期刊文献+
共找到322篇文章
< 1 2 17 >
每页显示 20 50 100
Design Theory of Full Face Rock Tunnel Boring Machine Transition Cutter Edge Angle and Its Application 被引量:25
1
作者 ZHANG Zhaohuang MENG Liang SUN Fei 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2013年第3期541-546,共6页
At present, the inner cutters of a full face rock tunnel boring machine (TBM) and transition cutter edge angles are designed on the basis of indentation test or linear grooving test. The inner and outer edge angles of... At present, the inner cutters of a full face rock tunnel boring machine (TBM) and transition cutter edge angles are designed on the basis of indentation test or linear grooving test. The inner and outer edge angles of disc cutters are characterized as symmetric to each other with respect to the cutter edge plane. This design has some practical defects, such as severe eccentric wear and tipping, etc. In this paper, the current design theory of disc cutter edge angle is analyzed, and the characteristics of the rock-breaking movement of disc cutters are studied. The researching results show that the rotational motion of disc cutters with the cutterhead gives rise to the difference between the interactions of inner rock and outer rock with the contact area of disc cutters, with shearing and extrusion on the inner rock and attrition on the outer rock. The wear of disc cutters at the contact area is unbalanced, among which the wear in the largest normal stress area is most apparent. Therefore, a three-dimensional model theory of rock breaking and an edge angle design theory of transition disc cutter are proposed to overcome the flaws of the currently used TBM cutter heads, such as short life span, camber wearing, tipping. And a corresponding equation is established. With reference to a specific construction case, the edge angle of the transition disc cutter has been designed based on the theory. The application of TBM in some practical project proves that the theory has obvious advantages in enhancing disc cutter life, decreasing replacement frequency, and making economic benefits. The proposed research provides a theoretical basis for the design of TBM three-dimensional disc cutters whose rock-breaking operation time can be effectively increased. 展开更多
关键词 disc cutter three-dimensional mode edge angle full face rock tunnel boring machine (TBM) flat-face cutterhead
下载PDF
Wear Analysis of Disc Cutters of Full Face Rock Tunnel Boring Machine 被引量:19
2
作者 ZHANG Zhaohuang MENG Liang SUN Fei 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2014年第6期1294-1300,共7页
Wear is a major factor of disc cutters’ failure. No current theory offers a standard for the prediction of disc cutter wear yet. In the field the wear prediction method commonly used is based on the excavation length... Wear is a major factor of disc cutters’ failure. No current theory offers a standard for the prediction of disc cutter wear yet. In the field the wear prediction method commonly used is based on the excavation length of tunnel boring machine(TBM) to predict the disc cutter wear and its wear law, considering the location number of each disc cutter on the cutterhead(radius for installation); in theory, there is a prediction method of using arc wear coefficient. However, the preceding two methods have their own errors, with their accuracy being 40% or so and largely relying on the technicians’ experience. Therefore, radial wear coefficient, axial wear coefficient and trajectory wear coefficient are defined on the basis of the operating characteristics of TBM. With reference to the installation and characteristics of disc cutters, those coefficients are modified according to penetration, which gives rise to the presentation of comprehensive axial wear coefficient, comprehensive radial wear coefficient and comprehensive trajectory wear coefficient. Calculation and determination of wear coefficients are made with consideration of data from a segment of TBM project(excavation length 173 m). The resulting wear coefficient values, after modification, are adopted to predict the disc cutter wear in the follow-up segment of the TBM project(excavation length of 5621 m). The prediction results show that the disc cutter wear predicted with comprehensive radial wear coefficient and comprehensive trajectory wear coefficient are not only accurate(accuracy 16.12%) but also highly congruous, whereas there is a larger deviation in the prediction with comprehensive axial wear coefficient(accuracy 41%, which is in agreement with the prediction of disc cutters’ life in the field). This paper puts forth a new method concerning prediction of life span and wear of TBM disc cutters as well as timing for replacing disc cutters. 展开更多
关键词 full face rock tunnel boring machine disc cutter radial wear coefficient axial wear coefficient trajectory wear coefficient
下载PDF
Performance characteristics of tunnel boring machine in basalt and pyroclastic rocks of Deccan traps–A case study 被引量:5
3
作者 Prasnna Jain A.K.Naithan T.N.Singh 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2014年第1期36-47,共12页
A12.24km long tunnel between Maroshi and Ruparel College is being excavated by tunnel boring machine(TBM)to improve the water supply system of Greater Mumbai,India.In this paper,attempt has been made to establish the ... A12.24km long tunnel between Maroshi and Ruparel College is being excavated by tunnel boring machine(TBM)to improve the water supply system of Greater Mumbai,India.In this paper,attempt has been made to establish the relationship between various litho-units of Deccan traps,stability of tunnel and TBM performances during the construction of5.83km long tunnel between Maroshi and Vakola.The Maroshi–Vakola tunnel passes under the Mumbai Airport and crosses both runways with an overburden cover of around70m.The tunneling work was carried out without disturbance to the ground.The rock types encountered during excavation arefine compacted basalt,porphyritic basalt,amygdaloidal basalt pyroclastic rocks with layers of red boles and intertrappean beds consisting of various types of shales Relations between rock mass properties,physico-mechanical properties,TBM specifications and the cor responding TBM performance were established.A number of support systems installed in the tunne during excavation were also discussed.The aim of this paper is to establish,with appropriate accuracy the nature of subsurface rock mass condition and to study how it will react to or behave during under ground excavation by TBM.The experiences gained from this project will increase the ability to cope with unexpected ground conditions during tunneling using TBM. 展开更多
关键词 tunneling Open-type tunnel boring machine(TBM) rock mass classification Ground supporting Deccan trap
下载PDF
Real-time rock mass condition prediction with TBM tunneling big data using a novel rock-machine mutual feedback perception method 被引量:13
4
作者 Zhijun Wu Rulei Wei +1 位作者 Zhaofei Chu Quansheng Liu 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2021年第6期1311-1325,共15页
Real-time perception of rock mass information is of great importance to efficient tunneling and hazard prevention in tunnel boring machines(TBMs).In this study,a TBM-rock mutual feedback perception method based on dat... Real-time perception of rock mass information is of great importance to efficient tunneling and hazard prevention in tunnel boring machines(TBMs).In this study,a TBM-rock mutual feedback perception method based on data mining(DM) is proposed,which takes 10 tunneling parameters related to surrounding rock conditions as input features.For implementation,first,the database of TBM tunneling parameters was established,in which 10,807 tunneling cycles from the Songhua River water conveyance tunnel were accommodated.Then,the spectral clustering(SC) algorithm based on graph theory was introduced to cluster the TBM tunneling data.According to the clustering results and rock mass boreability index,the rock mass conditions were classified into four classes,and the reasonable distribution intervals of the main tunneling parameters corresponding to each class were presented.Meanwhile,based on the deep neural network(DNN),the real-time prediction model regarding different rock conditions was established.Finally,the rationality and adaptability of the proposed method were validated via analyzing the tunneling specific energy,feature importance,and training dataset size.The proposed TBM-rock mutual feedback perception method enables the automatic identification of rock mass conditions and the dynamic adjustment of tunneling parameters during TBM driving.Furthermore,in terms of the prediction performance,the method can predict the rock mass conditions ahead of the tunnel face in real time more accurately than the traditional machine learning prediction methods. 展开更多
关键词 Tunnel boring machine(TBM) Data mining(DM) Spectral clustering(SC) Deep neural network(DNN) rock mass condition perception
下载PDF
Tunnelling performance prediction of cantilever boring machine in sedimentary hard-rock tunnel using deep belief network 被引量:2
5
作者 SONG Zhan-ping CHENG Yun +1 位作者 ZHANG Ze-kun YANG Teng-tian 《Journal of Mountain Science》 SCIE CSCD 2023年第7期2029-2040,共12页
Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in... Evaluating the adaptability of cantilever boring machine(CBM) through in-depth excavation and analysis of tunnel excavation data and rock mass parameters is the premise of mechanical design and efficient excavation in the field of underground space engineering.This paper presented a case study of tunnelling performance prediction method of CBM in sedimentary hard-rock tunnel of Karst landform type by using tunneling data and surrounding rock parameters.The uniaxial compressive strength(UCS),rock integrity factor(Kv),basic quality index([BQ]),rock quality index RQD,brazilian tensile strength(BTS) and brittleness index(BI) were introduced to construct a performance prediction database based on the hard-rock tunnel of Guiyang Metro Line 1 and Line 3,and then established the performance prediction model of cantilever boring machine.Then the deep belief network(DBN) was introduced into the performance prediction model,and the reliability of performance prediction model was verified by combining with engineering data.The study showed that the influence degree of surrounding rock parameters on the tunneling performance of the cantilever boring machine is UCS > [BQ] > BTS >RQD > Kv > BI.The performance prediction model shows that the instantaneous cutting rate(ICR) has a good correlation with the surrounding rock parameters,and the predicting model accuracy is related to the reliability of construction data.The prediction of limestone and dolomite sections of Line 3 based on the DBN performance prediction model shows that the measured ICR and predicted ICR is consistent and the built performance prediction model is reliable.The research results have theoretical reference significance for the applicability analysis and mechanical selection of cantilever boring machine for hard rock tunnel. 展开更多
关键词 Urban metro tunnel Cantilever boring machine Hard rock tunnel Performance prediction model Linear regression Deep belief network
下载PDF
TBM tunneling in extremely hard and abrasive rocks:Problems,solutions and assisting methods 被引量:32
6
作者 ZHENG Yan-long HE Lei 《Journal of Central South University》 SCIE EI CAS CSCD 2021年第2期454-480,共27页
Extremely hard and abrasive rocks pose great challenges to the past and ongoing TBM projects by increasing cutter wear and reducing penetration rates.A considerable amount of research has been conducted to improve the... Extremely hard and abrasive rocks pose great challenges to the past and ongoing TBM projects by increasing cutter wear and reducing penetration rates.A considerable amount of research has been conducted to improve the performance of TBMs in those challenging grounds by either improving the capacity of TBMs or developing assisting rock breakage methods.This paper first highlights the challenges of hard and abrasive rocks on TBM tunneling through case studies.It then presents the development of hard rock TBMs and reviews the technologies that can be used individually or as assistance to mechanical excavators to break hard rocks.Emphases are placed on technologies of high pressure waterjet,laser and microwave.The state of the art of field and laboratory research,problems and research directions of those technologies are discussed.The assisting methods are technically feasible;however,the main challenges of using those methods in the field are that the energy consumption can be over 10 times high and that the existing equipments have robustness problems.More research should be conducted to study the overall energy consumption using TBMs and the assisting methods.Pulsed waterjet,laser and microwave technologies should also be developed to make the assistance economically viable. 展开更多
关键词 hard and abrasive rocks tunnel boring machine waterjet laser microwave
下载PDF
Theoretical prediction of wear of disc cutters in tunnel boring machine and its application 被引量:8
7
作者 Zhaohuang Zhang Muhammad Aqeel +1 位作者 Cong Li Fei Sun 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2019年第1期111-120,共10页
Predicting the cutter consumption and the exact time to replace the worn-out cutters in tunneling projects constructed with tunnel boring machine(TBM) is always a challenging issue. In this paper, we focus on the anal... Predicting the cutter consumption and the exact time to replace the worn-out cutters in tunneling projects constructed with tunnel boring machine(TBM) is always a challenging issue. In this paper, we focus on the analyses of cutter motion in the rock breaking process and trajectory of rock breaking point on the cutter edge in rocks. The analytical expressions of the length of face along which the breaking point moves and the length of spiral trajectory of the maximum penetration point are derived. Through observation of rock breaking process of disc cutters as well as analysis of disc rock interaction, the following concepts are proposed: the arc length theory of predicting wear extent of inner and center cutters, and the spiral theory of predicting wear extent of gage and transition cutters. Data obtained from5621 m-long Qinling tunnel reveal that among 39 disc cutters, the relative errors between cumulatively predicted and measured wear values for nine cutters are larger than 20%, while approximately 76.9% of total cutters have the relative errors less than 20%. The proposed method could offer a new attempt to predict the disc cutter's wear extent and changing time. 展开更多
关键词 full-face rock TUNNEL boring machine(TBM) DISC CUTTER WEAR prediction
下载PDF
Numerical and experimental investigation of rock breaking method under free surface by TBM disc cutter 被引量:11
8
作者 ZHANG Xu-hui XIA Yi-min +2 位作者 ZENG Gui-ying TAN Qing GUO Ben 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第9期2107-2118,共12页
To study the rock breaking method under the free surface induced by disc cutter,the rock breaking simulations were first conducted based on the discrete element method,and the dynamic process of rock breaking under th... To study the rock breaking method under the free surface induced by disc cutter,the rock breaking simulations were first conducted based on the discrete element method,and the dynamic process of rock breaking under the free surface was studied including stressed zone,crush zone,crack initiation and propagation.Then the crack propagation conditions,specific energy,etc.under different free surface distance(S)were also investigated combined with linear cutting experiments.The results show that the rock breaking process under the free surface induced by disc cutter is dominated by tension failure mode.There exists a critical S to promote crack propagation to free surface effectively.And this rock breaking method can improve the rock breaking force and breaking efficiency significantly when proper. 展开更多
关键词 free surface tunnel boring machine disc cutter rock breaking method
下载PDF
Machine learning-based classification of rock discontinuity trace:SMOTE oversampling integrated with GBT ensemble learning 被引量:10
9
作者 Jiayao Chen Hongwei Huang +2 位作者 Anthony G.Cohn Dongming Zhang Mingliang Zhou 《International Journal of Mining Science and Technology》 SCIE EI CAS CSCD 2022年第2期309-322,共14页
This paper presents a hybrid ensemble classifier combined synthetic minority oversampling technique(SMOTE),random search(RS)hyper-parameters optimization algorithm and gradient boosting tree(GBT)to achieve efficient a... This paper presents a hybrid ensemble classifier combined synthetic minority oversampling technique(SMOTE),random search(RS)hyper-parameters optimization algorithm and gradient boosting tree(GBT)to achieve efficient and accurate rock trace identification.A thirteen-dimensional database consisting of basic,vector,and discontinuity features is established from image samples.All data points are classified as either‘‘trace”or‘‘non-trace”to divide the ultimate results into candidate trace samples.It is found that the SMOTE technology can effectively improve classification performance by recommending an optimized imbalance ratio of 1:5 to 1:4.Then,sixteen classifiers generated from four basic machine learning(ML)models are applied for performance comparison.The results reveal that the proposed RS-SMOTE-GBT classifier outperforms the other fifteen hybrid ML algorithms for both trace and nontrace classifications.Finally,discussions on feature importance,generalization ability and classification error are conducted for the proposed classifier.The experimental results indicate that more critical features affecting the trace classification are primarily from the discontinuity features.Besides,cleaning up the sedimentary pumice and reducing the area of fractured rock contribute to improving the overall classification performance.The proposed method provides a new alternative approach for the identification of 3D rock trace. 展开更多
关键词 Tunnel face rock discontinuity trace machine learning Gradient boosting tree Generalization ability
下载PDF
Excavation of underground research laboratory ramp in granite using tunnel boring machine: Feasibility study 被引量:12
10
作者 Hongsu Ma Ju Wang +3 位作者 Ke Man Liang Chen Qiuming Gong Xingguang Zhao 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2020年第6期1201-1213,共13页
Underground research laboratory(URL)plays an important role in safe disposal of high-level radioactive waste(HLW).At present,the Xinchang site,located in Gansu Province of China,has been selected as the final site for... Underground research laboratory(URL)plays an important role in safe disposal of high-level radioactive waste(HLW).At present,the Xinchang site,located in Gansu Province of China,has been selected as the final site for China’s first URL,named Beishan URL.For this,a preliminary design of the Beishan URL has been proposed,including one spiral ramp,three shafts and two experimental levels.With advantages of fast advancing and limited disturbance to surrounding rock mass,the tunnel boring machine(TBM)method could be one of the excavation methods considered for the URL ramp.This paper introduces the feasibility study on using TBM to excavation of the Beishan URL ramp.The technical challenges for using TBM in Beishan URL are identified on the base of geological condition and specific layout of the spiral ramp.Then,the technical feasibility study on the specific issues,i.e.extremely hard rock mass,high abrasiveness,TBM operation,muck transportation,water drainage and material transportation,is investigated.This study demonstrates that TBM technology is a feasible method for the Beishan URL excavation.The results can also provide a reference for the design and construction of HLW disposal engineering in similar geological conditions.2020 Institute of Rock and Soil Mechanics,Chinese Academy of Sciences.Production and hosting by Elsevier B.V.This is an open access article under the CC BY-NC-ND license(http://creativecommons.org/licenses/by-nc-nd/4.0/). 展开更多
关键词 Underground research laboratory(URL) High-level radioactive waste(HLW)disposal Tunnel boring machine(TBM) Extremely hard rock mass rock mass boreability Spiral layout Beishan
下载PDF
预切缝辅助TBM滚刀破岩贯入荷载演化规律
11
作者 蒋亚龙 徐彭楚璇 +2 位作者 曾建军 徐长节 熊扶阳 《土木与环境工程学报(中英文)》 北大核心 2025年第1期63-70,共8页
基于全断面隧道掘进机(Tunnel Boring Machine,TBM)滚刀贯入室内模型试验,研究了3种不同破岩模式(完整岩样破岩、同轨迹破岩和异轨迹破岩)在不同围压条件下高强度花岗岩样贯入荷载演化特征,重点揭示贯入荷载-贯入度特征曲线、峰值荷载... 基于全断面隧道掘进机(Tunnel Boring Machine,TBM)滚刀贯入室内模型试验,研究了3种不同破岩模式(完整岩样破岩、同轨迹破岩和异轨迹破岩)在不同围压条件下高强度花岗岩样贯入荷载演化特征,重点揭示贯入荷载-贯入度特征曲线、峰值荷载、最大跌落幅值变化规律,获取不同破岩模式在不同围压条件下TBM滚刀受力特性。结果表明:1)高围压组贯入荷载-贯入度特征曲线较低围压组先跌落,跌落幅度较小,但其对应的贯入荷载并非峰值荷载,而低围压组初次跌落荷载为峰值荷载,且跌落幅值较大;2)在中高围压10~15 MPa时,峰值荷载及贯入荷载最大跌落幅值均最小,表明此围压范围较利于TBM的掘进;3)低围压条件下选用异轨迹破岩模式较同轨迹破岩模式能更有效地降低TBM滚刀贯入荷载,但同轨迹破岩模式的岩样发生楔裂破坏,其最大跌落幅值最小,更能减少刀具所受冲击荷载,减少刀具磨损。 展开更多
关键词 高强度超硬岩 全断面隧道掘进机 预切缝 破岩模式 贯入荷载
下载PDF
Technical innovation in the “Beishan No. 1” hard rock tunnel boring machine for high-gradient spiral tunnels 被引量:1
12
作者 Ju WANG Mengxue QI +1 位作者 Bin LONG Hongsu MA 《Frontiers of Engineering Management》 CSCD 2024年第1期175-179,共5页
1 Project overview The“Beishan No.1”,the world’s first-ever hard rock Tunnel Boring Machine(TBM)tailored for high-gradient spiral tunnels,constitutes a pivotal element within the Beishan Underground Research Labora... 1 Project overview The“Beishan No.1”,the world’s first-ever hard rock Tunnel Boring Machine(TBM)tailored for high-gradient spiral tunnels,constitutes a pivotal element within the Beishan Underground Research Laboratory(URL)initiative in China.Beishan URL,the first URL for geological disposal of high level radioactive waste(HLW)in China,is a national key construction project listed in the“13th Five-Year Plan”.In 2019,subsequent to receiving approval from the China Atomic Energy Authority,the Beijing Research Institute of Uranium Geology(BRIUG),serving as the project’s owner,initiated its construction.This underground facility,categorized as a“third generation”URL for HLW disposal,i.e.,area-specific URL,was located in Beishan,Jiuquan City,Gansu Province,China,following more than three decades of rigorous research on site selection. 展开更多
关键词 tunnel boring machine extremely hard rock continuous small-radius curves high gradient equipment technology INNOVATION
原文传递
TBM在煤矿岩巷掘进中的应用研究
13
作者 成建国 《凿岩机械气动工具》 2025年第1期98-100,共3页
文章针对煤矿岩巷掘进复杂多变的地质条件和施工需求,阐述了全断面隧道掘进机(tunnel boring machine,TBM)的工作原理、结构组成和工艺特点,并通过实际案例,分析其在煤矿岩巷掘进中的应用效果。研究发现,TBM在掘进速度、施工安全性、企... 文章针对煤矿岩巷掘进复杂多变的地质条件和施工需求,阐述了全断面隧道掘进机(tunnel boring machine,TBM)的工作原理、结构组成和工艺特点,并通过实际案例,分析其在煤矿岩巷掘进中的应用效果。研究发现,TBM在掘进速度、施工安全性、企业效益等方面均表现出显著的应用优势。同时,由于TBM在使用中面临地质条件复杂、设备维护成本高、对操作人员技术水平要求高等问题,提出了相应的解决方案和优化建议,旨在进一步推动TBM在煤矿岩巷掘进中的广泛应用,为类似工程提供参考。 展开更多
关键词 全断面隧道掘进机 岩巷掘进 设备维护
下载PDF
双模式多支护深竖井敞开式TBM施工工法
14
作者 陈泓泽 方烨 《山西建筑》 2025年第5期160-163,共4页
由于传统的竖井施工方法存在井下作业人员多、工序复杂、施工环境极其恶劣等难以解决的问题,因此亟需在实际工程中探索以机械破岩为主的竖井非爆开挖方法,提高竖井施工的机械化、自动化水平,简化竖井的施工工序,改善井下施工人员的施工... 由于传统的竖井施工方法存在井下作业人员多、工序复杂、施工环境极其恶劣等难以解决的问题,因此亟需在实际工程中探索以机械破岩为主的竖井非爆开挖方法,提高竖井施工的机械化、自动化水平,简化竖井的施工工序,改善井下施工人员的施工环境。文章从全断面竖井掘进机的设备组成和性能参数、分体始发和整体始发阶段的详细吊装及施工流程以及对现有出渣模式及换步技术的改进创新等方面,对全断面竖井掘进机在火山隧道竖井工程施工中的应用进行了全面的介绍,形成全断面竖井掘进机始发及掘进关键技术,为后续采用全断面竖井掘进机进行竖井施工提供参考。 展开更多
关键词 全断面竖井掘进机 机械破岩 分体始发 通风竖井 双模式掘进
下载PDF
Real-time prediction of rock mass classification based on TBM operation big data and stacking technique of ensemble learning 被引量:21
15
作者 Shaokang Hou Yaoru Liu Qiang Yang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2022年第1期123-143,共21页
Real-time prediction of the rock mass class in front of the tunnel face is essential for the adaptive adjustment of tunnel boring machines(TBMs).During the TBM tunnelling process,a large number of operation data are g... Real-time prediction of the rock mass class in front of the tunnel face is essential for the adaptive adjustment of tunnel boring machines(TBMs).During the TBM tunnelling process,a large number of operation data are generated,reflecting the interaction between the TBM system and surrounding rock,and these data can be used to evaluate the rock mass quality.This study proposed a stacking ensemble classifier for the real-time prediction of the rock mass classification using TBM operation data.Based on the Songhua River water conveyance project,a total of 7538 TBM tunnelling cycles and the corresponding rock mass classes are obtained after data preprocessing.Then,through the tree-based feature selection method,10 key TBM operation parameters are selected,and the mean values of the 10 selected features in the stable phase after removing outliers are calculated as the inputs of classifiers.The preprocessed data are randomly divided into the training set(90%)and test set(10%)using simple random sampling.Besides stacking ensemble classifier,seven individual classifiers are established as the comparison.These classifiers include support vector machine(SVM),k-nearest neighbors(KNN),random forest(RF),gradient boosting decision tree(GBDT),decision tree(DT),logistic regression(LR)and multilayer perceptron(MLP),where the hyper-parameters of each classifier are optimised using the grid search method.The prediction results show that the stacking ensemble classifier has a better performance than individual classifiers,and it shows a more powerful learning and generalisation ability for small and imbalanced samples.Additionally,a relative balance training set is obtained by the synthetic minority oversampling technique(SMOTE),and the influence of sample imbalance on the prediction performance is discussed. 展开更多
关键词 Tunnel boring machine(TBM)operation data rock mass classification Stacking ensemble learning Sample imbalance Synthetic minority oversampling technique(SMOTE)
下载PDF
Laboratory tests to study the influence of rock stress confinement on the performances of TBM discs in tunnels 被引量:6
16
作者 N. Innaurato C. Oggeri +1 位作者 P. Oreste R. Vinai 《International Journal of Minerals,Metallurgy and Materials》 SCIE EI CAS CSCD 2011年第3期253-259,共7页
To clarify some aspects of rock destruction with a disc acting on a high confined tunnel face, a series of tests were carried out to examine fracture mechanisms under an indenter that simulates the tunnel boring machi... To clarify some aspects of rock destruction with a disc acting on a high confined tunnel face, a series of tests were carried out to examine fracture mechanisms under an indenter that simulates the tunnel boring machine (TBM) tool action, in the presence of an adjacent groove, when a state of stress (lateral confinement) is imposed on a rock sample. These tests proved the importance of carefully establishing the optimal distance of grooves produced by discs acting on a confined surface, and the value (as a mere order of magnitude) of the increase of the thrust to produce the initiation of chip formation, as long as the confinement pressure becomes greater. 展开更多
关键词 TUNNELS boring machines rock mechanics stress analysis
下载PDF
The three-dimension model for the rock-breaking mechanism of disc cutter andanalysis of rock-breaking forces 被引量:25
17
作者 Zhao-Huang Zhang Fei Sun 《Acta Mechanica Sinica》 SCIE EI CAS CSCD 2012年第3期675-682,共8页
To study the rock deformation with three- dimensional model under rolling forces of disc cutter, by car- rying out the circular-grooving test with disc cutter rolling around on the rock, the rock mechanical behavior u... To study the rock deformation with three- dimensional model under rolling forces of disc cutter, by car- rying out the circular-grooving test with disc cutter rolling around on the rock, the rock mechanical behavior under rolling disc cutter is studied, the mechanical model of disc cutter rolling around the groove is established, and the the- ory of single-point and double-angle variables is proposed. Based on this theory, the physics equations and geometric equations of rock mechanical behavior under disc cutters of tunnel boring machine (TBM) are studied, and then the bal- ance equations of interactive forces between disc cutter and rock are established. Accordingly, formulas about normal force, rolling force and side force of a disc cutter are de- rived, and their validity is studied by tests. Therefore, a new method and theory is proposed to study rock- breaking mech- anism of disc cutters. 展开更多
关键词 full face rock tunnel boring machine (TBM) Disc cutte Three-dimension model
下载PDF
Experimental study on acoustic emission characteristics of jointed rock mass by double disc cutter 被引量:5
18
作者 LIN Qi-bin CAO Ping +3 位作者 LI Kai-hui CAO Ri-hong ZHOU Ke-ping DENG Hong-wei 《Journal of Central South University》 SCIE EI CAS CSCD 2018年第2期357-367,共11页
The characteristics of joints are crucial factors which influence the penetration efficiency of tunnel boring machine(TBM).Based on the theoretical study,numerical simulation and experimental research,many researchers... The characteristics of joints are crucial factors which influence the penetration efficiency of tunnel boring machine(TBM).Based on the theoretical study,numerical simulation and experimental research,many researchers have studied the interaction between TBM disc cutters and jointed rock mass.However,in most of these works,the effect of joint on rock fragmentation by double disc cutter has been scarcely investigated.Thus,the effects of joint orientation and joint space on rock fragmentation by double disc cutter are highlighted in this study.During the test,jointed concrete specimens are adopted to simulate jointed rock mass.Improved RYL-600rock shear rheological instrument was employed during the indentation process under disc cutters,and acoustic emission location system was used to analyze the rock damage and physical deterioration.The results show that there are four failure modes and three modes of crack initiation and propagation in jointed rock mass.It is concluded that the existing joint planes have obviously restrained the crack initiation and propagation during the rock fragmentation process.The results also indicate that samples are damaged most seriously when joint orientation equals60°,which is proved to be the optimum joint orientation in TBM penetration. 展开更多
关键词 tunnel boring machine (TBM) jointed rock mass rock fragmentation crack propagation acoustic emission
下载PDF
Influence of confining stress on fracture characteristics and cutting efficiency of TBM cutters conducted on soft and hard rock 被引量:2
19
作者 刘京铄 曹平 +1 位作者 刘杰 蒋喆 《Journal of Central South University》 SCIE EI CAS CSCD 2015年第5期1947-1955,共9页
Combined with numerical simulation, the influence of confining stress on cutting process, fracture conditions and cutting efficiencies of soft and hard rock has been conducted on the triaxial testing machine(TRW-3000)... Combined with numerical simulation, the influence of confining stress on cutting process, fracture conditions and cutting efficiencies of soft and hard rock has been conducted on the triaxial testing machine(TRW-3000) designed and manufactured in Central South University(China). Results are obtained by performing analysis on the fracture scopes of cement and granite plates,the characteristics of cutting force in cutting processes and the cutting efficiency. Firstly, the increase of latitude fracture scope and the decrease of longitude fracture scope are both more notable in the tests conducted on cement plates subjected to the increasing confining stresses; secondly, the increase tendency of peak penetration forces obtained from tests conducted on granite plates is more obvious, however, the increase tendencies of average penetration forces achieved from cement and granite plates are close to each other; thirdly, the cutting efficiency could be improved by increasing the spacing between cutters when the confining stress which acts on soft and hard rock increases in a certain degree, and the cutting efficiency of soft rock is more sensitive to the varying confining stresses. 展开更多
关键词 triaxial testing machine numerical study tunnel boring machine(TBM) cutter confining stress soft and hard rock cutting efficiency
下载PDF
Rock fragmentation under different installation polar angles of TBM disc cutters 被引量:1
20
作者 CHENG Yong-liang ZHONG Jue +1 位作者 MEI Yong-bing XIA Yi-min 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第10期2306-2313,共8页
The disc cutters of tunnel boring machine(TBM) are installed with different polar angles. This causes the cutting depth difference between adjacent disc cutters on the tunnel face. A rock-cutting model was established... The disc cutters of tunnel boring machine(TBM) are installed with different polar angles. This causes the cutting depth difference between adjacent disc cutters on the tunnel face. A rock-cutting model was established to study the rock fragmentation law between adjacent disc cutters with different polar angles based on particle flow code(PFC). The influence of polar angle of adjacent disc cutters on rock cracks and stresses under different cutter spacing and penetration was studied. Research shows that polar angle difference leads to the discontinuity of rock-fragmentation process by adjacent cutters. The effect of rock-fragmentation is influenced by the cutting depth difference between adjacent cutters. The effect of rock-fragmentation performed best, meanwhile large rock blocks were flaked when the difference of cutting depth is half of the penetration. Too large or small difference of the cutting depth will cause high specific energy consumption of rock fragmentation. The specific energy consumption is relatively small when the difference of cutting depth is half of the penetration. 展开更多
关键词 tunnel boring machine DISC CUTTER POLAR angle particle flow code rock FRAGMENTATION
下载PDF
上一页 1 2 17 下一页 到第
使用帮助 返回顶部