With the investigation of the current situation of tourism activities and characteristics of recreational tourism spatial layout in Huaihua,problems in tourism spatial layout are pointed out,that is,indistinct divisio...With the investigation of the current situation of tourism activities and characteristics of recreational tourism spatial layout in Huaihua,problems in tourism spatial layout are pointed out,that is,indistinct division of tourism functions,comparatively bad relevance in the "point-axle" spatial structure,and comparatively bad horizontal and vertical coherence in tourism space.It is suggested to rationally construct tourism spatial layout in Huaihua City after the model of spatial layered structure of recreational sightseeing,that is,the model of setting Huaihua City as the center,and from the inside out with three layers of recreational island within the city,recreational sites around the city and recreational sites at towns and villages away from the city through the spatial layout of point,axis and plane.展开更多
Under the background of stereotyped urban planning and construction and the pursuit of high land value,it is particularly important to explore the application of urban environmental characteristics in urban design and...Under the background of stereotyped urban planning and construction and the pursuit of high land value,it is particularly important to explore the application of urban environmental characteristics in urban design and highlight the integration of local characteristics and people’s life.In this paper,based on the origin of Fengshui theory and the planning points of an ideal Fengshui pattern,the planning and design of Shengming Kangyuan Area in Liyang were studied to explore the positive influence of Fengshui theory in the construction of urban space,and some planning suggestions were put forward to improve the urban environment and achieve harmony and unity between man and the natural environment.展开更多
Taizhou is an economically-developed port city on the golden coastline of China, characterized by typical coastal and combined green cores, mountains and waters, and special plants. This paper analyzed natural conditi...Taizhou is an economically-developed port city on the golden coastline of China, characterized by typical coastal and combined green cores, mountains and waters, and special plants. This paper analyzed natural conditions and city features of Taizhou, assessed current construction of local urban forests, and proposed pertinent construction concepts in view of diversifi ed needs of urban development on forest construction. On the basis of the city development, principles of urban forest layout were put forward, and the overall structure of "one core, one belt, two rings, three corridors, four groups, fi ve windows, and multiple bases" was given for the construction of urban forest in coastal landscape cities, in addition, the effect and feasibility of the layout were analyzed.展开更多
Meta-heuristic algorithms proved to find optimal solutions for combinatorial problems in many domains. Nevertheless, the efficiency of these algorithms highly depends on their parameter settings. In fact, finding appr...Meta-heuristic algorithms proved to find optimal solutions for combinatorial problems in many domains. Nevertheless, the efficiency of these algorithms highly depends on their parameter settings. In fact, finding appropriate settings of the algorithm’s parameters is considered to be a nontrivial task and is usually set manually to values that are known to give reasonable performance. In this paper, Ant Colony Optimization with Parametric Analysis (ACO-PA) is developed to overcome this drawback. The main feature of the ACO-PA is the ability of deciding the appropriate parameter values within the predefined parameter variations. Besides, a new approach which enables the pheromone information value to be proportional to the heuristic information value is introduced. The effectiveness of the proposed algorithm is investigated through the application of the algorithm to the construction site layout problems taken from the state-of-art. Results show that the ACO-PA can reduce transportation cost up to 16.8% compared to the site layouts generated by Genetic Algorithms and basic ACO. Moreover, the effects of parameter settings on the generated solutions are investigated.展开更多
It is difficult to analyze the inter-relationship for the construction layout of a reservoir project scientifically and intuitively.According to the characteristics of broad field and huge information,the modeling met...It is difficult to analyze the inter-relationship for the construction layout of a reservoir project scientifically and intuitively.According to the characteristics of broad field and huge information,the modeling methods of digital terrain and solid model as well as the techniques of texture mapping and scene navigation are adopted.The simulation system is developed by C program language,which includes the functions of the interactive navigation of 3D scene,the visual inquiry of project digital model information,the storage and management of project information.A certain reservoir is taken as a case.The 3D visual analysis for the construction layout and engineering information are obtained.The proposed system is of great advantages in dealing with large amount of information and the method provides a theoretical basis and technical support for the construction layout of a reservoir project.展开更多
In the construction of Three Gorges Project, the total amount of concrete is about 28 Mm\+3 , and the total amount of metal works and reinforcement is approximately 0.72 Mt . The TGP is constructed in 3 stages . The p...In the construction of Three Gorges Project, the total amount of concrete is about 28 Mm\+3 , and the total amount of metal works and reinforcement is approximately 0.72 Mt . The TGP is constructed in 3 stages . The preparation period together with the first stage is 5 years , the second stage and third stage are both 6 years .In the second stage construction of 6 years (1998~2003) , there are 18.46 Mm\+3 of concrete to be placed and 0.192 Mt of metal works and embedded parts for mechanical and electric equipment to be installed . In 1999, a world record of annual concrete placement of 4.585 Mm\+3 was set . In 2000, it is planned to place 5.4 Mm\+3 of concrete and to install 38 000 t of metal works . Construction equipments and layout of construction site , concrete production and its temperature control, metal works, mechanical and electric equipments in the second stage construction are presented.展开更多
At the beginning of 21st century, with the rapid and steady development of China economy, a lot of large scale hydropower projects with large dams from 200 m to 300 m high are being or to be built. China dam construct...At the beginning of 21st century, with the rapid and steady development of China economy, a lot of large scale hydropower projects with large dams from 200 m to 300 m high are being or to be built. China dam constructions are reaching the level of 300 m high arch dam, 250 high CFRD (concrete face rockfill dam) and 200 m high RCC (roller compacted concrete) gravity dam. Due to the safety and the economy, the type selection for high dams has become the key issue during the argumentation for the hydropower projects, and further efforts are still needed in this aspect for high dams. After reviewing the high dam constructions in China and abroad, authors proposed some advices for the selection of dam types, and hope that it can provide some helpful information for the researches and the design of high dams.展开更多
Bridge bearings are a small part of the whole bridge structure,but it can affect the corner of the bridge,and the stability and quality of the bridge deck,so the performance of the bridge bearing can directly determin...Bridge bearings are a small part of the whole bridge structure,but it can affect the corner of the bridge,and the stability and quality of the bridge deck,so the performance of the bridge bearing can directly determine the quality and lifespan of the entire bridge.The bridge bearing connects the upper and lower parts of the whole bridge.In order to improve the quality and structure of the whole bridge,the layout and selection of bridge bearings needs to be done well,the construction process needs to be closely monitored,and the whole process needs to be well-managed.The existing problems should be analyzed in detail and solved in time to ensure the quality of the bridge project.展开更多
基金Supported by Scientific Research Programs of Huaihua University(HHUY2008-30)~~
文摘With the investigation of the current situation of tourism activities and characteristics of recreational tourism spatial layout in Huaihua,problems in tourism spatial layout are pointed out,that is,indistinct division of tourism functions,comparatively bad relevance in the "point-axle" spatial structure,and comparatively bad horizontal and vertical coherence in tourism space.It is suggested to rationally construct tourism spatial layout in Huaihua City after the model of spatial layered structure of recreational sightseeing,that is,the model of setting Huaihua City as the center,and from the inside out with three layers of recreational island within the city,recreational sites around the city and recreational sites at towns and villages away from the city through the spatial layout of point,axis and plane.
文摘Under the background of stereotyped urban planning and construction and the pursuit of high land value,it is particularly important to explore the application of urban environmental characteristics in urban design and highlight the integration of local characteristics and people’s life.In this paper,based on the origin of Fengshui theory and the planning points of an ideal Fengshui pattern,the planning and design of Shengming Kangyuan Area in Liyang were studied to explore the positive influence of Fengshui theory in the construction of urban space,and some planning suggestions were put forward to improve the urban environment and achieve harmony and unity between man and the natural environment.
文摘Taizhou is an economically-developed port city on the golden coastline of China, characterized by typical coastal and combined green cores, mountains and waters, and special plants. This paper analyzed natural conditions and city features of Taizhou, assessed current construction of local urban forests, and proposed pertinent construction concepts in view of diversifi ed needs of urban development on forest construction. On the basis of the city development, principles of urban forest layout were put forward, and the overall structure of "one core, one belt, two rings, three corridors, four groups, fi ve windows, and multiple bases" was given for the construction of urban forest in coastal landscape cities, in addition, the effect and feasibility of the layout were analyzed.
文摘Meta-heuristic algorithms proved to find optimal solutions for combinatorial problems in many domains. Nevertheless, the efficiency of these algorithms highly depends on their parameter settings. In fact, finding appropriate settings of the algorithm’s parameters is considered to be a nontrivial task and is usually set manually to values that are known to give reasonable performance. In this paper, Ant Colony Optimization with Parametric Analysis (ACO-PA) is developed to overcome this drawback. The main feature of the ACO-PA is the ability of deciding the appropriate parameter values within the predefined parameter variations. Besides, a new approach which enables the pheromone information value to be proportional to the heuristic information value is introduced. The effectiveness of the proposed algorithm is investigated through the application of the algorithm to the construction site layout problems taken from the state-of-art. Results show that the ACO-PA can reduce transportation cost up to 16.8% compared to the site layouts generated by Genetic Algorithms and basic ACO. Moreover, the effects of parameter settings on the generated solutions are investigated.
基金Supported by the Science Fund for Creative Research Groups of National Natural Science Foundation of China(No.51021004)Tianjin Research Program of Application Foundation and Advanced Technology(No.12JCZDJC29200)National Key Technology R and D Program in the 12th Five-Year Plan of China(No.2011BAB10B06)
文摘It is difficult to analyze the inter-relationship for the construction layout of a reservoir project scientifically and intuitively.According to the characteristics of broad field and huge information,the modeling methods of digital terrain and solid model as well as the techniques of texture mapping and scene navigation are adopted.The simulation system is developed by C program language,which includes the functions of the interactive navigation of 3D scene,the visual inquiry of project digital model information,the storage and management of project information.A certain reservoir is taken as a case.The 3D visual analysis for the construction layout and engineering information are obtained.The proposed system is of great advantages in dealing with large amount of information and the method provides a theoretical basis and technical support for the construction layout of a reservoir project.
文摘In the construction of Three Gorges Project, the total amount of concrete is about 28 Mm\+3 , and the total amount of metal works and reinforcement is approximately 0.72 Mt . The TGP is constructed in 3 stages . The preparation period together with the first stage is 5 years , the second stage and third stage are both 6 years .In the second stage construction of 6 years (1998~2003) , there are 18.46 Mm\+3 of concrete to be placed and 0.192 Mt of metal works and embedded parts for mechanical and electric equipment to be installed . In 1999, a world record of annual concrete placement of 4.585 Mm\+3 was set . In 2000, it is planned to place 5.4 Mm\+3 of concrete and to install 38 000 t of metal works . Construction equipments and layout of construction site , concrete production and its temperature control, metal works, mechanical and electric equipments in the second stage construction are presented.
文摘At the beginning of 21st century, with the rapid and steady development of China economy, a lot of large scale hydropower projects with large dams from 200 m to 300 m high are being or to be built. China dam constructions are reaching the level of 300 m high arch dam, 250 high CFRD (concrete face rockfill dam) and 200 m high RCC (roller compacted concrete) gravity dam. Due to the safety and the economy, the type selection for high dams has become the key issue during the argumentation for the hydropower projects, and further efforts are still needed in this aspect for high dams. After reviewing the high dam constructions in China and abroad, authors proposed some advices for the selection of dam types, and hope that it can provide some helpful information for the researches and the design of high dams.
文摘Bridge bearings are a small part of the whole bridge structure,but it can affect the corner of the bridge,and the stability and quality of the bridge deck,so the performance of the bridge bearing can directly determine the quality and lifespan of the entire bridge.The bridge bearing connects the upper and lower parts of the whole bridge.In order to improve the quality and structure of the whole bridge,the layout and selection of bridge bearings needs to be done well,the construction process needs to be closely monitored,and the whole process needs to be well-managed.The existing problems should be analyzed in detail and solved in time to ensure the quality of the bridge project.