Taking 91105 working face as the research object, the observation method of water flowing fracture<span style="font-family:Verdana;">d</span><span style="font-family:Verdana;"> zo...Taking 91105 working face as the research object, the observation method of water flowing fracture<span style="font-family:Verdana;">d</span><span style="font-family:Verdana;"> zone and the layout of mining holes were determined by analyzing the field geological structure</span><span style="font-family:Verdana;">. </span><span style="font-family:Verdana;">It was shown that the fractured zone height and the ratio given by the measured method were 52.33 and 12.46, respectively. By the numerical simulation method with the software of UDEC, the fractured zone height and the ratio were 42.5 and 10.12. By comparison of measured height data and UDEC numerical simulation, there were some differences between the measured height and the calculated results of UDEC numerical simulation method. The method of simulation can be used as the technical basis for the design of waterproof coal pillar in the future.</span>展开更多
As mining depth becomes deeper and deeper,the possibility of undermining overburden aquifers is increasing.It is very important for coal miners to undertake studies on the height of fractured zone during longwall mini...As mining depth becomes deeper and deeper,the possibility of undermining overburden aquifers is increasing.It is very important for coal miners to undertake studies on the height of fractured zone during longwall mining and the effects of longwall mining on the underground water while mining under surface water bodies and underground aquifers.In order to study this problem,piezometers for monitoring underground water levels were installed above the longwall panels in an American coalmine.Large amounts of pre-mining,during mining and post-mining monitoring data were collected.Based on the data,the heights of fractured zones were obtained and the effects of longwall mining on the underground water were studied.The results demonstrate that when the piezometer monitoring wells had an interburden thickness of less than 72.7 m,the groundwater level decreased immediately to immeasurable levels and the wells went dry after undermining the face of longwall.The height of the fractured zone is 72.7-85.3 m in the geological and mining conditions.The results also show that the calculated values of fractured zones by the empirical formulae used in China are smaller than the actual results.Therefore,it is not always safe to use them for analyses while mining under water bodies.展开更多
Xin’an coal mine, Henan Province, faces the risk of water inrush because 40% of the area of the coal mine is under the surface water of the Xiaolangdi reservoir. To forecast water disaster, an effective aquifuge and ...Xin’an coal mine, Henan Province, faces the risk of water inrush because 40% of the area of the coal mine is under the surface water of the Xiaolangdi reservoir. To forecast water disaster, an effective aquifuge and a limit of water infiltration were determined by rock-phase analysis and long term observations of surface water and groundwater. By field monitoring, as well as physical and numerical simulation experiments, we obtained data reflecting different heights of a water flow fractured zone (WFFZ) under different mining conditions, derived a formula to calculate this height and built a forecasting model with the aid of GIS. On the basis of these activities, the coal mine area was classified into three sub-areas with different potential of water inrush. In the end, our research results have been applied in and verified by industrial mining experiments at three working faces and we were able to present a successful example of coal mining under a large reservoir.展开更多
In the mining process of coal mine,waterproof coal pillars should be set between the weathered oxidation zone and the first mining face.In order to determine the reasonable upper limit of the first mining face of Hong...In the mining process of coal mine,waterproof coal pillars should be set between the weathered oxidation zone and the first mining face.In order to determine the reasonable upper limit of the first mining face of Hongyi Coal Mine,the waterproof coal pillar needs to be wide enough to resist the lateral hydrostatic pressure of the oxidation zone,and to ensure that the top plate aquifer does not run through the water guide crack zone,while also liberating as much stagnant coal as possible.In this paper,the first coal mine face’s waterproof coal pillar was calculated using conventional and optimized calculation methods,taking into account the dip angle of the coal seam,the height of the water-guide crack zone,and the rock shift influence zone,and finally the upper limit of the first face of Hongyi Coal Mine was determined.展开更多
Analyzed the rule of the Water Flowing Fractured (WFF) zone's development during the fully mechanized top coal caving.Six influence factors of WFF's height were selected,viz.mining thickness,base rock thicknes...Analyzed the rule of the Water Flowing Fractured (WFF) zone's development during the fully mechanized top coal caving.Six influence factors of WFF's height were selected,viz.mining thickness,base rock thickness,dip angle,uniaxial compressing strength of roof,mudstone proportion in overlying rock,and structure of overlying rock. The height-forecasting model of WFF was established based on the Artificial Neural Net-work techniques,and was applied in the first fully mechanized top coal caving face under sea in China.展开更多
文摘Taking 91105 working face as the research object, the observation method of water flowing fracture<span style="font-family:Verdana;">d</span><span style="font-family:Verdana;"> zone and the layout of mining holes were determined by analyzing the field geological structure</span><span style="font-family:Verdana;">. </span><span style="font-family:Verdana;">It was shown that the fractured zone height and the ratio given by the measured method were 52.33 and 12.46, respectively. By the numerical simulation method with the software of UDEC, the fractured zone height and the ratio were 42.5 and 10.12. By comparison of measured height data and UDEC numerical simulation, there were some differences between the measured height and the calculated results of UDEC numerical simulation method. The method of simulation can be used as the technical basis for the design of waterproof coal pillar in the future.</span>
基金sponsored by the National Natural Science Foundation of China (No.50974053)Pennsylvania Service Corporation at Waynesburg,USA
文摘As mining depth becomes deeper and deeper,the possibility of undermining overburden aquifers is increasing.It is very important for coal miners to undertake studies on the height of fractured zone during longwall mining and the effects of longwall mining on the underground water while mining under surface water bodies and underground aquifers.In order to study this problem,piezometers for monitoring underground water levels were installed above the longwall panels in an American coalmine.Large amounts of pre-mining,during mining and post-mining monitoring data were collected.Based on the data,the heights of fractured zones were obtained and the effects of longwall mining on the underground water were studied.The results demonstrate that when the piezometer monitoring wells had an interburden thickness of less than 72.7 m,the groundwater level decreased immediately to immeasurable levels and the wells went dry after undermining the face of longwall.The height of the fractured zone is 72.7-85.3 m in the geological and mining conditions.The results also show that the calculated values of fractured zones by the empirical formulae used in China are smaller than the actual results.Therefore,it is not always safe to use them for analyses while mining under water bodies.
基金Project 2007CB209400 supported by the National Basic Research Program of China
文摘Xin’an coal mine, Henan Province, faces the risk of water inrush because 40% of the area of the coal mine is under the surface water of the Xiaolangdi reservoir. To forecast water disaster, an effective aquifuge and a limit of water infiltration were determined by rock-phase analysis and long term observations of surface water and groundwater. By field monitoring, as well as physical and numerical simulation experiments, we obtained data reflecting different heights of a water flow fractured zone (WFFZ) under different mining conditions, derived a formula to calculate this height and built a forecasting model with the aid of GIS. On the basis of these activities, the coal mine area was classified into three sub-areas with different potential of water inrush. In the end, our research results have been applied in and verified by industrial mining experiments at three working faces and we were able to present a successful example of coal mining under a large reservoir.
基金the Open Fund of State Key Laboratory of Water Resource Protection and Utilization in Coal Mining(Grant No.GJNY-18-73.15)the National Natural Science Foundation of China(NSFC)under grant No.41602254+2 种基金the National Natural Science Foundation of China(NSFC)under grant No.41807221the Science and Technology Innovation Project of Northwest A&F University,the Double-Class Discipline Group Dry Area Hydrology and Water Resources Regulation Research funding project(Z102022011)the Special Funding Project for Basic Scientific Research Business Fees of Central Universities(2452016179).
文摘In the mining process of coal mine,waterproof coal pillars should be set between the weathered oxidation zone and the first mining face.In order to determine the reasonable upper limit of the first mining face of Hongyi Coal Mine,the waterproof coal pillar needs to be wide enough to resist the lateral hydrostatic pressure of the oxidation zone,and to ensure that the top plate aquifer does not run through the water guide crack zone,while also liberating as much stagnant coal as possible.In this paper,the first coal mine face’s waterproof coal pillar was calculated using conventional and optimized calculation methods,taking into account the dip angle of the coal seam,the height of the water-guide crack zone,and the rock shift influence zone,and finally the upper limit of the first face of Hongyi Coal Mine was determined.
基金National Science Support Plan of China(2006BAB16B04)
文摘Analyzed the rule of the Water Flowing Fractured (WFF) zone's development during the fully mechanized top coal caving.Six influence factors of WFF's height were selected,viz.mining thickness,base rock thickness,dip angle,uniaxial compressing strength of roof,mudstone proportion in overlying rock,and structure of overlying rock. The height-forecasting model of WFF was established based on the Artificial Neural Net-work techniques,and was applied in the first fully mechanized top coal caving face under sea in China.