The Millau viaduct over the Tam River is an exceptional bridge considering the height under the deck and the 2.5 km total length. Each of the seven high piers is founded on a thick raft setting on four large piles of ...The Millau viaduct over the Tam River is an exceptional bridge considering the height under the deck and the 2.5 km total length. Each of the seven high piers is founded on a thick raft setting on four large piles of 5 m in diameter and 10-15 m deep. The ground schematically consists of limestone in the north and of marls in the south. As the bridge is very sensitive to foundation settlements, the concessionary company decided to use the observational method for controlling the displacements and if necessary stabilize the foundations. The measurements show that the movements have remained small and admissible, particularly in terms of the rotations. The settlements have not occurred continuously under the load, but by steps.展开更多
新建津石高速公路与既有铁路线路交汇,采用2×65 m T形刚构大节段现浇转体上跨既有铁路。考虑桥墩下部承台桩基距离既有铁路较近,通过施作防护桩、拉森钢板桩、回灌井及调整施工顺序等手段最大限度的减小对既有铁路的影响;采用水泥...新建津石高速公路与既有铁路线路交汇,采用2×65 m T形刚构大节段现浇转体上跨既有铁路。考虑桥墩下部承台桩基距离既有铁路较近,通过施作防护桩、拉森钢板桩、回灌井及调整施工顺序等手段最大限度的减小对既有铁路的影响;采用水泥搅拌桩加固地基,满足现浇梁支架地基承载要求;转体施工加强防护与监测。采用PLAXIS完成相关模拟运算,顺利完成上跨铁路转体施工,对后续类似工程有较大的参考价值。展开更多
文摘The Millau viaduct over the Tam River is an exceptional bridge considering the height under the deck and the 2.5 km total length. Each of the seven high piers is founded on a thick raft setting on four large piles of 5 m in diameter and 10-15 m deep. The ground schematically consists of limestone in the north and of marls in the south. As the bridge is very sensitive to foundation settlements, the concessionary company decided to use the observational method for controlling the displacements and if necessary stabilize the foundations. The measurements show that the movements have remained small and admissible, particularly in terms of the rotations. The settlements have not occurred continuously under the load, but by steps.
文摘新建津石高速公路与既有铁路线路交汇,采用2×65 m T形刚构大节段现浇转体上跨既有铁路。考虑桥墩下部承台桩基距离既有铁路较近,通过施作防护桩、拉森钢板桩、回灌井及调整施工顺序等手段最大限度的减小对既有铁路的影响;采用水泥搅拌桩加固地基,满足现浇梁支架地基承载要求;转体施工加强防护与监测。采用PLAXIS完成相关模拟运算,顺利完成上跨铁路转体施工,对后续类似工程有较大的参考价值。