Similar material simulation research on movement law of roof over-lying strata in stope of fully mechanized caving face with large mining height 被引量:2
1
作者 ZHU Yong-jian PENG Gang 《Journal of Coal Science & Engineering(China)》 2010年第1期6-10,共5页
Similar material simulation test W9-15 101 fully mechanized caving face with was carried out in a geological model of large mining height in the Liuhuanggou Colliery, in Xinjiang Uigur Autonomous Region. The roof over... Similar material simulation test W9-15 101 fully mechanized caving face with was carried out in a geological model of large mining height in the Liuhuanggou Colliery, in Xinjiang Uigur Autonomous Region. The roof overlying strata movement law in the stope of a fully mechanized caving face with large mining height was studied and show that the roof overlying strata in the stope of a fully mechanized caving face with large mining height can be formed into a stable arch structure; the fracture rock beam is formed resembling a "bond beam", but it has essentially the structure of "multi-span beams" under the big structure of the stable arch. The roof overlying strata movement law in the stope of a fully mechanized caving face with large mining height is similar to that of the common, fully mechanized caving stope, which is determined by the deformation and instability of the structure of "multi-span beams". But because of the differences between the mining heights, the peak pressure in the stope of a fully mechanized caving face with large mining height is smaller while the affected area of abutment pressure is wider in the front of the working face; this is the obvious difference in abutment pressure between the stope of a fully mechanized caving face with large mining height and that of the common. 展开更多
关键词 fully mechanized caving face with large mining height STOPE roof overlyingstrata stable arch structure
下载PDF
Technological optimization of fully mechanized caving mining face with large mining heights 被引量:1
2
作者 Lu-Jia FAN Sheng-Li YANG 《Journal of Coal Science & Engineering(China)》 2013年第3期290-294,共5页
Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order... Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order to improve the top-coal recovery ratio of fully mechanized cave mining with large mining height, a study was conducted on optimizing the caving process, based on the mechanized caving face 1302N in Longgu Coal Mine. This was achieved by improving the PFC numerical calculation methods, and establishing a more accurate model system. On this basis, the recovery ratio of the top coal in different drawing intervals and technologies was investigated in order to achieve a reasonable caving process. The top-coal tracking system was used for practical surveying of the recovery ratio of top coal. 展开更多
关键词 fully mechanized caving face large mining height caving process optimization numerical calculation by PFC top-coal tracking system
下载PDF
Analysis and key control technologies to prevent spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines 被引量:7
3
作者 QIN Bo-tao SUN Qing-guo +2 位作者 WANG De-ming ZHANG Lei-lin XU Qin 《Mining Science and Technology》 EI CAS 2009年第4期446-451,共6页
In order to prevent spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines in China, we have analyzed the characteristics of spontaneous coal combustion and explain ... In order to prevent spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines in China, we have analyzed the characteristics of spontaneous coal combustion and explain theoretically the factors affecting spontaneous coal combustion, such as rock bursts, high temperatures, high ventilation resistance, slow advancing speed and large obliquity mining. Key technologies to prevent spontaneous combustion occurring in sharply inclined seams in deep mines are pro- posed; these include pouring water, stopping leakage in upper and lower comers of the working face, choking off the goaf and cov- eting the coal. CO concentrations were controlled within two years to less than 15×10^-6 at the upper comer by applying these tech- nologies at the 1410 working face of the Huafeng coal mine. Our method has significant theoretical value and is of practical impor- tance in controlling spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines. 展开更多
关键词 deep mine fully mechanized caving face with large obliquity spontaneous coal combustion
下载PDF
Back-and-forth mining for hard and thick coal seams—research about the mining technology for fully mechanized caving working face of Datong Mine
4
作者 金智新 于红 +1 位作者 于斌 宋华岭 《Journal of Coal Science & Engineering(China)》 2005年第2期1-4,共4页
The article introduced the key technology, mining process, and back-and-forth mining method for the caving working face of hard-thick coal seams in Datong mine, and researched this innovations process, optimized the s... The article introduced the key technology, mining process, and back-and-forth mining method for the caving working face of hard-thick coal seams in Datong mine, and researched this innovations process, optimized the systemic design and working face out-play, tried to perfect the caving mining technology of hard-thick coal seams further. 展开更多
关键词 hard and thick coal seams fully mechanized caving working face back-and- forth mining
下载PDF
STUDY ON PRODUCTION SYSTEM OPERATION REGULARITY OF FULLY MECHANIZED SUBLEVEL CAVING MINING AND SEQUENTIAL OPERATION
5
作者 李学忠 王新淮 陈永文 《Journal of Coal Science & Engineering(China)》 1998年第1期30-35,共6页
According to a lot of practical data in Liujialiang Mine and reliability theory and result of computer simulation, operation regularity of fully mechanized sublevel caving mining production system in the condition of ... According to a lot of practical data in Liujialiang Mine and reliability theory and result of computer simulation, operation regularity of fully mechanized sublevel caving mining production system in the condition of gently inclined complicated geological structure and production shortcomings are found out and reliability of system and output of the working face are predicted finally. 展开更多
关键词 fully mechanized sublevel caving mining face sequential operation computer simulation reliability theory
下载PDF
Development and prospect on fully mechanized mining in Chinese coal mines 被引量:104
6
作者 Jinhua Wang 《International Journal of Coal Science & Technology》 EI CAS 2014年第3期253-260,共8页
Fully mechanized mining(FMM)technology has been applied in Chinese coal mines for more than 40 years.At present,the output of a FMM face has reached 10-million tons with Chinese-made equipment.In this study,the new de... Fully mechanized mining(FMM)technology has been applied in Chinese coal mines for more than 40 years.At present,the output of a FMM face has reached 10-million tons with Chinese-made equipment.In this study,the new developments in FMM technology and equipment in Chinese coal mines during past decades are introduced.The automatic FMM technology for thin seams,complete sets of FMM technology with ultra large shear height of 7 m for thick seams,complete sets of fully mechanized top coal caving technology with large shear height for ultra-thick seams of 20 m,complete sets of FMM technology for complex and difficult seams,including steeply inclined seams,soft coal seams with large inclination angle,and the mechanized filling mining technology and equipment are presented.Some typical case studies are also introduced.Finally,the existing problems with the FMM technology are discussed,and prospect of FMM technology and equipment applied in Chinese coal mines is put forward. 展开更多
关键词 fully mechanized mining mining with large shear height fully mechanized top coal caving Steeply inclined seam Back filling mining PROSPECT
下载PDF
Systematic principles of surrounding rock control in longwall mining within thick coal seams 被引量:9
7
作者 Jiachen Wang Zhaohui Wang 《International Journal of Mining Science and Technology》 EI CSCD 2019年第1期65-71,共7页
Effective surrounding rock control is a prerequisite for realizing safe mining in underground coal mines.In the past three decades, longwall top-coal caving mining(LTCC) and single pass large height longwall mining(SP... Effective surrounding rock control is a prerequisite for realizing safe mining in underground coal mines.In the past three decades, longwall top-coal caving mining(LTCC) and single pass large height longwall mining(SPLL) found expanded usage in extracting thick coal seams in China. The two mining methods lead to large void space left behind the working face, which increases the difficulty in ground control.Longwall face failure is a common problem in both LTCC and SPLL mining. Such failure is conventionally attributed to low strength and high fracture intensity of the coal seam. However, the stiffness of main components included in the surrounding rock system also greatly influences longwall face stability.Correspondingly, surrounding rock system is developed for LTCC and SPLL faces in this paper. The conditions for simultaneous balance of roof structure and longwall face are put forward by taking the stiffness of coal seam, roof strata and hydraulic support into account. The safety factor of the longwall face is defined as the ratio between the ultimate bearing capacity and actual load imposed on the coal wall.The influences provided by coal strength, coal stiffness, roof stiffness, and hydraulic support stiffness,as well as the movement of roof structure are analyzed. Finally, the key elements dominating longwall face stability are identified for improving surrounding rock control effectiveness in LTCC and SPLL faces. 展开更多
关键词 LONGWALL top coal caving mining Single PASS large height LONGWALL mining SURROUNDING rock system LONGWALL face stability
下载PDF
Ground pressure and overlying strata structure for a repeated mining face of residual coal after room and pillar mining 被引量:10
8
作者 Jiang Bangyou Wang Lianguo +2 位作者 Lu Yinlong Sun Xiaokang Jin Gan 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第4期645-652,共8页
To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining, the roof fracture structural model and mechanical model were dev... To investigate the abnormal ground pressures and roof control problem in fully mechanized repeated mining of residual coal after room and pillar mining, the roof fracture structural model and mechanical model were developed using numerical simulation and theoretical analysis. The roof fracture characteristics of a repeated mining face were revealed and the ground pressure law and roof supporting condi- tions of the repeated mining face were obtained. The results indicate that when the repeated mining face passes the residual pillars, the sudden instability causes fracturing in the main roof above the old goal and forms an extra-large rock block above the mining face. A relatively stable "Voussoir beam" structure is formed after the advance fracturing of the main roof. When the repeated mining face passes the old goaf, as the large rock block revolves and touches gangue, the rock block will break secondarily under overburden rock loads. An example calculation was performed involving an integrated mine in Shanxi province, results showed that minimum working resistance values of support determined to be reason- able were respectively 11,412 kN and 10,743 kN when repeated mining face passed through residual pillar and goaf. On-site ground pressure monitoring results indicated that the mechanical model and support resistance calculation were reasonable. 展开更多
关键词 Residual coal after room and pillar mining Repeated mining fully mechanized caving face Roof control Support resistance
下载PDF
厚煤层大采高综放工作面覆岩断裂演化规律研究 被引量:1
9
作者 刘洪涛 罗紫龙 +3 位作者 韩子俊 韩洲 陈小港 彭佳琛 《煤炭科学技术》 EI CAS CSCD 北大核心 2024年第3期1-12,共12页
大采高综放开采易形成强烈的矿压显现,上覆岩层的断裂演化规律对工作面安全生产至关重要。以羊场湾煤矿160206工作面为工程背景,运用相似模拟试验、数值模拟和理论分析的综合研究方法,对大采高综放工作面覆岩的断裂过程与覆岩运移规律... 大采高综放开采易形成强烈的矿压显现,上覆岩层的断裂演化规律对工作面安全生产至关重要。以羊场湾煤矿160206工作面为工程背景,运用相似模拟试验、数值模拟和理论分析的综合研究方法,对大采高综放工作面覆岩的断裂过程与覆岩运移规律进行系统研究。研究表明:导水裂隙带内岩层随工作面推进表现为“台阶下沉”,同层岩层下沉趋势沿走向表现为“急剧下降—稳定(最大值)—快速上升—稳定(最小值)”。工作面覆岩运动场由两区分布(加速下沉区、缓慢下沉区)演化为三区分布(加速下沉区、缓慢下沉区、稳定区)。对离层演化与地表下沉规律进行了定量描述,运用理论计算表达式深入地剖析了地表的动态下沉机理及其相关因素。结合相似模拟与数值模拟的试验结果,提出了覆岩断裂演化的形态变化特征:覆岩断裂形态由“单等腰梯形”演化为“双等腰梯形”,表土层影响区由“矩形”演化为“倒梯形”。分析了覆岩中垮落区、离层区、压实区、裂隙富集区的动态演化过程:垮落区逐渐增大至一定程度,高度小幅度降低并趋于稳定,离层区由下至上逐渐发育并随工作面向前移动,离层区逐渐闭合形成压实区,且压实区逐渐增大并最终保持稳定,裂隙富集区位于采空区前后端部并随工作面向前移动。 展开更多
关键词 大采高综放 相似模拟 覆岩运动场 覆岩运移 覆岩断裂形态
下载PDF
综放工作面围岩控制与智能化放煤技术现状及展望
10
作者 庞义辉 关书方 +2 位作者 姜志刚 白云 李鹏 《工矿自动化》 CSCD 北大核心 2024年第9期20-27,共8页
分析了厚及特厚煤层智能化综放工作面围岩控制技术与智能化放顶煤技术发展现状及存在的问题,从巷道围岩高效支护、工作面超前支护、坚硬特厚顶煤冒放性、液压支架位姿监测及智能化放顶煤5个方面提出了工程实际需求。针对综放工作面实现... 分析了厚及特厚煤层智能化综放工作面围岩控制技术与智能化放顶煤技术发展现状及存在的问题,从巷道围岩高效支护、工作面超前支护、坚硬特厚顶煤冒放性、液压支架位姿监测及智能化放顶煤5个方面提出了工程实际需求。针对综放工作面实现安全、高效、智能化开采存在的技术难题与工程需求,对综放工作面围岩控制技术、智能化放煤技术进行了研究:构建了坚硬特厚煤层顶煤悬臂梁力学模型,研发了提高顶煤冒放性及放出率关键技术,实现了坚硬特厚煤层超大采高综放开采;研发了单元式超前液压支架顶梁可旋转自复位装置,实现了液压支架顶梁根据巷道顶板倾斜角度自动旋转支护,有效提高了单元式超前液压支架对巷道顶底板的适应性;提出了采用巷道支护液压支架替代传统锚网支护结构的思路,具有支护效率高、成本低、节省工作面超前支护等优点;开发了基于立柱与尾梁千斤顶行程的综放液压支架支护姿态监测装置与算法,提高了液压支架支护姿态解算效率与精度;提出了基于透明地质模型、煤量监测装置与煤矸识别装置融合的智能放煤控制方法,可有效解决多夹矸层特厚顶煤智能化放煤技术难题。提出智能地质保障技术、机器视觉精准测量与智能感知技术、综放工作面设备智能精准自适应控制技术、综放工作面数字孪生技术等是智能化综放开采技术与装备的发展趋势。 展开更多
关键词 特厚煤层 综放开采 综放工作面 围岩控制 智能化放煤
下载PDF
综采工作面采动覆岩导水裂隙带发育高度综合研究
11
作者 王毅 周余 +3 位作者 张丁丁 王禹 杨珍 王伟 《矿业安全与环保》 CAS 北大核心 2024年第5期132-141,共10页
针对因煤层开采易导致上覆岩层产生裂隙,贯通地下含水层引发矿井水灾的问题,以盘城岭煤业150105工作面为研究背景,采用理论公式、现场井下仰孔注水测漏法和钻孔电视成像探测法,以及FLAC3D和UDEC数值模拟综合分析导水裂隙带的高度和发育... 针对因煤层开采易导致上覆岩层产生裂隙,贯通地下含水层引发矿井水灾的问题,以盘城岭煤业150105工作面为研究背景,采用理论公式、现场井下仰孔注水测漏法和钻孔电视成像探测法,以及FLAC3D和UDEC数值模拟综合分析导水裂隙带的高度和发育规律。理论计算导水裂隙带的最大高度为81.56 m;通过井下仰孔注水测漏法监测3个钻孔的注水渗透量梯度临界值为12 L/min,通过临界值判定导水裂隙带高度为78.56~79.99 m;通过钻孔电视成像探测法观测钻孔内裂隙分布判定导水裂隙带高度为78.39~79.46 m;利用FLAC3D和UDEC数值模拟,根据覆岩塑性区变化特征,当工作面推进至180 m时,裂隙发生贯通,塑性区最大高度达到76.4 m,并根据覆岩塑性区变化、垂直应力分布、垂直位移云图分析了导水裂隙带发育规律的3个阶段。对不同方法下的导水裂隙带高度进行了相互验证。 展开更多
关键词 综采工作面 采动覆岩 导水裂隙带 裂隙带最大高度 现场观测 数值模拟
下载PDF
基于微震监测的浅埋8 m超大采高综采面矿压规律现场监测研究
12
作者 任建喜 张犇 +1 位作者 胡俭 毛小娃 《煤炭技术》 CAS 2024年第4期6-11,共6页
以陕北矿区某矿2203浅埋超大采高综采面为工程背景,采用微震监测技术,对浅埋超大采高综采面矿压规律进行了研究。结果表明:单日微震事件数达到峰值后,综采面继续回采8.25~11 m内,能量大于103J的事件增多,微震事件能量及支架压力达到峰值... 以陕北矿区某矿2203浅埋超大采高综采面为工程背景,采用微震监测技术,对浅埋超大采高综采面矿压规律进行了研究。结果表明:单日微震事件数达到峰值后,综采面继续回采8.25~11 m内,能量大于103J的事件增多,微震事件能量及支架压力达到峰值,随后顶板出现垮落现象。综采面初次来压前,微震总能量为6.40×10^(3)J,矿压显现期间为1.07×10^(4)J,总能量增长67%;由于综采面矿压显现与微震最大能量峰值出现一致,通过2次最大能量峰值时综采面位置可以确定综采面周期来压步距。2203综采面初次来压步距为24.75 m,周期来压步距为27~35.25 m,由此确定,顺槽超前支护距离为36 m,实践表明,2203综采面采用ZCZY10300/31/55D型超前液压支架满足巷道超前支护的要求。微震监测是矿压显现规律分析的有效手段,采用液压支架压力变化与微震能量协同分析的方法研究超大采高综采面的矿压规律是可行的。 展开更多
关键词 浅埋综采面 8 m超大采高 初次来压 周期来压 微震监测
下载PDF
6~10 m厚煤层超大采高液压支架及其工作面系统自适应智能耦合控制 被引量:3
13
作者 韩会军 王国法 +3 位作者 许永祥 张金虎 雷声 李艳鹏 《煤炭科学技术》 EI CAS CSCD 北大核心 2024年第5期276-288,共13页
厚煤层储量及产量占我国原煤总储量及产量的一半,通过梳理厚煤层开采历史沿革,总结了我国厚煤层开采40年来的技术及装备研发实践,系统分析了以高端大采高液压支架及围岩智能耦合理论为代表的6~10 m大采高综采高效智能化综采技术及装备... 厚煤层储量及产量占我国原煤总储量及产量的一半,通过梳理厚煤层开采历史沿革,总结了我国厚煤层开采40年来的技术及装备研发实践,系统分析了以高端大采高液压支架及围岩智能耦合理论为代表的6~10 m大采高综采高效智能化综采技术及装备研究进展,提出了大采高支护理论及围岩智能耦合控制的突破是厚煤层一次开采高度突破的首要因素,完善的感知体系建立是液压支架自适应支护的前提,数字技术的应用为大采高工作面高效推进及装备智能协同控制提供了新的技术途径;阐明了大采高综放液压支架与围岩耦合关系,剖析了采高增加对硬煤层冒放性的有利影响,提出了基于煤矸识别、放煤机构控制的“纯煤段记忆放煤+煤岩分界模糊段人工反馈式干预放煤”的智能放煤控制策略;分析了大采高开采“采–运”协同智能耦合控制关键技术,构建了基于采煤机牵引速度与刮板输送机链速间联动调节的工作面装备间多机异构耦合自适应协同控制模型;研发了厚煤层开采中10 m超大采高液压支架,分析了厚煤层开采不断突破开采高度极限的新认识,从开采装备、控制系统等方面提出厚煤层一次开采高度的突破的研发方向。 展开更多
关键词 厚煤层开采 高端开采装备 支架–围岩耦合 大采高综采 大采高综放
下载PDF
两次采动影响下小煤柱巷道切顶卸压围岩控制技术 被引量:2
14
作者 李汉璞 张百胜 +2 位作者 郭俊庆 杨依卓 崔俊彪 《矿业安全与环保》 CAS 北大核心 2024年第2期90-97,共8页
为解决多次采动影响下留小煤柱巷道矿压显现剧烈、围岩变形量大的问题,提出了“切顶卸压+顶、帮锚索补强”联合控制技术。以贾家沟煤矿10115运输巷为工程背景,分析了切顶卸压位置、高度与巷道围岩垂直应力分布的关系,给出切顶卸压关键参... 为解决多次采动影响下留小煤柱巷道矿压显现剧烈、围岩变形量大的问题,提出了“切顶卸压+顶、帮锚索补强”联合控制技术。以贾家沟煤矿10115运输巷为工程背景,分析了切顶卸压位置、高度与巷道围岩垂直应力分布的关系,给出切顶卸压关键参数,并研究了留小煤柱巷道在切顶卸压后受两次采动影响下的矿压显现规律。结果表明:切顶卸压后,煤柱上的应力峰值随切顶深度的增加呈指数降低;10115运输巷在邻近工作面一次采动过程中巷道围岩变形依次呈现出无变形、缓慢变形、快速变形和围岩稳定的变化规律,本工作面二次采动过程中巷道围岩变形依次呈现出明显变形和剧烈变形的规律;巷道围岩在受二次采动影响时变形更加剧烈,巷道变形量为一次采动时的3.0~7.5倍。 展开更多
关键词 切顶卸压 小煤柱 矿压显现 二次采动 综放工作面 围岩控制
下载PDF
超大采高综采工作面支护技术及装备研究现状 被引量:1
15
作者 韩会军 王国法 +2 位作者 李明忠 张金虎 李艳鹏 《煤矿安全》 CAS 北大核心 2024年第5期213-221,共9页
超大采高一次采全厚开采具有开采效率高、资源回收率高等特点。为探求超大采高综采技术进一步突破,分析其工作面围岩稳定性控制可行性,在调研超大采高综采发展历程的基础上,总结了超大采高综采工作面围矿压显现及煤壁片帮规律,分析了现... 超大采高一次采全厚开采具有开采效率高、资源回收率高等特点。为探求超大采高综采技术进一步突破,分析其工作面围岩稳定性控制可行性,在调研超大采高综采发展历程的基础上,总结了超大采高综采工作面围矿压显现及煤壁片帮规律,分析了现有超大采高液压支架整体技术特征及其适用性能,并介绍了10 m超大采高工作面液压支架基本情况。通过分析发现:工作面矿压显现强度与采高基本呈现正相关关系,采高越大,工作面支护阻力越大,且煤壁片帮是困扰超大采高开采高效推进的主要因素之一,通过提高工作面液压支架的初撑能力能有效减小煤壁应力;液压支架随工作面采高增加,选型工作阻力增大,支架中心距加宽,大梯度过渡方式在提供可靠支护的同时,能有效提升端头区资源回收率;为适应大体量开采装备运输,超大采高工作面煤巷断面增加,超前支架工作阻力增大;工作面配套液压支架通过设计手段、整体结构、制造工艺等方面优化升级以提升可靠性及适应性;相对较低采高工作面支护,超大采高开采更注重支护过程中的安全技术需求,需要完善架前煤矸防护、架间防尘降尘、安全的后期维检等安全措施;工作面围岩稳定性控制及其配套装备是超大采高综采技术发展及推广的重点,从支护参数选择、支护结构设计到液压支架制造、后期维检的超大采高液压支架全寿命开发是支撑超大采高开采高效推进的基础。 展开更多
关键词 超大采高 高端液压支架 围岩稳定性控制 工作面支护 综采支护技术及装备
下载PDF
深部特厚煤层综放沿空掘巷煤柱优化及巷道支护 被引量:1
16
作者 彭林军 吴家遥 +3 位作者 何满潮 宫凯旋 陈东旭 徐顺钰 《西安科技大学学报》 CAS 北大核心 2024年第3期563-574,共12页
为研究深部大采高综放工作面窄煤柱沿空掘巷巷道矿压控制问题,以国能宁煤集团枣泉煤矿2^(-2)特厚煤层130203大采高综放工作面回风巷道为背景,基于实用矿山压力理论,建立了巷道围岩内、外应力场动态结构力学模型,运用理论计算和数值计算... 为研究深部大采高综放工作面窄煤柱沿空掘巷巷道矿压控制问题,以国能宁煤集团枣泉煤矿2^(-2)特厚煤层130203大采高综放工作面回风巷道为背景,基于实用矿山压力理论,建立了巷道围岩内、外应力场动态结构力学模型,运用理论计算和数值计算针对不同尺寸煤柱煤体应力对比分析,将原留设15 m护巷煤柱缩小至5 m进行了煤柱优化。结果表明:在稳定的内应力场掘巷有利于巷道的稳定性,避免了顶板事故及冲击地压相关灾害的发生,现场5 m小煤柱护巷工程应用中,130203回风巷道小煤柱侧变形量为1050 mm,实体煤帮变形量为400 mm,两帮呈现不对称性变形,底板局部底鼓量为1400 mm;深部特厚煤层综放开采沿空掘巷采用5 m小煤柱护巷方案设计正确,极大改善了巷道围岩的应力环境,整体设计满足生产要求,现场应用良好。130203工作面小煤柱沿空掘巷技术成功应用,为矿井开采提供了可靠的科学依据。 展开更多
关键词 深部特厚煤层 大采高综放开采 沿空巷道 煤柱优化 巷道支护
下载PDF
大采高工作面柔模沿空留墙掘巷技术
17
作者 刘文学 王晓利 +5 位作者 刘会会 曹晓凡 何斌 刘军峰 常庆 李昂 《西安科技大学学报》 CAS 北大核心 2024年第1期94-103,共10页
柔模混凝土沿空留巷技术已应用多年,在中厚煤层和薄煤层开采下均取得了较好的支护效果,但在厚煤层大采高工作面,因巷道高、巷旁支护压力大、混凝土早期强度低易受压损坏难以有效支撑顶板。大采高工作面矿压显现剧烈,巷旁维护难度大,故... 柔模混凝土沿空留巷技术已应用多年,在中厚煤层和薄煤层开采下均取得了较好的支护效果,但在厚煤层大采高工作面,因巷道高、巷旁支护压力大、混凝土早期强度低易受压损坏难以有效支撑顶板。大采高工作面矿压显现剧烈,巷旁维护难度大,故此提出一种新型的预浇墙柔模混凝土沿空留墙掘巷新技术,即在上工作面回采前,刷煤扩帮后提前预浇柔模混凝土墙体,提高煤帮整体支撑力的同时,解决柔模混凝土墙短期无法有效承载顶板来压的难题;待回采一定距离后,再沿墙滞后掘进下工作面回采巷道,且掘进方向与上工作面回采方向一致,缓解接续紧张,最终实现无煤柱开采。以王庄煤业3503工作面回采留设预浇墙为工程背景,建立了沿空留墙掘巷围岩结构力学模型,理论计算得出墙体力学支护参数,并通过现场应用验证了该技术的可实施性。结果表明:理论计算分析确定了墙体高宽比为5 m×1.5 m,混凝土强度C30即可满足留墙支护要求;沿墙掘进巷道总体变形量小,顶底板和两帮最大移近量仅为260 mm和125 mm,墙体最大受压18 MPa,小于墙体自身承载力;下工作面临近巷道掘进115 m后即趋于稳定。该技术应用全阶段效果良好,满足巷道使用要求,有效解决了大采高工作面沿空留巷重大技术难题,也可为相似工况无煤柱开采提供技术借鉴。 展开更多
关键词 沿空留墙掘巷 柔模混凝土 力学模型 大采高工作面 矿压监测
下载PDF
基于大尺寸工程模型的排尘系统实验及参数优化
18
作者 王晖 王宏伟 曹孟涛 《煤炭技术》 CAS 2024年第1期138-142,共5页
为解决某高瓦斯矿综掘面粉尘污染问题,通过COMSOL软件对压入式通风下粉尘于不同区域运移特性进行研究;选取3种排尘系统参数(风筒风速、压风距离、风筒悬挂高度),以进风侧、回风侧及掘进机操作台位置粉尘质量浓度为分析指标,借助大尺寸... 为解决某高瓦斯矿综掘面粉尘污染问题,通过COMSOL软件对压入式通风下粉尘于不同区域运移特性进行研究;选取3种排尘系统参数(风筒风速、压风距离、风筒悬挂高度),以进风侧、回风侧及掘进机操作台位置粉尘质量浓度为分析指标,借助大尺寸工程模型对每种参数下4个方案进行相似实验,优选排尘系统参数。结果表明:压风出口处负压影响下掘进机机尾存在粉尘回流,并于掘进机操作台处积聚;排尘系统参数以风筒风速16~20 m/s、压风距离8~11 m、风筒悬挂高度3.4~3.7 m设置时,掘进机操作台位置最大粉尘质量浓度降低49.02%,排尘40 min清除掘进机两侧96.58%浮尘,提升了压入式通风为基础的排尘系统抑尘效果及排尘效率。 展开更多
关键词 粉尘防治 综掘面 压入式通风 数值模拟 相似实验 大尺寸工程模型
下载PDF
综采面片帮冒顶机理及处理技术现状与展望 被引量:1
19
作者 郝彦李 陈加胜 +1 位作者 张艳飞 吕通 《江西煤炭科技》 2024年第1期11-14,共4页
综采工作面片帮冒顶后,为保证综采工作面安全快速通过片帮冒顶区域,采取高效的片帮冒顶处理技术是确保冒顶区域得到安全处置的重要手段。现有研究表明,采煤工作面片帮冒顶是受到煤岩应力分布、采动矿压分布、支架设备性能等多方面因素... 综采工作面片帮冒顶后,为保证综采工作面安全快速通过片帮冒顶区域,采取高效的片帮冒顶处理技术是确保冒顶区域得到安全处置的重要手段。现有研究表明,采煤工作面片帮冒顶是受到煤岩应力分布、采动矿压分布、支架设备性能等多方面因素的影响。总结了大倾角、大采高及松软煤层工作面片帮冒顶机理,分析归纳了片帮冒顶处理技术,分析了基于视觉感知、机器人的创新处理技术。总结现阶段学者研究成果中存在的问题,提出未来研究中需要突破的技术难点、需要深入研究的方向。 展开更多
关键词 综采工作面 片帮冒顶 大倾角 松软煤层 处理技术
下载PDF
大采高综采覆岩“两带”高度综合探测研究 被引量:1
20
作者 吉春平 《煤炭技术》 CAS 2024年第6期134-139,共6页
为获取大采高综采“两带”高度,促进煤炭资源安全、高效开采,以斜沟煤矿为工程背景,综合运用经验公式预估、现场试验探测和数值仿真计算,对18102工作面8#煤综采时的覆岩“两带”高度演化开展研究。结果表明:拟合得到的经验公式仅考虑了... 为获取大采高综采“两带”高度,促进煤炭资源安全、高效开采,以斜沟煤矿为工程背景,综合运用经验公式预估、现场试验探测和数值仿真计算,对18102工作面8#煤综采时的覆岩“两带”高度演化开展研究。结果表明:拟合得到的经验公式仅考虑了采厚因素影响,用于预测“两带”发育高度存在一定的局限性;现场钻探压水试验和瞬变电磁探测综合探测得到覆岩垮落带高度34.6 m,导水裂隙带高度74.8 m;分析了大采高综采时覆岩破坏高度、围岩应力场变化和位移场变化,“两带”高度数值计算结果与试验探测结果吻合良好。研究结果可为类似条件矿山的顶板管理、露头防(隔)水煤岩柱留设等提供参考。 展开更多
关键词 “两带”高度 综采大采高 厚煤层 覆岩破坏