期刊文献+
共找到23篇文章
< 1 2 >
每页显示 20 50 100
Distribution laws of abutment pressure around fully mechanized top-coal caving face by in-situ measurement 被引量:2
1
作者 CHANG Ju-cai 《Journal of Coal Science & Engineering(China)》 2011年第1期1-5,共5页
In order to obtain the distribution rules of abutment pressure around the 1151 (3) fully mechanized top-coal caving (FMTC) face of Xieqiao Colliery, the KSE-II-1 type bore-hole stress gauges were installed in the ... In order to obtain the distribution rules of abutment pressure around the 1151 (3) fully mechanized top-coal caving (FMTC) face of Xieqiao Colliery, the KSE-II-1 type bore-hole stress gauges were installed in the tailentry and headentry to measure the mining-induced stress. The distribution rules of the front and side abutment pressure were demonstrated. The results show that distribution rules of stress are obviously different in the vicinity of the face and entries. The peak value of abutment pressure in the protective coal pillar and face are located commonly in front of the working face along the strike, and they are located at the stress-decreased zone near the face. There is no stress peak value in the lateral coal mass beside the headentry in front of the face on the strike, and the peak value of abutment pressure appears at the rear area of the face. There are stress peak values both in the protective coal pillar and in the lateral coal mass beside the headentry to the dip. 展开更多
关键词 fully mechanized top-coal caving face abutment pressure in-situ measurement
下载PDF
Reliability analysis of the velocity matching of coal cutting and caving in fully mechanized top-coal caving face
2
作者 罗善明 缪协兴 《Journal of Coal Science & Engineering(China)》 2002年第1期68-72,共5页
The matching relationship between coal cutting and caving in fully mechanized top-coal caving face is analyzed in detail from the angle of reliability. The coupling equation of reliability is established corresponding... The matching relationship between coal cutting and caving in fully mechanized top-coal caving face is analyzed in detail from the angle of reliability. The coupling equation of reliability is established correspondingly, and the mathematical equation of the coefficient of velocity matching of coal cutting and caving is obtained, which meets a certain reliability demand for making the working procedure of coal caving not influence coal cutting of coal-cutter. The results show that the relationship between the coefficient of the velocity matching and the reliability of coal cutting and caving system is linear on the whole when R <0.9. It is pointed out that different numerical value should be selected for different coal face according to different demand for reliability. 展开更多
关键词 fully mechanized top-coal caving face velocity matching of coal cutting and caving reliability
下载PDF
Top-coal deformation control of gob-side entry with narrow pillars and its application for fully mechanized mining face 被引量:3
3
作者 Qi Fangkun Zhou Yuejin +3 位作者 Li Jiawei Wang Erqian Cao Zhengzheng Li Ning 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第3期417-422,共6页
A mechanical model to control the top-coal deformation is established in accordance with the structural characters of the gob-side entry surrounding rock for the fully-mechanic top-coal caving; the analytical solution... A mechanical model to control the top-coal deformation is established in accordance with the structural characters of the gob-side entry surrounding rock for the fully-mechanic top-coal caving; the analytical solution of top coal roof-sag curve is deduced with Winkler elastic foundation beam model. By means of a calculating and analytic program, the top coal roof-sag values are calculated under the conditions of different supporting intensities, widths of narrow pillars and stiffness of top coal; meanwhile, the relationship between the roof-sag values and supporting intensity, width of narrow pillars and stiffness of top coal is analyzed as well. With the actual situation of the gob-side entry taken into consideration, the parameters of top-coal control are determined and a supporting plan is proposed for the top-coal control,which is proved to be reliable and effective by on-site verification. Some theoretical guidance and advice are put forward for the top-coal deformation control in gob-side entry for fully mechanized top-coal caving face. 展开更多
关键词 fully mechanized top-coal caving Narrow pillar Gob-side entry Top coal Deformation control
下载PDF
Technological optimization of fully mechanized caving mining face with large mining heights 被引量:1
4
作者 Lu-Jia FAN Sheng-Li YANG 《Journal of Coal Science & Engineering(China)》 2013年第3期290-294,共5页
Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order... Fully mechanized cave mining with large mining height is a new mining method, due to its large mining thickness and lower roadway excavation, the technology has been widely used in China's thick seam mining. In order to improve the top-coal recovery ratio of fully mechanized cave mining with large mining height, a study was conducted on optimizing the caving process, based on the mechanized caving face 1302N in Longgu Coal Mine. This was achieved by improving the PFC numerical calculation methods, and establishing a more accurate model system. On this basis, the recovery ratio of the top coal in different drawing intervals and technologies was investigated in order to achieve a reasonable caving process. The top-coal tracking system was used for practical surveying of the recovery ratio of top coal. 展开更多
关键词 fully mechanized caving face large mining height caving process optimization numerical calculation by PFC top-coal tracking system
下载PDF
Analysis of factors of top coal caving in fully mechanized sublevel caving face in soft coal and control
5
作者 藏传伟 何富连 《Journal of Coal Science & Engineering(China)》 2007年第3期301-305,共5页
According to the analysis of the mechanism of top coal caving, the caving condition was pointed out, and many factors of caving were also determined. Then the relationship between factors and caving was studied. Based... According to the analysis of the mechanism of top coal caving, the caving condition was pointed out, and many factors of caving were also determined. Then the relationship between factors and caving was studied. Based on the above research, one effective method by using field monitoring was brought forward to determine the controlling factor. Then some related key technologies were provided, such as keeping the integrality of the top-coal, raising the horizontal resistance of supports and decreasing the real end-face distance etc.. At last one application of this method was presented, and it was proved to be an effective method. 展开更多
关键词 fully mechanized sublevel caving method in soft coals top-coal caving in the end-face caving arch field monitoring control of the end-face
下载PDF
Investigation on the stress field characteristic of top coal at FMTC faces under the influence of caving thickness 被引量:5
6
作者 谢广祥 常聚才 杨科 《Journal of Coal Science & Engineering(China)》 2007年第2期123-125,共3页
In the background of the technology condition and the geological condition of the 1151(3) fully mechanized top-coal caving face (FMTC face), and by means of taking nonlinear 3D numerical simulation, the stress red... In the background of the technology condition and the geological condition of the 1151(3) fully mechanized top-coal caving face (FMTC face), and by means of taking nonlinear 3D numerical simulation, the stress redistribution rules of top coal with different thick coal seam were obtained by investigation on the numerical simulation of the redistributions of the stress with different coal seam's thickness. The research showes that there exists a certain difference on the stress distributions of the top coal at face, the maximum principal stress is located near to the tailentry's corner. The vertical stress's peak of the top coal decreases and the distance ahead of face position increases as the once mining thickness of the coal seam increases. At the same coal seam, the vertical stresses' peak of top coal gradually decreases from the top to the bottom, the peak's position is basically the same and its changes are gradually obvious with the thickness of coal seam increas- ing. The vertical stress of top coal places in a low stress state at a certain range ahead of face and over the face, which reveals the essence that the support loads are generally low under the condition of FMTC. The study supplies the theoretical foundation for the support design and selection, the theory of top coal's fragmentation, the movement rules of top coal and improving the recovery of top coal. 展开更多
关键词 fully mechanized top-coal caving face thickness of coal seam top coal stress field
下载PDF
Caving thickness effects of surrounding rocks macro stress shell evolving characteristics 被引量:1
7
作者 XIE Guang-xiang YANG Ke 《Journal of Coal Science & Engineering(China)》 2009年第2期188-192,共5页
In order to explore the influence of different caving thicknesses on the MSS distributionand evolving characteristics of surrounding rocks in unsymmetrical disposal andfully mechanized top-coal caving (FMTC),based on ... In order to explore the influence of different caving thicknesses on the MSS distributionand evolving characteristics of surrounding rocks in unsymmetrical disposal andfully mechanized top-coal caving (FMTC),based on unsymmetrical disposal characteristics,the analyses of numerical simulation,material simulation and in-situ observation weresynthetically applied according to the geological and technical conditions of the 1151(3)working face in Xieqiao Mine.The results show that the stress peak value of the MSS-baseand the ratio of MSS-body height to caving thickness are nonlinear and inverselyproportional to the caving thickness.The MSS-base width,the MSS-body height,theMSS-base distance to working face wall and the rise distance of MSS-base beside coalpillar are nonlinear and directly proportional to the caving thickness.The characteristics ofMSS distribution and its evolving rules of surrounding rocks and the integrated cavingthickness effects are obtained.The investigations will provide lots of theoretic referencesto the surrounding rocks' stability control of the working face and roadway,roadway layout,gas extraction and exploitation,and efficiency of caving,etc. 展开更多
关键词 caving thickness effect macro stress shell evolving characteristic fully mechanized top-coal caving unsymmetrical disposal
下载PDF
Mating model on production capacity for the system of cutting coal and drawing top-coal in FMMSC
8
作者 翟新献 《Journal of Coal Science & Engineering(China)》 2007年第2期113-117,共5页
Being a safe and highly-efficient mining method, fully mechanized mining with sublevel caving (FMMSC) was extensively employed in Chinese coal mines with thick seam. In order to make drawing top-coal furthest to par... Being a safe and highly-efficient mining method, fully mechanized mining with sublevel caving (FMMSC) was extensively employed in Chinese coal mines with thick seam. In order to make drawing top-coal furthest to parallel work with shearer cutting coal, decrease failure ratio of rear scraper conveyor and increase safe production capacity of equipments, based on production technology, set up the mating model of safe production capacity of equipments for the system of drawing top-coal and shearer cutting coal in coal face with sublevel caving. It is mean capability of drawing top-coal adapted to the capability of shearer cutting coal in a working circle in the coal face that was deduced. The type selection of equipment of rear scraper conveyor can be tackled with this mating model. The model was applied in FMMSC in Yangcun Coal Mine, Yima Coal Group of China. With the mating light-equipments, the coal output in coal face attained 1.05 Mt in 2004. It gained better technical-economic benefit. 展开更多
关键词 coal mine coal face fully mechanized mining with sublevel caving (FMMSC) system of curing coal and drawing top-coal mating equipments
下载PDF
综放工作面粉尘场与雾滴场耦合关系的实验研究 被引量:36
9
作者 周刚 程卫民 +1 位作者 王刚 崔向飞 《煤炭学报》 EI CAS CSCD 北大核心 2010年第10期1660-1664,共5页
为了得到综放工作面雾滴场与其捕获的粉尘场之间的定量关系,根据模拟综放工作面通风风速的封闭式实验箱,设计了由供水系统、供风系统、测粒系统、测压系统、测尘系统、发尘系统等组成的综放工作面粉尘场与雾滴场耦合关系测试实验平台。... 为了得到综放工作面雾滴场与其捕获的粉尘场之间的定量关系,根据模拟综放工作面通风风速的封闭式实验箱,设计了由供水系统、供风系统、测粒系统、测压系统、测尘系统、发尘系统等组成的综放工作面粉尘场与雾滴场耦合关系测试实验平台。采用三维激光多普勒粒子动态分析仪对包括直射喷嘴、单式离心喷嘴、混合式离心喷嘴等目前煤矿普遍使用的六大类压力喷嘴进行了尘雾场耦合实验,即在风机开启时,分别测定释放尘源前后的雾滴粒径,利用Matlab数值分析方法,得到了雾滴粒径在[40,65]、[65,100]、[100,160]μm等3个区间内无尘液滴平均粒径与其捕获尘粒平均粒径之间的拟和函数表达式。提出针对呼吸性粉尘的雾滴最佳捕尘粒径应为[15,70]μm,实现了对喷雾降尘理论的改进与完善。 展开更多
关键词 综放工作面 粉尘场 雾滴场 耦合实验 释放尘源 捕尘粒径
下载PDF
富水顶板综放工作面出水规律与高位关键层破断特征分析 被引量:6
10
作者 刘前进 霍永金 娄金福 《中国煤炭》 北大核心 2015年第1期39-43,共5页
针对崔木煤矿富水顶板特厚煤层综放工作面在限厚开采条件下,仍然频繁出现的出水和压架问题,分析了上覆关键层破断与工作面出水的关系,认为21303工作面导水裂隙带的发育高度受高位厚硬岩层亚关键层Ⅰ的控制,最大发育高度为185m。工作面... 针对崔木煤矿富水顶板特厚煤层综放工作面在限厚开采条件下,仍然频繁出现的出水和压架问题,分析了上覆关键层破断与工作面出水的关系,认为21303工作面导水裂隙带的发育高度受高位厚硬岩层亚关键层Ⅰ的控制,最大发育高度为185m。工作面出水具有周期性,且出水周期性与亚关键层Ⅰ周期性破断有关,出水在形式上可以分为直线型导通和折线型导通两种。在初次和周期性出水期间伴随着工作面强矿压显现。 展开更多
关键词 综放工作面 富水顶板 高位关键层 导水裂隙带 出水周期
下载PDF
Dimensionless model to determine spontaneous combustion danger zone in the longwall gob
11
作者 ZHANG Xin-hai DENG Jun WEN Hu 《西安科技大学学报》 CAS 北大核心 2011年第6期649-654,共6页
According to spontaneous combustion propensity,the longwall gob is divided into three zones,including heat dissipation zone,self-heating zone and the choking zone.Only in the self-heating zone can temperature of coal ... According to spontaneous combustion propensity,the longwall gob is divided into three zones,including heat dissipation zone,self-heating zone and the choking zone.Only in the self-heating zone can temperature of coal rise due to oxidation.Studying the distribution of the "Three Zones" in gob is important for predicting and preventing spontaneous combustion in coalmine.In normal mining operations,temperature of coal is roughly constant.The process of mass transfer in the gob is considered to be steady.Based on mass conservation,gas species conservation,darcy's law,Ficks law of diffusion and coal oxidation 1-grade reaction rule,governing equation for air leakage intensity and species concentration are deduced.With critical value of coal spontaneous combustion and the size of longwall workface as basic dimension,a dimensionless steady coupled model of air flow diffusion and chemical reaction in loose coal of Fully Mechanized Top-Coal Caving Mining Workface(FMTCCMW) is setup.By solving the model numerically,regulation of three zones' distribution and spontaneous combustion in the gob can be obtained.The results can be easily popularized to prediction of spontaneous combustion in other coalmines' longwall gob. 展开更多
关键词 fully mechanized top-coal caving workface spontaneous combustion dimensionless model
下载PDF
“三软”4.5m厚煤层综放工作面回采巷道布置方式
12
作者 张周权 夏书贵 《煤炭科技》 2000年第3期18-19,共2页
介绍了“三软”4 .5m厚煤层综放工作面回采巷道布置方式的选择依据 ,对不同层位回采巷道的支护效果进行了对比和分析 ,得出了明确的结论 ,并提出了相应的配套措施。
关键词 “三软”厚煤层 回采巷道 布置方式 综放工作面
下载PDF
石圪节综放面风水喷雾降尘试验分析 被引量:1
13
作者 陈永文 韩武学 +1 位作者 李晓宏 常红联 《煤》 2000年第5期27-28,50,共3页
介绍了 2 30 7综放面风水喷雾降尘系统试验方案设计 ,对降尘效果进行了评价 ,分析了采煤机割煤粉尘来源及分布 ,探讨了风水喷雾降尘原理 ,阐述了影响喷雾降尘的主要因素 ,并对试验方案提出进一步改进措施 ;通过现场初步试验 ,证明风水... 介绍了 2 30 7综放面风水喷雾降尘系统试验方案设计 ,对降尘效果进行了评价 ,分析了采煤机割煤粉尘来源及分布 ,探讨了风水喷雾降尘原理 ,阐述了影响喷雾降尘的主要因素 ,并对试验方案提出进一步改进措施 ;通过现场初步试验 ,证明风水喷雾降尘效果良好 ,有效地改善了综放面的工作条件 ;组合式风水喷雾器结构合理 ,使用方便 ,压力风增加了喷雾器水出口的动能 ,提高了雾化效果 ,能有效地将粉尘捕获 ,从而起到降尘的作用。 展开更多
关键词 综放面 风水喷雾 降尘 试验分析 喷雾器
下载PDF
综放工作面对接延长实践
14
作者 张银禄 王春宪 申进才 《煤》 2002年第1期27-28,共2页
通过26043综放工作面的对接,减少了地质构造的影响,提高了资源采出率,并取得了明显的技术经济效益,为类似条件的综放工作面设计、回采提供了经验,具有较好的社会效益。
关键词 地质构造 综放工作面 对接技术 资源采出率 经济效益 对接间隙
下载PDF
调斜旋转回采工艺在大倾角综放工作面的应用 被引量:5
15
作者 王强 《煤》 2003年第2期15-16,23,共3页
根据综放工作面输送机下窜的原因进行分析 ,采取调斜旋转回采工艺成功地将工作面调整至克服输送机下滑的伪倾斜位置 。
关键词 综放工作面 输送机下窜 调斜旋转回采工艺 地质 支架 切眼
下载PDF
综放工作面三角煤失稳原因及控制措施探讨 被引量:3
16
作者 董跃文 《煤矿现代化》 2018年第4期103-104,共2页
文章首先对8206工作面开机率进行了计算分析,然后提出采煤工作面端头三角煤维护效率低是导致当前采煤机开机率不高的一大重要因素。通过分析三角煤失稳定原因,最后提出了维护端头三角煤的措施。
关键词 综放工作面 采煤机开机率 端头维护
下载PDF
Analysis on characteristics of damaged field of surrounding rock and face of FMTC
17
作者 XIE Guang-xiang WANG Lei LUO Yong 《Journal of Coal Science & Engineering(China)》 2010年第2期120-124,共5页
Numerical simulation-FLAC^(3D) and equivalent material simulation were carried out to analyze the damaged patterns and lows, distribution of plastic width of face, and surrounding rock of FMTC during the advance of wo... Numerical simulation-FLAC^(3D) and equivalent material simulation were carried out to analyze the damaged patterns and lows, distribution of plastic width of face, and surrounding rock of FMTC during the advance of work face with different thick coal seams based on engineering geology and exploitation technology of 1151(3) fully mechanized top-coal caving (FMTC) face in Xieqiao Colliery.The results show that there is damage,and the destruction characteristics of surrounding rock and coal mass are different obviously in asymmetric exploitation layout.The damaged zone in surrounding rock and the coal of the return airway is larger than that of the intake airway.Moreover, the retained coal pillars are all damaged by tension and shear fracture, and plastic zone in coal mass in the dip direction ahead of Face is nonuniform.There are large damage zones in roof and floor strata, surrounding rock, and coal of return and intake airways near work face.The damaged zone in the upper part of Face is larger than that in middle and lower parts.The fruits of this paper are of guiding significance for engineering practices, such as support design and choice, roadway supporting and maintaining, rock pressure control of FMTC face, etc. 展开更多
关键词 fully mechanized top-coal caving(FMTC) coal mass surrounding rock damaged field plastic width
下载PDF
综放工作面综合预防自燃发火的措施
18
作者 马少寅 《煤炭技术》 CAS 2006年第12期70-71,共2页
对综采放顶煤工作面自燃发火的原因进行了分析,阐述了所采取的综合性预防措施,及取得了良好的效果。
关键词 综采工作面 放顶煤 自燃发火
下载PDF
锚杆锚索联合支护在综放面沿空掘巷中的应用
19
作者 路超元 《煤》 2004年第1期8-9,11,共3页
综放面的底煤巷由于顶帮压力大,难于支护,巷道维护工作量大,采用传统的棚式支护无法满足安全、生产要求,而锚杆支护以其主动支护、及时支护、支护阻力大的特点,在煤巷中得到了广泛的推广和应用。尤其是在顶帮压力较大的巷道中,锚杆支护... 综放面的底煤巷由于顶帮压力大,难于支护,巷道维护工作量大,采用传统的棚式支护无法满足安全、生产要求,而锚杆支护以其主动支护、及时支护、支护阻力大的特点,在煤巷中得到了广泛的推广和应用。尤其是在顶帮压力较大的巷道中,锚杆支护的优越性得到了充分的体现,保证了巷道支护的稳定性和回采的快速推进。 展开更多
关键词 锚杆 锚索 联合支护 综放面 沿空掘巷 煤巷
下载PDF
高瓦斯综放工作面瓦斯综合治理技术及其应用
20
作者 何志国 刘钊 《能源与节能》 2017年第6期188-189,192,共3页
叙述了伯方煤矿3302综放工作面现有情况,分析了本煤层预抽、边采边抽、顶板长距离定向钻孔抽放、上隅角埋管抽放、风排瓦斯等瓦斯综合治理技术措施及其应用。这些措施取得了很好的抽放效果,有效解决了工作面回采时瓦斯超限问题,保障了... 叙述了伯方煤矿3302综放工作面现有情况,分析了本煤层预抽、边采边抽、顶板长距离定向钻孔抽放、上隅角埋管抽放、风排瓦斯等瓦斯综合治理技术措施及其应用。这些措施取得了很好的抽放效果,有效解决了工作面回采时瓦斯超限问题,保障了工作面的正常、安全生产,取得了良好的经济效益和社会效益,为今后瓦斯治理提供了理论依据。 展开更多
关键词 综放工作面 瓦斯综合治理 定向钻孔 上隅角瓦斯抽放
下载PDF
上一页 1 2 下一页 到第
使用帮助 返回顶部