observation points in the two observed years. The total thicknesses of erosion and deposition ranged from 0.30 to 14.60 cm, with a mean value of 3.67 cm. In contrast, the deposition thicknesses were 1.90-22.10 cm, with a mean value of 7.59 cm, and the erosion thicknesses were 3.51-15.10 cm, with a mean value of 8.75 cm. The results will aid our understanding of blown sand within the sand-control system and provide a strong foundation for optimizing the sand-control system.展开更多
As the longest desert highway in China. the 447-kin-long Taklimakan Desert Highway which goes across the Taklimakan Desert was fully opened to traffic in 1996~[1]. The sand-controlling system along the Desert Highway ...As the longest desert highway in China. the 447-kin-long Taklimakan Desert Highway which goes across the Taklimakan Desert was fully opened to traffic in 1996~[1]. The sand-controlling system along the Desert Highway enables the Highway itself to operate properly and creates enormous socio-economic benefits. However, due to delivery time pressure, the sand-controlling system was built in a haste. Lack of studies on sand-controlling system brought deficiencies on design and construction of the sand-controlling system. And with the lapse of time, troubles such as sand deposition on the roadbeds and erosion on roadsides came to surface and caused more serious problems for the traffic routes[1.2]. This paper discusses two forms of the sand-controlling system-the upright fence and the send-covered sand barrier, then analyzes the general benefits of the sandcontrolling system along the Desert Highway.展开更多
Soil water content is a key controlling factor for vegetation restoration in sand dunes.The deep seepage and lateral migration of water in dunes affect the recharge process of deep soil water and groundwater in sand d...Soil water content is a key controlling factor for vegetation restoration in sand dunes.The deep seepage and lateral migration of water in dunes affect the recharge process of deep soil water and groundwater in sand dune ecosystems.To determine the influence of vegetation on the hydrological regulation function of sand dunes,we examined the deep seepage and lateral migration of dune water with different vegetation coverages during the growing season in the Horqin Sandy Land,China.The results showed that the deep seepage and lateral migration of water decreased with the increase in vegetation coverage on the dunes.The accumulated deep seepage water of mobile dunes(vegetation coverage<5%)and dunes with vegetation coverage of 18.03%,27.12%,and 50.65%accounted for 56.53%,51.82%,18.98%,and 0.26%,respectively,of the rainfall in the same period.The accumulated lateral migration of water in these dunes accounted for 12.39%,6.33%,2.23%,and 7.61%of the rainfall in the same period.The direction and position of the dune slope affected the soil water deep seepage and lateral migration process.The amounts of deep seepage and lateral migration of water on the windward slope were lower than those on the leeward slope.The amounts of deep seepage and lateral migration of water showed a decreasing trend from the bottom to the middle and to the top of the dune slope.According to the above results,during the construction of sand-control projects in sandy regions,we suggest that a certain area of mobile dunes(>13.75%)should be retained as a water resource reservoir to maintain the water balance of artificial fixed dune ecosystems.These findings provide reliable evidence for the accurate assessment of water resources within the sand dune ecosystem and guide the construction of desertification control projects.展开更多
Green sand casting is still a main method in the world at present and it isvery significant to develop the technology of controlling green sand quality. A new concept, fromcontents test to contents control, is advance...Green sand casting is still a main method in the world at present and it isvery significant to develop the technology of controlling green sand quality. A new concept, fromcontents test to contents control, is advanced. In order to realize the new idea, a new method toon-line test active clay and moisture of green sand - double powers energizing alternately (DPEA)method is put forwards. The principle of the new method is to energize standard sand sample with ACand DC powers and to test the electric parameters, and then, to calculate active clay and moistureof green sand by using artificial neural network (ANN). Based on this new method, a directoptimizing system for controlling green sand quality is developed. Techniques about testing andcontrolling methods, hardware and software are discussed.展开更多
In oil drilling processes,sand production in the oil layer is a common issue,generally mitigated by means of sand control screens.To prevent or reduce the risk of damage of these screens and to improve the related ser...In oil drilling processes,sand production in the oil layer is a common issue,generally mitigated by means of sand control screens.To prevent or reduce the risk of damage of these screens and to improve the related service life,it is necessary to investigate the related erosion dynamics.In this study,a screen mesh model based on the flow field similarity theory is proposed to overcome the otherwise too complex geometric structure of this type of equipment.Such model is optimized using experimental data.The predicted results are in good agreement with the measured values,and the error is less than 15%.The results also show that the simplified geometric screen model and the optimized Zhang et al.erosion model have high reliability;therefore,they could effective be used to select underground screen meshes and improve the design of production process.展开更多
Reservoir safety, testing-string safety, and flow control are key factors that should be considered in deep-water unconsolidated sandstone gas well testing work system. Combined with the feature of testing reservoir, ...Reservoir safety, testing-string safety, and flow control are key factors that should be considered in deep-water unconsolidated sandstone gas well testing work system. Combined with the feature of testing reservoir, pipe string type and sea area, the required minimum testing flow rate during cleaning up process, as well as minimum test flow rate without hydrate generation, pipe string erosion critical production, the maximum testing flow rate without destroying sand formation and the minimum output of meeting the demand of development was analyzed;based on the above critical test flow rates, testing working system is designed. Field application showed that the designed work system effectively provided good guidance for field test operations;no sand production or hydrate generation happened during the test process;the test parameter evaluated the reservoir accurately;the safe and efficient test operation was achieved.展开更多
文摘As an independent sand control unit or a common protective shell of a high-quality screen,the punching screen is the outermost sand retaining unit of the sand control pipe which is used in geothermal well or oil and gas well.However,most screens only consider the influence of the internal sand retaining medium parameters in the sand control performance design while ignoring the influence of the plugging of the punching screen on the overall sand retaining performance of the screen.To explore the clogging mechanism of the punching screen,this paper established the clogging mechanism calculation model of a single punching screen sand control unit by using the computational fluid mechanics-discrete element method(CFD-DEM)combined method.According to the combined motion of particles and fluids,the influence of the internal flow state on particle motion and accumulation was analyzed.The results showed that(1)the clogging process of the punching sand control unit is divided into three stages:initial clogging,aggravation of clogging and stability of clogging.In the initial stage of blockage,coarse particles form a loose bridge structure,and blockage often occurs preferentially at the streamline gathering place below chamfering inside the sand control unit.In the stage of blockage intensification,the particle mass develops into a relatively complete sand bridge,which develops from both ends of the opening to the center of the opening.In the stable plugging stage,the sand deposits show a“fan shape”and form a“V-shaped”gully inside the punching slot element.(2)Under a certain reservoir particle-size distribution,The slit length and opening height have a large influence on the permeability and blockage rate,while the slit width size has little influence on the permeability and blockage rate.The microscopic clogging mechanism and its law of the punching screen prevention unit are proposed in this study,which has some field guidance significance for the design of punching screen and sand prevention selection.
基金Supported by the PetroChina Science and Technology Project (2021DJ0402,2021DJ0202)。
文摘Based on the data of field outcrops,drilling cores,casting thin sections,well logging interpretation,oil/gas shows during drilling,and oil/gas testing results,and combined with modern salt-lake sediments in the Qinghai Lake,the Neogene saline lake beach-bars in southwestern Qaidam Basin are studied from the perspective of sedimentary characteristics,development patterns,sand control factors,and hydrocarbon accumulation characteristics.Beach-bar sand bodies are widely developed in the Neogene saline lake basin,and they are lithologically fine sandstone and siltstone,with wavy bedding,low-angle cross bedding,and lenticular-vein bedding.In view of spatial-temporal distribution,the beach-bar sand bodies are stacked in multiple stages vertically,migratory laterally,and extensive and continuous in NW-SE trending pattern in the plane.The stacking area of the Neogene beach-bar sandstone is predicted to be 3000 km^(2).The water salinity affects the sedimentation rate and offshore distance of beach-bar sandstone,and the debris input from the source area affects the scale and enrichment of beach-bar sandstone.The ancient landform controls the morphology and stacking style of beach-bar sandstone,and the northwest monsoon driving effect controls the long-axis extension direction of beach-bar sandstone.The beach-bars have a reservoir-forming feature of“one reservoir in one sand body”,with thick beach-bar sand bodies controlling the effective reservoir distribution and oil-source faults controlling the oil/gas migration and accumulation direction.Three favorable exploration target zones in Zhahaquan,Yingdong-eastern Wunan and Huatugou areas are proposed based on the analysis of reservoir-forming elements.
基金supported jointly by one of the major projects of Basic and Applied Basic Research in Guangdong Province“Key Basic Theory Research for Natural Gas Hydrate Trial Production in Shenhu Pilot Test Area”(2020B0301030003)the project from Southern Marine Science&Engineering Guangdong Laboratory Guangzhou City“Research on New Closed Circulation Drilling Technology without Riser”(GML2019ZD0501)the special project for hydrate from China Geological Survey“Trial Production Implementation for Natural Gas Hydrate in Shenhu Pilot Test Area”(DD20190226)。
文摘To meet the requirements of marine natural gas hydrate exploitation,it is necessary to improve the penetration of completion sand control string in the large curvature borehole.In this study,large curvature test wells were selected to carry out the running test of sand control string with pre-packed screen.Meanwhile,the running simulation was performed by using the Landmark software.The results show that the sand control packer and screen can be run smoothly in the wellbore with a dogleg angle of more than 20°/30 m and keep the structure stable.Additionally,the comprehensive friction coefficient is 0.4,under which and the simulation shows that the sand control string for hydrate exploitation can be run smoothly.These findings have important guiding significance for running the completion sand control string in natural gas hydrate exploitation.
基金financially supported by the National Natural Science Foundation of China(42461011,42071014),and the Fellowship of the China Postdoctoral Science Foundation(2021M703466).
文摘The Golmud-Korla Railway in the Gobi area faces operational challenges due to sand hazards,caused by strong and variable winds.This study addresses these challenges by conducting wind tunnel tests to evaluate the protective benefits of High Density Polyethylene(HDPE)board sand fences,focusing on their orientation relative to various wind directions(referred to as'wind angle').This study found that the size of the low-velocity zone on the leeward side of the sand fences(LSF)expanded with an increase in the wind angle(WA).At 1H(the height of the sand fence)and 2H positions on the LSF,the wind speed profiles(WSP)exhibited a segmented logarithmic growth,constrained by Z=H at varying WAs.The efficacy of the sand fence in obstructing airflow escalated as WA increased.The size of the WA has a significant impact on the protective efficiency of HDPE board sand fences.Furthermore,compared to typical sandy surfaces,the rate of sand transport across the Gobi surface diminishes more slowly with height,attributed to the gravel's rebound effect.This phenomenon allows some sand particles to bypass the fences,rendering them less effective at blocking wind and trapping sand than in sandy environments.This paper offers scientific evidence supporting the practical use and enhancement of HDPE board sand fences in varied wind conditions.
基金This work was supported by the National Natural Science Foundation of China(31971731,41771121)the Xinjiang National Key Research and Development Program(2019B00005)+1 种基金the National Key Research and Development Program(2017YFC0506705)the Youth Innovation Promotion Association of Chinese Academy of Sciences(2017476).
文摘Desertification is one of the most serious environmental problems in the world,especially in the arid desert regions.Combating desertification,therefore,is an urgent task on a regional or even global scale.The Taklimakan Desert in China is the second largest mobile desert in the world and has been called the''Dead Sea''due to few organisms can exist in such a harsh environment.The Taklimakan Desert Highway,the longest desert highway(a total length of 446 km)across the mobile desert in the world,was built in the 1990s within the Taklimakan Desert.It has an important strategic significance regarding oil and gas resources exploration and plays a vital role in the socio-economic development of southern Xinjiang,China.However,wind-blow sand seriously damages the smoothness of the desert highway and,in this case,mechanical sand control system(including sand barrier fences and straw checkerboards)was used early in the life of the desert highway to protect the road.Unfortunately,more than 70%of the sand barrier fences and straw checkerboards have lost their functions,and the desert highway has often been buried and frequently blocked since 1999.To solve this problem,a long artificial shelterbelt with the length of 437 km was built along the desert highway since 2000.However,some potential problems still exist for the sustainable development of the desert highway,such as water shortage,strong sandstorms,extreme environmental characteristics and large maintenance costs.The study aims to provide an overview of the damages caused by wind-blown sand and the effects of sand control measures along the Taklimakan Desert Highway.Ultimately,we provide some suggestions for the biological sand control system to ensure the sustainable development of the Taklimakan Desert Highway,such as screening drought-resistant species to reduce the irrigation requirement and ensure the sound development of groundwater,screening halophytes to restore vegetation in the case of soil salinization,and planting cash crops,such as Cistanche,Wolfberry,Apocynum and other cash crops to decrease the high cost of maintenance on highways and shelterbelts.
基金The National Key Project for Basic Research, No.G2000048705 Knowledge Innovation Project of the Cold and Arid Regions Environmental and Engineering Research Institute, CAS, No.CACX210093
文摘Re puted as a wonderful achievement of the world's highway construction h istory, the Taklimakan Desert highway is now facing serious sand drift encroachment problems due to its 447-km-long passage of sand sea consist ing of crescent dunes, barchan chains, compound transverse dune ridges and co mplex megadunes. To solve some technical problems in the protection of the highway from sand drift encroachment, desert experts have been conductin g the theoretical and applied studies on sand movement laws; causes, severities and time-space differentiation of sand drift damages; and control ways in cluding mechanical, chemical and biological measures. In this paper the authors give an overall summary on the research contents and recent progress i n the control of sand drift damages in China and hold that the theoretica l research results and practices in the prevention of sand drift encr oachment on the cross-desert highway represent a breakthrough and has an epoch-making significance. Since the construction of protective forest along the cross-desert highway requires large amount of ground water, what will be its environmental consequence and whether it can effectiv ely halt sand drift encroachment on the highway forever are the questions to be studied urgently.
基金supported by the National Natural Science Foundation of China (41606078)National Key Research and Development Plan (2017YFC0307600)+1 种基金Qingdao National Laboratory for Marine Science and Technology (QNLM2016ORP0207,QNLM2016ORP0203)Marine Geological Survey Program (DD20190231,DD20190221).
文摘Sand production is a crucial problem during the process of extracting natural gas from hydrate reservoirs. To deal with sand-production problems systematically, a sand-production control system (SCS) is first proposed in this paper, specialized for pore-distributed clayey silt hydrate reservoirs. Secondly, a nodal system analysis method (NSAM) is applied to analyze the sand migration process during hydrate exploitation. The SCS is divided into three sub-systems, according to different sand migration mechanisms, and three key scientific problems and advances in SCS research in China Geological Survey are reviewed and analyzed. The maximum formation sanding rate, proper sand-control gravel size, and borehole blockage risk position were provided for clayey hydrate exploitation wells based on the SCS analysis. The SCS sub-systems are closely connected via bilateral coupling, and coordination of the subsystems is the basis of maintaining formation stability and prolonging the gas production cycle. Therefore, contradictory mitigation measures between sand production and operational systems should be considered preferentially. Some novel and efficient hydrate exploitation methods are needed to completely solve the contradictions caused by sand production.
基金Under the auspices of National Natural Science Foundation of China(No.51079120)Education Department Research Program of Shaanxi Province(No.12JK0481)Water Conservancy Science and Technology Plan of Shaanxi Province(No.2012-07)
文摘Serious desertification caused by human activity and climate change,in addition to water loss and soil erosion related to arsenic sandstone in the Mu Us Sandy Land,lead to severe scarcity of soil and water resources,which causes worse local agricultural conditions accordingly.Many physical properties of arsenic sandstone is complementary with that of sand,arsenic sandstone is therefore supposed to be blended to enhance water productivity and arability of sandy land.Container experiments are carried out to study the enhancement of water holding capacity of the mixture,the blending ratio of arsenic sandstone and sand,and the proper size of the arsenic sandstone particles,respectively.The results of the experiments show that particle size of 4 cm with a ratio of 1∶2 between arsenic sandstone and sand are the proper parameters on blending.Both water content and fertility increase after blending.Water use efficiency in the mixture is 2.7 times higher than that in sand by the water release curves from experiments.Therefore,a new sand control and development model,including arsenic sandstone blending with sand,efficient water irrigation management and reasonable farming system,is put forward to control and develop sandy land so that water-saving agriculture could be developed.Demonstration of potato planting about 153.1 ha in area in the Mu Us Sandy Land in China indicates that water consumption is 3018 m3/ha in the whole growth period.It means that about 61%of irrigation water can be saved compared with water use in coarse sand without treatment.Recycle economic mode and positive feedback of sand resource-crop planting-soil resource are constructed,which changes sand into arable soil and make it possible to develop water-saving agriculture on it.The proposed model will be helpful for soil-water resources utilization and management in the Mu Us Sandy Land.
基金support of the Iran National Science Foundation(INSF)with Project No.of 95849122
文摘Sand production is one of the major problems in sandstone reservoirs. Different mechanical and chemical methods have been proposed to control sand production. In this paper, we propose a chemical method based on using polyacrylamide/chromium triacetate hydrogel to investigate sand production in a synthetic sandpack system. To this end, a series of bulk experiments including the bottle test and rheological analysis along with compression tests were conducted. Experimental results indicated that the compressive strength of the sandpack was increased as much as 30 times by injecting 0.5 pore volume of hydrogel. Also, it was found that the increases in cross-linker and polymer concentrations exhibited a positive impact on the compressive strength of the sandpack, mostly by cross-linker concentration(48 psi). Hydrogel with a higher value of cross-linker could retain its viscoelastic properties against the strain which was a maximum of 122% for 0.5 weight ratio of cross-linker/polymer. The presence of salts, in particular divalent cations, has a detrimental effect on the hydrogel stability. The maximum strain value applied on hydrogel in the presence of CaCl_2 was only about 201% as compared to 1010% in the presence of distilled water. Finally, thermogravimetric analysis and its derivative showed that the hydrogel could retain its structure up to 300 °C. The results of this study revealed the potential application of the hydrogel to control sand production.
基金financially supported by the National Natural Science Foundation of China (31560135, 41361100)the Discipline Construction Fund Project of Gansu Agricultural University (GAU-XKJS-2018-104, GAU-XKJS-2018-108)the Gansu Science and Technology Support Program (1604FKCA088)
文摘Launched in 2002, the Beiing–Tianjin Sand Source Control Project (BTSSCP) is an ecological restoration project intended to prevent desertification in China. Evidence from multiple sources has confirmed increases in vegetation growth in the BTSSCP region since the initiation of this project. Precipitation and essential climate variable-soil moisture (ECV-SM) conditions are typically considered to be the main drivers of vegetation growth in this region. Although many studies have investigated the inter-annual variations of vegetation growth, few concerns have been focused on the annual and seasonal variations of vegetation growth and their climatic drivers, which are crucial for understanding the relationships among the climate, vegetation, and human activities at the regional scale. Based on the normalized difference vegetation index (NDVI) derived from MODIS and the corresponding climatic data, we explored the responses of vegetation growth to climatic factors at annual and seasonal scales in the BTSSCP region during the period 2000–2014. Over the study region as a whole, NDVI generally increased from 2000 to 2014, at a rate of 0.002/a. Vegetation growth is stimulated mainly by the elevated temperature in spring, whereas precipitation is the leading driver of summer greening. In autumn, positive effects of both temperature and precipitation on vegetation growth were observed. The warming in spring promotes vegetation growth but reduces ECV-SM. Summer greening has a strong cooling effect on land surface temperature. These results indicate that the ecological and environmental consequences of ecological restoration projects should be comprehensively evaluated.
基金fund by Strategic Priority Research Program of the Chinese Academy of Sciences(XD23060201)the National Natural Science Foundation of China(41730644,42171016,)。
文摘Straw checkerboard sand barriers with a porous structure that consists of a pervious upper portion and a dense lower portion are widely used to achieve great sand control effect.Considering this,and resolving the serious earth surface undercutting problem after HDPE sandbreak net checkboard barriers setting,the authors used HDPE(high-density polyethylene)materials to prepare new sandbreak materials with a similar porous structure.Through wind tunnel simulations and field sand control monitoring,we compared the sand control effect of three HDPE sandbreak nets with different porosity structure.Compared to the sandbreak net with uniform porosity structure,the three types of HDPE sandbreak nets with different porosity structure had poorer effect on reducing sand transport rates,but had longer effective protection distance before sandbreak nets at low wind velocity conditions(<12 m/s),longer effective protection distance at high wind velocity(>14 m/s)and longer effective protection distance between sandbreak nets at all experimental wind velocity conditions.Wind and sand control effect characteristics of HDPE sandbreak nets with different porosity structure provide an ideal material on semiburied checkerboard sand barriers for sand stabilization.By contrast,uniform-type sandbreak nets are used as materials on high upright sand fences for sand blocking.These HDPE sandbreak nets can be used to replace traditional sandbreak materials and have a very high potential for widespread and popular application in aeolian sand disaster control.
基金supported by the National Natural Science Foundation of China (41271020, 41330746)CERS-China Equipment and Education Resources System (CERS-1-109)
文摘Although scientists have performed many studies in the Taklimakan Desert, few of them have reported the blown sand motion along the southern edge of the Taklimakan Desert Highway, which differs significantly from the northern region in terms of aeolian sand geomorphology and formation environment. Based on the field ob- servation data of airflow and aeolian sand transport, continuous monitoring data of erosional and depositional processes between 14 April 2009 and 9 April 2011 and data of surface sand grains from the classical section along the southern edge of the Taklimakan Desert Highway, this paper reported the blown sand motion within the sand-control system of the highway. The main results are as follows: 1) The existing sand-control system is highly effective in preventing and controlling desertification. Wind velocities within the sand-control system were ap- proximately 33%-100% of those for the same height above the mobile sand surface. Aeolian sand fluxes were approximately 0-31.21% of those of the mobile sand surface. Sand grains inside the system, with a mean diameter of 2.89 q), were finer than those (2.15 q)) outside the system. In addition, wind velocities basically followed a loga- rithmic law, but the airflow along the classical section was mainly determined by topography and vegetation. 2) There were obvious erosional and depositional phenomena above the surface within the sand-control system, and these phenomena have very consistent patterns for all observation points in the two observed years. The total thicknesses of erosion and deposition ranged from 0.30 to 14.60 cm, with a mean value of 3.67 cm. In contrast, the deposition thicknesses were 1.90-22.10 cm, with a mean value of 7.59 cm, and the erosion thicknesses were 3.51-15.10 cm, with a mean value of 8.75 cm. The results will aid our understanding of blown sand within the sand-control system and provide a strong foundation for optimizing the sand-control system.
基金program introducting distinguished personnel from abroad/wind-blown sand physics project Chinese Academy of Sciences
文摘As the longest desert highway in China. the 447-kin-long Taklimakan Desert Highway which goes across the Taklimakan Desert was fully opened to traffic in 1996~[1]. The sand-controlling system along the Desert Highway enables the Highway itself to operate properly and creates enormous socio-economic benefits. However, due to delivery time pressure, the sand-controlling system was built in a haste. Lack of studies on sand-controlling system brought deficiencies on design and construction of the sand-controlling system. And with the lapse of time, troubles such as sand deposition on the roadbeds and erosion on roadsides came to surface and caused more serious problems for the traffic routes[1.2]. This paper discusses two forms of the sand-controlling system-the upright fence and the send-covered sand barrier, then analyzes the general benefits of the sandcontrolling system along the Desert Highway.
基金This study was funded by the National Natural Science Foundation of China(31670712)the Strategic Priority Research Program of Chinese Academy of Sciences(XDA26020104).
文摘Soil water content is a key controlling factor for vegetation restoration in sand dunes.The deep seepage and lateral migration of water in dunes affect the recharge process of deep soil water and groundwater in sand dune ecosystems.To determine the influence of vegetation on the hydrological regulation function of sand dunes,we examined the deep seepage and lateral migration of dune water with different vegetation coverages during the growing season in the Horqin Sandy Land,China.The results showed that the deep seepage and lateral migration of water decreased with the increase in vegetation coverage on the dunes.The accumulated deep seepage water of mobile dunes(vegetation coverage<5%)and dunes with vegetation coverage of 18.03%,27.12%,and 50.65%accounted for 56.53%,51.82%,18.98%,and 0.26%,respectively,of the rainfall in the same period.The accumulated lateral migration of water in these dunes accounted for 12.39%,6.33%,2.23%,and 7.61%of the rainfall in the same period.The direction and position of the dune slope affected the soil water deep seepage and lateral migration process.The amounts of deep seepage and lateral migration of water on the windward slope were lower than those on the leeward slope.The amounts of deep seepage and lateral migration of water showed a decreasing trend from the bottom to the middle and to the top of the dune slope.According to the above results,during the construction of sand-control projects in sandy regions,we suggest that a certain area of mobile dunes(>13.75%)should be retained as a water resource reservoir to maintain the water balance of artificial fixed dune ecosystems.These findings provide reliable evidence for the accurate assessment of water resources within the sand dune ecosystem and guide the construction of desertification control projects.
基金Provincial Outstanding Youth Foundation of Heilongjiang, China.
文摘Green sand casting is still a main method in the world at present and it isvery significant to develop the technology of controlling green sand quality. A new concept, fromcontents test to contents control, is advanced. In order to realize the new idea, a new method toon-line test active clay and moisture of green sand - double powers energizing alternately (DPEA)method is put forwards. The principle of the new method is to energize standard sand sample with ACand DC powers and to test the electric parameters, and then, to calculate active clay and moistureof green sand by using artificial neural network (ANN). Based on this new method, a directoptimizing system for controlling green sand quality is developed. Techniques about testing andcontrolling methods, hardware and software are discussed.
基金the Foundation of the National Natural Science Foundation of China(No.51974033)Educational Commission of Hubei Province of China(Q20191310,D20171305).
文摘In oil drilling processes,sand production in the oil layer is a common issue,generally mitigated by means of sand control screens.To prevent or reduce the risk of damage of these screens and to improve the related service life,it is necessary to investigate the related erosion dynamics.In this study,a screen mesh model based on the flow field similarity theory is proposed to overcome the otherwise too complex geometric structure of this type of equipment.Such model is optimized using experimental data.The predicted results are in good agreement with the measured values,and the error is less than 15%.The results also show that the simplified geometric screen model and the optimized Zhang et al.erosion model have high reliability;therefore,they could effective be used to select underground screen meshes and improve the design of production process.
文摘Reservoir safety, testing-string safety, and flow control are key factors that should be considered in deep-water unconsolidated sandstone gas well testing work system. Combined with the feature of testing reservoir, pipe string type and sea area, the required minimum testing flow rate during cleaning up process, as well as minimum test flow rate without hydrate generation, pipe string erosion critical production, the maximum testing flow rate without destroying sand formation and the minimum output of meeting the demand of development was analyzed;based on the above critical test flow rates, testing working system is designed. Field application showed that the designed work system effectively provided good guidance for field test operations;no sand production or hydrate generation happened during the test process;the test parameter evaluated the reservoir accurately;the safe and efficient test operation was achieved.