Similar material simulation test W9-15 101 fully mechanized caving face with was carried out in a geological model of large mining height in the Liuhuanggou Colliery, in Xinjiang Uigur Autonomous Region. The roof over...Similar material simulation test W9-15 101 fully mechanized caving face with was carried out in a geological model of large mining height in the Liuhuanggou Colliery, in Xinjiang Uigur Autonomous Region. The roof overlying strata movement law in the stope of a fully mechanized caving face with large mining height was studied and show that the roof overlying strata in the stope of a fully mechanized caving face with large mining height can be formed into a stable arch structure; the fracture rock beam is formed resembling a "bond beam", but it has essentially the structure of "multi-span beams" under the big structure of the stable arch. The roof overlying strata movement law in the stope of a fully mechanized caving face with large mining height is similar to that of the common, fully mechanized caving stope, which is determined by the deformation and instability of the structure of "multi-span beams". But because of the differences between the mining heights, the peak pressure in the stope of a fully mechanized caving face with large mining height is smaller while the affected area of abutment pressure is wider in the front of the working face; this is the obvious difference in abutment pressure between the stope of a fully mechanized caving face with large mining height and that of the common.展开更多
According to the cover rock caving features,the gob of fully mechanized caving face was divided into 3 zones: natural collected zone,pressure effecting zone and press stable zone.Based on these and the gob gas flow co...According to the cover rock caving features,the gob of fully mechanized caving face was divided into 3 zones: natural collected zone,pressure effecting zone and press stable zone.Based on these and the gob gas flow control equation,and considered the in- fluence to the mining fissured zone of gas drainage,also made use of CFD software,we found an not uniform 3D numerical model of gob gas seepage and got the gas emission law in gob of fully mechanized caving face (with or without discharge measures),and this can guide the engineering practice in some aspects.展开更多
The article introduced the key technology, mining process, and back-and-forth mining method for the caving working face of hard-thick coal seams in Datong mine, and researched this innovations process, optimized the s...The article introduced the key technology, mining process, and back-and-forth mining method for the caving working face of hard-thick coal seams in Datong mine, and researched this innovations process, optimized the systemic design and working face out-play, tried to perfect the caving mining technology of hard-thick coal seams further.展开更多
The variation of the stress in the bolted surrounding rocks structure of the roadway driven along goaf in a fully mechanized top coal caving face with moderate stable conditions are studied by using numerical calculat...The variation of the stress in the bolted surrounding rocks structure of the roadway driven along goaf in a fully mechanized top coal caving face with moderate stable conditions are studied by using numerical calculation. The essential deformation characteristics of the surrounding rocks in this kind of roadway are obtained and the key technology of bolting support used under these conditions is put forward.展开更多
Based on the fluid mechanics and mass transfer theory,a mathematical model of the spatial-temporal variation of gas was derived to avoid the gas accident caused by the main fan stopping ventilation under the condition...Based on the fluid mechanics and mass transfer theory,a mathematical model of the spatial-temporal variation of gas was derived to avoid the gas accident caused by the main fan stopping ventilation under the condition of intermittent ventilation in the tunnel.According to the actual parameters of the tunnel,a numerical calculation model was established.The spatial-temporal variation of gas concentration in the fully mechanized working face under the condition of intermittent ventilation was calculated by using the commercial package Fluent,and the correctness of the calculated results was verified by the actual monitoring data of the mine.Firstly,the gas concentration was calculated under different wind velocities at driving face in coal tunnel,and the result showed that the gas can be carried effectively by the wind when the wind velocity is about 1.8 m/s.Secondly,the distributions of wind velocity and gas concentration at driving face were studied at 1.8 m/s,and the result showed the gas concentration increased gradually with the distance close to the outlet,but the gas concentration almost kept constant at the height of driving face.Thirdly,the distribution of gas concentration was investigated with time after the ventilation was stopped and restarted,respectively.The gas concentration of test point gradually increased with the increment of downtime,when the downtime was 40 min,the gas concentration of test point 3 reached the maximum value.The gas concentration increased gradually and reached the maximum after10 min of restart,then sharply decreased and kept constant.展开更多
In order to prevent spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines in China, we have analyzed the characteristics of spontaneous coal combustion and explain ...In order to prevent spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines in China, we have analyzed the characteristics of spontaneous coal combustion and explain theoretically the factors affecting spontaneous coal combustion, such as rock bursts, high temperatures, high ventilation resistance, slow advancing speed and large obliquity mining. Key technologies to prevent spontaneous combustion occurring in sharply inclined seams in deep mines are pro- posed; these include pouring water, stopping leakage in upper and lower comers of the working face, choking off the goaf and cov- eting the coal. CO concentrations were controlled within two years to less than 15×10^-6 at the upper comer by applying these tech- nologies at the 1410 working face of the Huafeng coal mine. Our method has significant theoretical value and is of practical impor- tance in controlling spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines.展开更多
Abstract On the basis of analyzing floor strata mechanical circumstance of the roadway, the mechanical model was established. The relative displacement of roadway floor, narrow pillar floor coal mass and floor strata ...Abstract On the basis of analyzing floor strata mechanical circumstance of the roadway, the mechanical model was established. The relative displacement of roadway floor, narrow pillar floor coal mass and floor strata was calculated, the results showed that the high abutment pressure on coal mass beside the roadway was the main reason to lead to relative displacement of floor strata. And the roadway floor heave come mainly from three aspects. Firstly, the roadway floor strata is easily fractured by the stretch stress. Secondly, because the high abutment pressure is greater than the uniaxial compressive strength of floor strata, when the roadway floor strata are fractured, the coal mass floor strata at the same depth will be fractured, and broken rock will fluid into the open roadway. Thirdly, comparing with the coal mass floor, the roadway floor is relative ascending.展开更多
The stability control of gob-side entry retaining in fully mechanized caving face is a typical challenge in many coal mines in China.The rotation and subsidence of the lateral cantilever play a critical role in a coal...The stability control of gob-side entry retaining in fully mechanized caving face is a typical challenge in many coal mines in China.The rotation and subsidence of the lateral cantilever play a critical role in a coal mine,possibly leading to instability in a coal seam wall or a gob-side wall due to its excessive rotation subsidence.Hence,the presplitting blasting measures in the roof was implemented to cut down the lower main roof and convert it to caved immediate roof strata,which can significantly reduce the rotation space for the lateral cantilever and effectively control its rotation.Firstly,the compatible deformation model was established to investigate the quantitative relationship between the deformation of the coal seam wall and the gob-side wall and the subsidence of the lateral cantilever.Then,the instability judgments for the coal seam wall and gob-side wall were revealed,and the determination method for the optimal roof cutting height were obtained.Furthermore,The Universal Distinct Element Code numerical simulation was adopted to investigate the effect of roof-cutting height on the stability of the retained entry.The numerical simulation results indicated that the deformation of the roadway could be effectively controlled when the roofcutting height reached to 18 m,which verified the theoretical deduction well.Finally,a field application was performed at the No.3307 haulage gateway in the Tangan coal mine,Ltd.,Shanxi Province,China.The field monitoring results showed that the blasting roof cutting method could effectively control the large deformation of surrounding rocks,which provided helpful references for coal mine safety production under similar conditions.展开更多
At a fully mechanized working face of a coal mine as prototype,we investigated,by simulation,the flow field and dust distribution during the process of its isolation by a curtain of air,using the CFD software, Fluent....At a fully mechanized working face of a coal mine as prototype,we investigated,by simulation,the flow field and dust distribution during the process of its isolation by a curtain of air,using the CFD software, Fluent.The results show that the air curtain installed on the shearer can effectively prevent the dust (especially the respirable dust)from diffusing into the work area of the operator,reducing the dust concentration on the side of the operator and greatly improving his working environment.The field application of the air curtain shows that the dust-isolation effect of an air curtain is quite noticeable.The isolation efficiency for respiratory dust is over 70%and,as well,it has good dust-isolation effect for nonrespiratory dust.The air curtain is a useful way to resolve the problem of dust-isolation at a fully mechanized working face.It has a practical background elsewhere with more extensive applications.展开更多
Under the action of abutment pressure in front of fully mechanized coal face with sublevel caving(CFSC),top-coal over CFSC deformed.In the process of whole de- formation of top-coal,it changed from continuum elastic m...Under the action of abutment pressure in front of fully mechanized coal face with sublevel caving(CFSC),top-coal over CFSC deformed.In the process of whole de- formation of top-coal,it changed from continuum elastic mass to non-continuum plastic mass contained fissures,become a loose body.According to its bearing characteristics and mechanical properties,top-coal mass can be divided into four deformation zones along the winning direction of CFSC,i.e.initial stress zone,elastic zone,plastic zone and loose zone.Top-coal in plastic zone located in the post-peak zone of the stress-strain curve for top-coal.With equivalent strain principle of damage mechanics and mathemati- cal theory of statistic,combining the movement law of top-coal,set up a constitutive equa- tion with damage statistics for top-coal in different position in CFSC.The equation illus- trated the mathematical relationship among top-coal bearing capacity,horizontal confining pressure along the winning direction of CFSC and mechanical properties of top-coal mate- rial.The conclusions not only provide a basis for numerical computer simulations on damage deformation and failure mechanism for top-coal,but also further promote the ap- plication of damage mechanics in CFSC.展开更多
In order to obtain the distribution rules of abutment pressure around the 1151 (3) fully mechanized top-coal caving (FMTC) face of Xieqiao Colliery, the KSE-II-1 type bore-hole stress gauges were installed in the ...In order to obtain the distribution rules of abutment pressure around the 1151 (3) fully mechanized top-coal caving (FMTC) face of Xieqiao Colliery, the KSE-II-1 type bore-hole stress gauges were installed in the tailentry and headentry to measure the mining-induced stress. The distribution rules of the front and side abutment pressure were demonstrated. The results show that distribution rules of stress are obviously different in the vicinity of the face and entries. The peak value of abutment pressure in the protective coal pillar and face are located commonly in front of the working face along the strike, and they are located at the stress-decreased zone near the face. There is no stress peak value in the lateral coal mass beside the headentry in front of the face on the strike, and the peak value of abutment pressure appears at the rear area of the face. There are stress peak values both in the protective coal pillar and in the lateral coal mass beside the headentry to the dip.展开更多
Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order...Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order to improve the top-coal recovery ratio of fully mechanized cave mining with large mining height, a study was conducted on optimizing the caving process, based on the mechanized caving face 1302N in Longgu Coal Mine. This was achieved by improving the PFC numerical calculation methods, and establishing a more accurate model system. On this basis, the recovery ratio of the top coal in different drawing intervals and technologies was investigated in order to achieve a reasonable caving process. The top-coal tracking system was used for practical surveying of the recovery ratio of top coal.展开更多
It is difficult to accurately calculate the lump coal rate in a fully mechanized mining face.Therefore,a numerical simulation of the coal wall cutting process,which revealed the crack expansion,development,evolution i...It is difficult to accurately calculate the lump coal rate in a fully mechanized mining face.Therefore,a numerical simulation of the coal wall cutting process,which revealed the crack expansion,development,evolution in the coal body and the corresponding lump coal formation mechanism,was performed in PFC2D.Moreover,a correlation was established between the cutting force and lump coal formation,and a statistical analysis method was proposed to determine the lump coal rate.The following conclusions are drawn from the results:(1)Based on a soft ball model,a coal wall cutting model is established.By setting the roller parameters based on linear bonding and simulating the roller cutting process of the coal body,the coal wall cutting process is effectively simulated,and accurate lump coal rate statistics are provided.(2)Under the cutting stress,the coal body in the working face underwent three stages—microfracture generation,fracture expansion,and fracture penetration—to form lump coal,in which the fracture direction is orthogonal to the cutting pressure chain.Within a certain range from the roller,as the cutting depth of the roller increased,the number of new fractures in the coal body first increases and then stabilizes.(3)Under the cutting stress,the fractured coal body is locally compressed,thereby forming a compact core.The formation and destruction of the compact core causes fluctuations in the cutting force.The fluctuation amplitude is positively related to the coal mass.(4)Because the simulation does not consider secondary damage in the coal,the simulated lump coal rate is larger than the actual lump coal rate in the working face;this deviation is mainly concentrated in large lump coal with a diameter greater than 300 mm.展开更多
The matching relationship between coal cutting and caving in fully mechanized top-coal caving face is analyzed in detail from the angle of reliability. The coupling equation of reliability is established corresponding...The matching relationship between coal cutting and caving in fully mechanized top-coal caving face is analyzed in detail from the angle of reliability. The coupling equation of reliability is established correspondingly, and the mathematical equation of the coefficient of velocity matching of coal cutting and caving is obtained, which meets a certain reliability demand for making the working procedure of coal caving not influence coal cutting of coal-cutter. The results show that the relationship between the coefficient of the velocity matching and the reliability of coal cutting and caving system is linear on the whole when R <0.9. It is pointed out that different numerical value should be selected for different coal face according to different demand for reliability.展开更多
According to a lot of practical data in Liujialiang Mine and reliability theory and result of computer simulation, operation regularity of fully mechanized sublevel caving mining production system in the condition of ...According to a lot of practical data in Liujialiang Mine and reliability theory and result of computer simulation, operation regularity of fully mechanized sublevel caving mining production system in the condition of gently inclined complicated geological structure and production shortcomings are found out and reliability of system and output of the working face are predicted finally.展开更多
In the background of the technology condition and the geological condition of the 1151(3) fully mechanized top-coal caving face (FMTC face), and by means of taking nonlinear 3D numerical simulation, the stress red...In the background of the technology condition and the geological condition of the 1151(3) fully mechanized top-coal caving face (FMTC face), and by means of taking nonlinear 3D numerical simulation, the stress redistribution rules of top coal with different thick coal seam were obtained by investigation on the numerical simulation of the redistributions of the stress with different coal seam's thickness. The research showes that there exists a certain difference on the stress distributions of the top coal at face, the maximum principal stress is located near to the tailentry's corner. The vertical stress's peak of the top coal decreases and the distance ahead of face position increases as the once mining thickness of the coal seam increases. At the same coal seam, the vertical stresses' peak of top coal gradually decreases from the top to the bottom, the peak's position is basically the same and its changes are gradually obvious with the thickness of coal seam increas- ing. The vertical stress of top coal places in a low stress state at a certain range ahead of face and over the face, which reveals the essence that the support loads are generally low under the condition of FMTC. The study supplies the theoretical foundation for the support design and selection, the theory of top coal's fragmentation, the movement rules of top coal and improving the recovery of top coal.展开更多
基金Supported by National Natural Science Fundation of China(50674045)
文摘Similar material simulation test W9-15 101 fully mechanized caving face with was carried out in a geological model of large mining height in the Liuhuanggou Colliery, in Xinjiang Uigur Autonomous Region. The roof overlying strata movement law in the stope of a fully mechanized caving face with large mining height was studied and show that the roof overlying strata in the stope of a fully mechanized caving face with large mining height can be formed into a stable arch structure; the fracture rock beam is formed resembling a "bond beam", but it has essentially the structure of "multi-span beams" under the big structure of the stable arch. The roof overlying strata movement law in the stope of a fully mechanized caving face with large mining height is similar to that of the common, fully mechanized caving stope, which is determined by the deformation and instability of the structure of "multi-span beams". But because of the differences between the mining heights, the peak pressure in the stope of a fully mechanized caving face with large mining height is smaller while the affected area of abutment pressure is wider in the front of the working face; this is the obvious difference in abutment pressure between the stope of a fully mechanized caving face with large mining height and that of the common.
基金the National Natural Science Foundation Project of China(505740720)the Natural Science Foundation Project of Shaanxi Province(2006E203)
文摘According to the cover rock caving features,the gob of fully mechanized caving face was divided into 3 zones: natural collected zone,pressure effecting zone and press stable zone.Based on these and the gob gas flow control equation,and considered the in- fluence to the mining fissured zone of gas drainage,also made use of CFD software,we found an not uniform 3D numerical model of gob gas seepage and got the gas emission law in gob of fully mechanized caving face (with or without discharge measures),and this can guide the engineering practice in some aspects.
基金Supported by the Production Safety and Supervision of Management Bureau of China(04-116) the Returned Overseas Scholar Fund of Educational Department of China(2003406)+1 种基金 the Soft Science Planning Program of Shandong Province(A200423-6) the National Soft Science Planed Program (2004DGQ3D090)
文摘The article introduced the key technology, mining process, and back-and-forth mining method for the caving working face of hard-thick coal seams in Datong mine, and researched this innovations process, optimized the systemic design and working face out-play, tried to perfect the caving mining technology of hard-thick coal seams further.
文摘The variation of the stress in the bolted surrounding rocks structure of the roadway driven along goaf in a fully mechanized top coal caving face with moderate stable conditions are studied by using numerical calculation. The essential deformation characteristics of the surrounding rocks in this kind of roadway are obtained and the key technology of bolting support used under these conditions is put forward.
基金funded by the National Natural Science Foundation of China (No. 51776217)the Fundamental Research Funds for the Central Universities of China (No. 2013XK08.2)
文摘Based on the fluid mechanics and mass transfer theory,a mathematical model of the spatial-temporal variation of gas was derived to avoid the gas accident caused by the main fan stopping ventilation under the condition of intermittent ventilation in the tunnel.According to the actual parameters of the tunnel,a numerical calculation model was established.The spatial-temporal variation of gas concentration in the fully mechanized working face under the condition of intermittent ventilation was calculated by using the commercial package Fluent,and the correctness of the calculated results was verified by the actual monitoring data of the mine.Firstly,the gas concentration was calculated under different wind velocities at driving face in coal tunnel,and the result showed that the gas can be carried effectively by the wind when the wind velocity is about 1.8 m/s.Secondly,the distributions of wind velocity and gas concentration at driving face were studied at 1.8 m/s,and the result showed the gas concentration increased gradually with the distance close to the outlet,but the gas concentration almost kept constant at the height of driving face.Thirdly,the distribution of gas concentration was investigated with time after the ventilation was stopped and restarted,respectively.The gas concentration of test point gradually increased with the increment of downtime,when the downtime was 40 min,the gas concentration of test point 3 reached the maximum value.The gas concentration increased gradually and reached the maximum after10 min of restart,then sharply decreased and kept constant.
基金Projects 2007B53 supported by the Foundation for National Excellent Doctoral Dissertation of ChinaBK2008123 by the Natural Science Foundation of Jiangsu Province
文摘In order to prevent spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines in China, we have analyzed the characteristics of spontaneous coal combustion and explain theoretically the factors affecting spontaneous coal combustion, such as rock bursts, high temperatures, high ventilation resistance, slow advancing speed and large obliquity mining. Key technologies to prevent spontaneous combustion occurring in sharply inclined seams in deep mines are pro- posed; these include pouring water, stopping leakage in upper and lower comers of the working face, choking off the goaf and cov- eting the coal. CO concentrations were controlled within two years to less than 15×10^-6 at the upper comer by applying these tech- nologies at the 1410 working face of the Huafeng coal mine. Our method has significant theoretical value and is of practical impor- tance in controlling spontaneous coal combustion occurring at a fully mechanized caving face with large obliquity in deep mines.
文摘Abstract On the basis of analyzing floor strata mechanical circumstance of the roadway, the mechanical model was established. The relative displacement of roadway floor, narrow pillar floor coal mass and floor strata was calculated, the results showed that the high abutment pressure on coal mass beside the roadway was the main reason to lead to relative displacement of floor strata. And the roadway floor heave come mainly from three aspects. Firstly, the roadway floor strata is easily fractured by the stretch stress. Secondly, because the high abutment pressure is greater than the uniaxial compressive strength of floor strata, when the roadway floor strata are fractured, the coal mass floor strata at the same depth will be fractured, and broken rock will fluid into the open roadway. Thirdly, comparing with the coal mass floor, the roadway floor is relative ascending.
基金supported by National Natural Science Foundation of China(Nos.51734009,51904290)the Natural Science Foundation of Jiangsu Province,China(BK20180663).
文摘The stability control of gob-side entry retaining in fully mechanized caving face is a typical challenge in many coal mines in China.The rotation and subsidence of the lateral cantilever play a critical role in a coal mine,possibly leading to instability in a coal seam wall or a gob-side wall due to its excessive rotation subsidence.Hence,the presplitting blasting measures in the roof was implemented to cut down the lower main roof and convert it to caved immediate roof strata,which can significantly reduce the rotation space for the lateral cantilever and effectively control its rotation.Firstly,the compatible deformation model was established to investigate the quantitative relationship between the deformation of the coal seam wall and the gob-side wall and the subsidence of the lateral cantilever.Then,the instability judgments for the coal seam wall and gob-side wall were revealed,and the determination method for the optimal roof cutting height were obtained.Furthermore,The Universal Distinct Element Code numerical simulation was adopted to investigate the effect of roof-cutting height on the stability of the retained entry.The numerical simulation results indicated that the deformation of the roadway could be effectively controlled when the roofcutting height reached to 18 m,which verified the theoretical deduction well.Finally,a field application was performed at the No.3307 haulage gateway in the Tangan coal mine,Ltd.,Shanxi Province,China.The field monitoring results showed that the blasting roof cutting method could effectively control the large deformation of surrounding rocks,which provided helpful references for coal mine safety production under similar conditions.
基金Financial support for this work,provided by the National Natural Science Foundation of China(No.50974060)the State Safety Production Science and Technology Development Plan (No.06-396)
文摘At a fully mechanized working face of a coal mine as prototype,we investigated,by simulation,the flow field and dust distribution during the process of its isolation by a curtain of air,using the CFD software, Fluent.The results show that the air curtain installed on the shearer can effectively prevent the dust (especially the respirable dust)from diffusing into the work area of the operator,reducing the dust concentration on the side of the operator and greatly improving his working environment.The field application of the air curtain shows that the dust-isolation effect of an air curtain is quite noticeable.The isolation efficiency for respiratory dust is over 70%and,as well,it has good dust-isolation effect for nonrespiratory dust.The air curtain is a useful way to resolve the problem of dust-isolation at a fully mechanized working face.It has a practical background elsewhere with more extensive applications.
基金the National Natural Science Foundation of China(40638040/D0214,50534070/E04)
文摘Under the action of abutment pressure in front of fully mechanized coal face with sublevel caving(CFSC),top-coal over CFSC deformed.In the process of whole de- formation of top-coal,it changed from continuum elastic mass to non-continuum plastic mass contained fissures,become a loose body.According to its bearing characteristics and mechanical properties,top-coal mass can be divided into four deformation zones along the winning direction of CFSC,i.e.initial stress zone,elastic zone,plastic zone and loose zone.Top-coal in plastic zone located in the post-peak zone of the stress-strain curve for top-coal.With equivalent strain principle of damage mechanics and mathemati- cal theory of statistic,combining the movement law of top-coal,set up a constitutive equa- tion with damage statistics for top-coal in different position in CFSC.The equation illus- trated the mathematical relationship among top-coal bearing capacity,horizontal confining pressure along the winning direction of CFSC and mechanical properties of top-coal mate- rial.The conclusions not only provide a basis for numerical computer simulations on damage deformation and failure mechanism for top-coal,but also further promote the ap- plication of damage mechanics in CFSC.
基金Supported by the National Natural Science Foundation of Anhui Province (K J2010A090)
文摘In order to obtain the distribution rules of abutment pressure around the 1151 (3) fully mechanized top-coal caving (FMTC) face of Xieqiao Colliery, the KSE-II-1 type bore-hole stress gauges were installed in the tailentry and headentry to measure the mining-induced stress. The distribution rules of the front and side abutment pressure were demonstrated. The results show that distribution rules of stress are obviously different in the vicinity of the face and entries. The peak value of abutment pressure in the protective coal pillar and face are located commonly in front of the working face along the strike, and they are located at the stress-decreased zone near the face. There is no stress peak value in the lateral coal mass beside the headentry in front of the face on the strike, and the peak value of abutment pressure appears at the rear area of the face. There are stress peak values both in the protective coal pillar and in the lateral coal mass beside the headentry to the dip.
文摘Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order to improve the top-coal recovery ratio of fully mechanized cave mining with large mining height, a study was conducted on optimizing the caving process, based on the mechanized caving face 1302N in Longgu Coal Mine. This was achieved by improving the PFC numerical calculation methods, and establishing a more accurate model system. On this basis, the recovery ratio of the top coal in different drawing intervals and technologies was investigated in order to achieve a reasonable caving process. The top-coal tracking system was used for practical surveying of the recovery ratio of top coal.
基金The funding was supported by National Natural Science Foundation of China(No.51974294).
文摘It is difficult to accurately calculate the lump coal rate in a fully mechanized mining face.Therefore,a numerical simulation of the coal wall cutting process,which revealed the crack expansion,development,evolution in the coal body and the corresponding lump coal formation mechanism,was performed in PFC2D.Moreover,a correlation was established between the cutting force and lump coal formation,and a statistical analysis method was proposed to determine the lump coal rate.The following conclusions are drawn from the results:(1)Based on a soft ball model,a coal wall cutting model is established.By setting the roller parameters based on linear bonding and simulating the roller cutting process of the coal body,the coal wall cutting process is effectively simulated,and accurate lump coal rate statistics are provided.(2)Under the cutting stress,the coal body in the working face underwent three stages—microfracture generation,fracture expansion,and fracture penetration—to form lump coal,in which the fracture direction is orthogonal to the cutting pressure chain.Within a certain range from the roller,as the cutting depth of the roller increased,the number of new fractures in the coal body first increases and then stabilizes.(3)Under the cutting stress,the fractured coal body is locally compressed,thereby forming a compact core.The formation and destruction of the compact core causes fluctuations in the cutting force.The fluctuation amplitude is positively related to the coal mass.(4)Because the simulation does not consider secondary damage in the coal,the simulated lump coal rate is larger than the actual lump coal rate in the working face;this deviation is mainly concentrated in large lump coal with a diameter greater than 300 mm.
文摘The matching relationship between coal cutting and caving in fully mechanized top-coal caving face is analyzed in detail from the angle of reliability. The coupling equation of reliability is established correspondingly, and the mathematical equation of the coefficient of velocity matching of coal cutting and caving is obtained, which meets a certain reliability demand for making the working procedure of coal caving not influence coal cutting of coal-cutter. The results show that the relationship between the coefficient of the velocity matching and the reliability of coal cutting and caving system is linear on the whole when R <0.9. It is pointed out that different numerical value should be selected for different coal face according to different demand for reliability.
文摘According to a lot of practical data in Liujialiang Mine and reliability theory and result of computer simulation, operation regularity of fully mechanized sublevel caving mining production system in the condition of gently inclined complicated geological structure and production shortcomings are found out and reliability of system and output of the working face are predicted finally.
文摘In the background of the technology condition and the geological condition of the 1151(3) fully mechanized top-coal caving face (FMTC face), and by means of taking nonlinear 3D numerical simulation, the stress redistribution rules of top coal with different thick coal seam were obtained by investigation on the numerical simulation of the redistributions of the stress with different coal seam's thickness. The research showes that there exists a certain difference on the stress distributions of the top coal at face, the maximum principal stress is located near to the tailentry's corner. The vertical stress's peak of the top coal decreases and the distance ahead of face position increases as the once mining thickness of the coal seam increases. At the same coal seam, the vertical stresses' peak of top coal gradually decreases from the top to the bottom, the peak's position is basically the same and its changes are gradually obvious with the thickness of coal seam increas- ing. The vertical stress of top coal places in a low stress state at a certain range ahead of face and over the face, which reveals the essence that the support loads are generally low under the condition of FMTC. The study supplies the theoretical foundation for the support design and selection, the theory of top coal's fragmentation, the movement rules of top coal and improving the recovery of top coal.