The in-situ hydraulic fracturing stress measurements have been carried out around the coastal marginal land in Fu- jian Province. And the characteristics of magnitude, direction and distribution of tectonic stress hav...The in-situ hydraulic fracturing stress measurements have been carried out around the coastal marginal land in Fu- jian Province. And the characteristics of magnitude, direction and distribution of tectonic stress have been obtained. Based on the observed stress data, the characteristics and activities of fault zones are analyzed and studied in the paper according to the Coulomb friction criteria. 1 The maximum horizontal principal compressive stress is in the NW-WNW direction from the north to the south along the coastline verge, which is parallel to the strike of the NW-trending fault zone, consistent with the direction of principal compressive stress obtained from geological structure and across-fault deformation data, and different from that reflected by focal mechanism solution by about 20°. 2 The horizontal principal stress increases with depth, the relation among three stresses is SH>Sv>Sh or SH≈Sv>Sh, and the stress state is liable to normal fault and strike-slip fault activities. 3 According to Coulomb friction criteria and taking the friction strength μ as 0.6~1.0 for analysis, the stress state reaching or exceeding the threshold for normal-fault frictional sliding near the fault implies that the current tectonic activity in the measuring area is mainly normal faulting. 4 The force source of current tectonic stress field comes mainly from the westward and northwestward horizontal extrusions from the Pacific and Philippine Plates respectively to the Eurasian Plate.展开更多
Software has been developed for digital control of WDW series testing machine and the measurement of fracture toughness by modularized design. Development of the software makes use of multi-thread and serial communica...Software has been developed for digital control of WDW series testing machine and the measurement of fracture toughness by modularized design. Development of the software makes use of multi-thread and serial communication techniques, which can accurately control the testing machine and measure the fracture toughness in real-time. Three-point bending specimens were used in the measurement. The software operates stably and reliably, expanding the function of WDW series testing machine.展开更多
Long piles of the ocean oil platform are usually manufactured as the integration of several segments, which have to be assembled one by one during installation. During pile driving, excessive pore pressure will build ...Long piles of the ocean oil platform are usually manufactured as the integration of several segments, which have to be assembled one by one during installation. During pile driving, excessive pore pressure will build up in such a high level that hydraulic fracturing in the soil round the pile may take place, which will cause the soil to consolidate much faster during pile extension period. Consequently, after pile extension, the soil strength will recover to some extent and the driving resistance will increase considerably, which makes restarting driving the pile very difficult and even causes refusal. A finite element (FE) analysis procedure is presented for judging the risk of refusal by estimating the blow counts after pile extension, in which the regain of soil strength is considered. A case analysis in Bohai Gulf is performed using the proposed orocedure to exolain the nile refusal phenomenon.展开更多
基金National Development and Reform Commission [2004]1138.
文摘The in-situ hydraulic fracturing stress measurements have been carried out around the coastal marginal land in Fu- jian Province. And the characteristics of magnitude, direction and distribution of tectonic stress have been obtained. Based on the observed stress data, the characteristics and activities of fault zones are analyzed and studied in the paper according to the Coulomb friction criteria. 1 The maximum horizontal principal compressive stress is in the NW-WNW direction from the north to the south along the coastline verge, which is parallel to the strike of the NW-trending fault zone, consistent with the direction of principal compressive stress obtained from geological structure and across-fault deformation data, and different from that reflected by focal mechanism solution by about 20°. 2 The horizontal principal stress increases with depth, the relation among three stresses is SH>Sv>Sh or SH≈Sv>Sh, and the stress state is liable to normal fault and strike-slip fault activities. 3 According to Coulomb friction criteria and taking the friction strength μ as 0.6~1.0 for analysis, the stress state reaching or exceeding the threshold for normal-fault frictional sliding near the fault implies that the current tectonic activity in the measuring area is mainly normal faulting. 4 The force source of current tectonic stress field comes mainly from the westward and northwestward horizontal extrusions from the Pacific and Philippine Plates respectively to the Eurasian Plate.
文摘Software has been developed for digital control of WDW series testing machine and the measurement of fracture toughness by modularized design. Development of the software makes use of multi-thread and serial communication techniques, which can accurately control the testing machine and measure the fracture toughness in real-time. Three-point bending specimens were used in the measurement. The software operates stably and reliably, expanding the function of WDW series testing machine.
基金supported by the National Natural Science Foundation of China(51322904 and 51279127)the Program for New Century Excellent Talents in University(HCET-11-0370)
文摘Long piles of the ocean oil platform are usually manufactured as the integration of several segments, which have to be assembled one by one during installation. During pile driving, excessive pore pressure will build up in such a high level that hydraulic fracturing in the soil round the pile may take place, which will cause the soil to consolidate much faster during pile extension period. Consequently, after pile extension, the soil strength will recover to some extent and the driving resistance will increase considerably, which makes restarting driving the pile very difficult and even causes refusal. A finite element (FE) analysis procedure is presented for judging the risk of refusal by estimating the blow counts after pile extension, in which the regain of soil strength is considered. A case analysis in Bohai Gulf is performed using the proposed orocedure to exolain the nile refusal phenomenon.