A dissertation is a research report or scientific paper written by an author to obtain a certain degree. It reflects postgraduates’ research achievements and the educational quality of an institute, even a country. T...A dissertation is a research report or scientific paper written by an author to obtain a certain degree. It reflects postgraduates’ research achievements and the educational quality of an institute, even a country. To construct an optimized quality evaluation system for postgraduate dissertation (QESPD), we summarized the influencing factors and invited 10 experienced specialists to rate and prioritize them based on fuzzy analytic hierarchy process. Four primary indicators (innovation, integrity, scientificity and normativity) and 16 sub-indicators were selected to form the evaluation system. The order of primary indicators by weight, was innovation (0.4269), scientificity (0.2807), integrity (0.1728) and normativity (0.1196). The top five sub-dimensions were theoretical originality, scientific value, data reliability, design rationality and evidence credibility. To demonstrate the effectiveness of the proposed system, a case study was performed. In the case study, it was demonstrated that the established two-index-hierarchy QESPD in this study was a more scientific and reasonable evaluation system worthy of promotion and application.展开更多
In operation,risk arising from power transformer faults is of much uncertainty and complicacy.To timely and objectively control the risks,a transformer risk assessment method based on fuzzy analytic hierarchy process(...In operation,risk arising from power transformer faults is of much uncertainty and complicacy.To timely and objectively control the risks,a transformer risk assessment method based on fuzzy analytic hierarchy process(FAHP) and artificial neural network(ANN) from the perspective of accuracy and quickness is proposed.An analytic hierarchy process model for the transformer risk assessment is built by analysis of the risk factors affecting the transformer risk level and the weight relation of each risk factor in transformer risk calculation is analyzed by application of fuzzy consistency judgment matrix;with utilization of adaptive ability and nonlinear mapping ability of the ANN,the risk factors with large weights are used as input of neutral network,and thus intelligent quantitative assessment of transformer risk is realized.The simulation result shows that the proposed method increases the speed and accuracy of the risk assessment and can provide feasible decision basis for the transformer risk management and maintenance decisions.展开更多
Casing corrosion during CO2 injection or storage results in significant economic loss and increased production risks.Therefore,in this paper,a corroded casing risk assessment model based on analytic hierarchy process ...Casing corrosion during CO2 injection or storage results in significant economic loss and increased production risks.Therefore,in this paper,a corroded casing risk assessment model based on analytic hierarchy process and fuzzy comprehensive evaluation is established to identify potential risks in time.First,the corrosion rate and residual strength characteristics are analyzed through corrosion tests and numerical simulations,respectively,to determine the risk factors that may lead to an accident.Then,an index system for corroded casing risk evaluation is established based on six important factors:temperature,CO2 partial pressure,flow velocity,corrosion radius,corrosion depth and wellhead pressure.Subsequently,the index weights are calculated via the analytic hierarchy process.Finally,the risk level of corroded casing is obtained via the fuzzy comprehensive evaluation.The corroded casing risk assessment model has been verified by a case well,which shows that the model is valuable and feasible.It provides an effective decision-making method for the risk evaluation of corroded casing in CO2 injection well,which is conductive to improve the wellbore operation efficiency.展开更多
Recently, plant construction throughout the world, including nuclear power plant construction, has grown significantly. The scale of Korea’s nuclear power plant construction in particular, has increased gradually sin...Recently, plant construction throughout the world, including nuclear power plant construction, has grown significantly. The scale of Korea’s nuclear power plant construction in particular, has increased gradually since it won a contract for a nuclear power plant construction project in the United Arab Emirates in 2009. However, time and monetary resources have been lost in some nuclear power plant construction sites due to lack of risk management ability. The need to prevent losses at nuclear power plant construction sites has become more urgent because it demands professional skills and large-scale resources. Therefore, in this study, the Analytic Hierarchy Process (AHP) and Fuzzy Analytic Hierarchy Process (FAHP) were applied in order to make comparisons between decision-making methods, to assess the potential risks at nuclear power plant construction sites. To suggest the appropriate choice between two decision-making methods, a survey was carried out. From the results, the importance and the priority of 24 risk factors, classified by process, cost, safety, and quality, were analyzed. The FAHP was identified as a suitable method for risk assessment of nuclear power plant construction, compared with risk assessment using the AHP. These risk factors will be able to serve as baseline data for risk management in nuclear power plant construction projects.展开更多
As a difficult problem, sidewall instability has been beset drilling workers all the time. Not only does it cause huge economic losses, but also it determines the success or failure of drilling engineering. Due to com...As a difficult problem, sidewall instability has been beset drilling workers all the time. Not only does it cause huge economic losses, but also it determines the success or failure of drilling engineering. Due to complex relationship between various factors which influence sidewall stability, it hasn’t been found a widely applied method to predicate sidewall stability so far. Therefore, in order to formulate corresponding measures to ensure successful drilling, searching for a kind of better method to forecast sidewall stability before drilling becomes an imperative and significant topic for drilling engineering. On the basis of traditional sidewall stability analytical method, we have put forward the Fuzzy Comprehensive Evaluation Method to forecast sidewall stability regulation using physico-chemical performance parameters of the clay mineral. This method has been improved by introducing the Analytic Hierarchy Process (AHP) and the Maximum Subjection Principle in the application process. After introducing Analytic Hierarchy Process to identify weight, and Maximum Subjection Principle to obtain evaluation results, it has reduced the influence of human factors and enhanced the accuracy of the fuzzy evaluation results. The application in Hailaer Area indicates that this method can predict sidewall stability of gas-oil well with high credibility and strong practicability.展开更多
Geographic Information System (GIS) software was used to create a watershed vulnerability model for Bernalillo County, New Mexico. Watershed vulnerability was investigated as a function of soil erosion and infiltratio...Geographic Information System (GIS) software was used to create a watershed vulnerability model for Bernalillo County, New Mexico. Watershed vulnerability was investigated as a function of soil erosion and infiltration criteria: precipitation, land slope, soil erodibility (K-factor), vegetation cover (NDVI), land use, drainage density, saturated hydraulic conductivity, and hydrologic soil group. Respective criteria weights were derived using a Fuzzy Analytic Hierarchy Process (FAHP) supported by expert opinion. A survey of 10 experts, representing New Mexico Institute of Mining and Technology (NMT), the New Mexico Bureau of Geology and Mineral Resources (NMBGMR), and the United States Geologic Survey (USGS), provided model input data for an integrated pair-wise comparison matrix for soil erosion and for infiltration. Individual criteria weights were determined by decomposing the respective fuzzy synthetic extent matrix using the centroid method. GIS layers were then combined based on criteria weights to produce maps of soil erosion potential and infiltration potential. A composite watershed vulnerability map was generated by equal weighting of each input map. Model results were categorized into five vulnerability categories: not vulnerable (N), slightly vulnerable (SV), moderately vulnerable (MV), highly vulnerable (HV), and extremely vulnerable (EV). The resulting FAHP/GIS model was used to generate a watershed vulnerability map of discrete areas in Bernalillo County, which may be vulnerable to stormwater run-off events and soil erosion. Such high volume run-off events can cause erosion damage to property and infrastructure. Alternatively, in areas near urban development, stormwater run-off may contribute non-point-source pollutant contamination of New Mexico’s surface water resources. The most problematic areas in Bernalillo County are present in the Eastern and Northwestern portions. However, less than 1% of the total area lies within the lowest and highest vulnerability categories with the majority centered around moderate vulnerability. The results of the model were compared with a previously published crisp AHP method. Both methods showed similar regional vulnerability trends. This MCDS/GIS approach is intended to provide support to local governments and decision makers in selection of suitable structural or nonstructural stormwater control measures.展开更多
The optimal selection of schemes of water transportation projects is a process of choosing a relatively optimal scheme from a number of schemes of water transportation programming and management projects, which is of ...The optimal selection of schemes of water transportation projects is a process of choosing a relatively optimal scheme from a number of schemes of water transportation programming and management projects, which is of importance in both theory and practice in water resource systems engineering. In order to achieve consistency and eliminate the dimensions of fuzzy qualitative and fuzzy quantitative evaluation indexes, to determine the weights of the indexes objectively, and to increase the differences among the comprehensive evaluation index values of water transportation project schemes, a projection pursuit method, named FPRM-PP for short, was developed in this work for selecting the optimal water transportation project scheme based on the fuzzy preference relation matrix. The research results show that FPRM-PP is intuitive and practical, the correction range of the fuzzy rained is both stable and accurate; preference relation matrix A it produces is relatively small, and the result obtherefore FPRM-PP can be widely used in the optimal selection of different multi-factor decision-making schemes.展开更多
In order to solve the problem that determining decision factors weights is of subjectivity in heterogeneous wireless network selection algorithm, a network selection algorithm based on extension theory and fuzzy analy...In order to solve the problem that determining decision factors weights is of subjectivity in heterogeneous wireless network selection algorithm, a network selection algorithm based on extension theory and fuzzy analytic hierarchy process (FAHP) is proposed in this paper. In addition, user and operator codetermine the optimal network using the proposed algorithm, which can give consideration to user and operator benefits. The fuzzy judgment matrix is coustructed by membership degree of decision factors which is calculated according to extension theory. The comprehensive weight of each decision factor is obtained using FAHP. Finally, the optimal network is selected through total property value ranldng of each candidate network under user preference and operator preference. The simulation results show that the proposed algorithm can select the optimal network efficiently and accurately, satisfy user preference, and implement load balance between networks.展开更多
Sale-leaseback is paid special focus on for its great application in China in recent years.By giving a detailed analysis,an analysis of the features of sale-leaseback and a study of the risks of it are given in this p...Sale-leaseback is paid special focus on for its great application in China in recent years.By giving a detailed analysis,an analysis of the features of sale-leaseback and a study of the risks of it are given in this paper.Then a quantitative analysis of commercial real estate sale-leaseback is carried out.The scientific theoretical analysis is provided in this paper for risk assessment in commercial real estate sale-leaseback mode in China.An effective approach is put forward for sale-leaseback project evaluation and prevention of risk.A useful means is given to supervise commerciai real estate sale-leaseback mode for relevant departments and a certain contribution is made to a further sound development of commercial real estate sale-leaseback mode.展开更多
For a more accurate and comprehensive assessment of the trustworthiness of component-based soft- ware system, the fuzzy analytic hierarchy process is introduced to establish the analysis model. Combine qualitative and...For a more accurate and comprehensive assessment of the trustworthiness of component-based soft- ware system, the fuzzy analytic hierarchy process is introduced to establish the analysis model. Combine qualitative and quantitative analyses, the impacts to overall trustworthiness by the different types of components are distinguished. Considering the coupling relationship between components, dividing the system into several layers from target layer to scheme layer, evaluating the scheme advantages disadvantages by group decision-making, the trustworthiness of a typical J2EE structured component-based software is assessed. The trustworthiness asses model of the software components provides an effective methods of operation.展开更多
Generally, mine roads are located in the mountain areas, as its complex topography, mostly along the river near the cliffs, steep bend anxious, the mine road design has to adopt lower technical standards relatively an...Generally, mine roads are located in the mountain areas, as its complex topography, mostly along the river near the cliffs, steep bend anxious, the mine road design has to adopt lower technical standards relatively and usually is lack of traffic safety facilities. Especially, there are mainly medium-sized vehicles on mine road, under the heavy traffic vehicles affect repeatedly, high frequency of traffic accidents more easily happen in mine road area and cause serious effects on life or property. Combining with the particularity of mine road safety environment, this paper studies the basic theory of safety evaluation, analyses the factors of traffic safety design and special mine terrain conditions, and then establishes mine road safety index system and evaluation model based on the principles such as systematicness, independent indexes, qualitative and quantitative analysis, feasibility, scientificity and reliability. At last, the paper successfully evaluates the safety of road in Huang Mailing phosphate rock area with fuzzy AHP method based on engineering project.展开更多
Bridge quality assessment is an important part in the final acceptance of new bridge construction,and it is also the main basis for the reinforcement or removal of old bridges.We evaluated the weight of each affecting...Bridge quality assessment is an important part in the final acceptance of new bridge construction,and it is also the main basis for the reinforcement or removal of old bridges.We evaluated the weight of each affecting factor to the upper events using progressive analytical hierarchy process(AHP)with the adoption of 3 scaling,reduced the calculation in analytical process,and precluded the nonuniformity of the scaling system.We obtained a comprehensive evaluation system of bridge quality, and verified its pra...展开更多
The index system, code system, and weights of indexes are established to assess the effects of green construction. The index system consists of index level, factor level and sub-factor level. The analytic hierarchy pr...The index system, code system, and weights of indexes are established to assess the effects of green construction. The index system consists of index level, factor level and sub-factor level. The analytic hierarchy process is used to determine the weights of indexes, and the consistency test indicate that the weight assignment is reasonable. Using fuzzy synthetic judgment method, the assessment model is built, which includes factor set, weight set and conclusion set. An example is given to demonstrate the assessment procedures.展开更多
Risk assessment of distributed energy system often has uncertainty and subjective problems. The problems will have some impact on the results. To solve the problems, a method of improved fuzzy analytic hierarchy proce...Risk assessment of distributed energy system often has uncertainty and subjective problems. The problems will have some impact on the results. To solve the problems, a method of improved fuzzy analytic hierarchy process is proposed. By using the fuzzy analytic hierarchy process method, a hierarchical analysis model is established. And then according to the given judgment matrix of each index layer, we calculate whether it meets the consistency condition. And then if the judgment matrix does not meet the consistency condition, the problem will be solved by the improving of particle swarm optimization (PSO) with Kalman filter. The practice in the distributed energy system shows that the method can not only fully reflect the fuzziness of assessment elements and process, but also reduce the influence of individual subjective factors and better evaluation results can be achieved.展开更多
By analyzing the existing methods for the bridge bearing capacity assessment, an analytic hierarchy pro cess estimation model with a variable weight and fuzzy description is proposed based on the nondestructive infor ...By analyzing the existing methods for the bridge bearing capacity assessment, an analytic hierarchy pro cess estimation model with a variable weight and fuzzy description is proposed based on the nondestructive infor mation. Considering the actual strength, the bearing capacity is first calculated from its design state, and then modified based on the detection information. The modification includes the section reduction and the structure deterioration. The section reduction involves the concrete section and the steel cross-section reduction. The structure deterioration is decided by six factors, i.e. , the concrete surface damage, the actual concrete strength, the steel corrosion electric potential, the chloride ion content, the carbonization depth, and the protective layer depth. The initial weight of each factor is calculated by the expert judgment matrix using an analytic hierarchy process. The consistency approximation and the error transfer theory are used. Then, the variable weight is in- troduced to expand the influences of factors in the worse state. Finally, an actual bridge is taken as an example to verify the proposed method. Results show that the estimated capacity agrees well with that of the load test, thus the method is objective and credible展开更多
This paper proposes a proper methodology in data modification by using AHP (analytical hierarchy process) technique and FCM (fuzzy c-mean) model in the ICU (intensive care unit). The binary data were created fro...This paper proposes a proper methodology in data modification by using AHP (analytical hierarchy process) technique and FCM (fuzzy c-mean) model in the ICU (intensive care unit). The binary data were created from continuous data using FCM model, while the continuous data were constructed from binary data using AHP technique. The models used in this study are FCRM (fuzzy c-regression model). A case study in scale of health at the ICU ward using the AI-IP, FCM model and FCRM models was conducted. There are six independent variables in this study. There are four cases which are considered as the result of using AHP technique and FCM model against independent data. After comparing the four cases, it was found that case 4 appeared to be the best model, because it has the lowest MSE (mean square error) value. The original data have the MSE value of 97.33, while the data in case 4 have the MSE value of 82.75. This means that the use of AHP technique can reduce the MSE value, while the use of FCM model can not reduce the MSE value. In other words, it can be proved that the AHP technique can increase the accuracy of prediction in modeling scale of health which is associated with the mortality rate in the ICU.展开更多
Food waste generation is a pressing issue that requires urgent attention and concerted efforts worldwide.The staggering amount of food wasted each year not only wastes valuable resources but also exacerbates environme...Food waste generation is a pressing issue that requires urgent attention and concerted efforts worldwide.The staggering amount of food wasted each year not only wastes valuable resources but also exacerbates environmental,economic,and social challenges.Food Waste Management(FWM)consists of a complex array of criteria and sub-criteria,and treatments which seems interdependent.There is a need to evaluate the FWM with the help of important criteria and sub-criteria and treatments to address this challenge.In this study,we identified four important criteria,21 sub-criteria,and four alternatives of FWM for the case of Malaysia using the integrated approach of literature review and expert opinions.Further,we employed the approach of Modified Fuzzy Improved Analytical Hierarchy Process(IAHP)to corroborate the interrelationships among the identified criteria and sub-criteria,and their associated treatments.This study undertakes linear normalization methods to transform data into comparable numerical values and the Geometric Mean method to handle uncertainty in human judgments.Moreover,the Centroid method is employed to convert fuzzy weights into crisp sets for ease of interpretation.The results indicate that environmental is the most essential criterion,followed by social,economic,and technical.In addition,air and water pollution is identified as the most critical sub-criteria.Black Soldier Fly is discovered as the most sustainable FWM treatment,since it performs the best while meeting all the criteria and sub-criteria assessed.Sensitivity analysis demonstrates that the outputs from the proposed method are robust and reliable.The finding suggests a proper and robust approach to help decision-makers select suitable FWM treatments to tackle various criteria and alternatives especially when handling inconsistent and uncertain judgments during evaluation.展开更多
文摘A dissertation is a research report or scientific paper written by an author to obtain a certain degree. It reflects postgraduates’ research achievements and the educational quality of an institute, even a country. To construct an optimized quality evaluation system for postgraduate dissertation (QESPD), we summarized the influencing factors and invited 10 experienced specialists to rate and prioritize them based on fuzzy analytic hierarchy process. Four primary indicators (innovation, integrity, scientificity and normativity) and 16 sub-indicators were selected to form the evaluation system. The order of primary indicators by weight, was innovation (0.4269), scientificity (0.2807), integrity (0.1728) and normativity (0.1196). The top five sub-dimensions were theoretical originality, scientific value, data reliability, design rationality and evidence credibility. To demonstrate the effectiveness of the proposed system, a case study was performed. In the case study, it was demonstrated that the established two-index-hierarchy QESPD in this study was a more scientific and reasonable evaluation system worthy of promotion and application.
基金Project(50977003) supported by the National Natural Science Foundation of China
文摘In operation,risk arising from power transformer faults is of much uncertainty and complicacy.To timely and objectively control the risks,a transformer risk assessment method based on fuzzy analytic hierarchy process(FAHP) and artificial neural network(ANN) from the perspective of accuracy and quickness is proposed.An analytic hierarchy process model for the transformer risk assessment is built by analysis of the risk factors affecting the transformer risk level and the weight relation of each risk factor in transformer risk calculation is analyzed by application of fuzzy consistency judgment matrix;with utilization of adaptive ability and nonlinear mapping ability of the ANN,the risk factors with large weights are used as input of neutral network,and thus intelligent quantitative assessment of transformer risk is realized.The simulation result shows that the proposed method increases the speed and accuracy of the risk assessment and can provide feasible decision basis for the transformer risk management and maintenance decisions.
基金This work was supported by the National Natural Science Foundation of China(Grant No.2016ZX05042004)the Joint Funds of the National Natural Science Foundation of China(Grant no.U1762104)+3 种基金the Major Scientific and Technological Projects of CNPC(Grant No.ZD2019-184-004)the Fundamental Research Funds for the Central Universities(20CX02306A)the Opening Fund of National Engineering Laboratory of Offshore Geophysical and Exploration EquipmentThe authors also would like to express their sincere gratitude to Dr.Zhang Dalei for his assistance in corrosion tests.
文摘Casing corrosion during CO2 injection or storage results in significant economic loss and increased production risks.Therefore,in this paper,a corroded casing risk assessment model based on analytic hierarchy process and fuzzy comprehensive evaluation is established to identify potential risks in time.First,the corrosion rate and residual strength characteristics are analyzed through corrosion tests and numerical simulations,respectively,to determine the risk factors that may lead to an accident.Then,an index system for corroded casing risk evaluation is established based on six important factors:temperature,CO2 partial pressure,flow velocity,corrosion radius,corrosion depth and wellhead pressure.Subsequently,the index weights are calculated via the analytic hierarchy process.Finally,the risk level of corroded casing is obtained via the fuzzy comprehensive evaluation.The corroded casing risk assessment model has been verified by a case well,which shows that the model is valuable and feasible.It provides an effective decision-making method for the risk evaluation of corroded casing in CO2 injection well,which is conductive to improve the wellbore operation efficiency.
文摘Recently, plant construction throughout the world, including nuclear power plant construction, has grown significantly. The scale of Korea’s nuclear power plant construction in particular, has increased gradually since it won a contract for a nuclear power plant construction project in the United Arab Emirates in 2009. However, time and monetary resources have been lost in some nuclear power plant construction sites due to lack of risk management ability. The need to prevent losses at nuclear power plant construction sites has become more urgent because it demands professional skills and large-scale resources. Therefore, in this study, the Analytic Hierarchy Process (AHP) and Fuzzy Analytic Hierarchy Process (FAHP) were applied in order to make comparisons between decision-making methods, to assess the potential risks at nuclear power plant construction sites. To suggest the appropriate choice between two decision-making methods, a survey was carried out. From the results, the importance and the priority of 24 risk factors, classified by process, cost, safety, and quality, were analyzed. The FAHP was identified as a suitable method for risk assessment of nuclear power plant construction, compared with risk assessment using the AHP. These risk factors will be able to serve as baseline data for risk management in nuclear power plant construction projects.
文摘As a difficult problem, sidewall instability has been beset drilling workers all the time. Not only does it cause huge economic losses, but also it determines the success or failure of drilling engineering. Due to complex relationship between various factors which influence sidewall stability, it hasn’t been found a widely applied method to predicate sidewall stability so far. Therefore, in order to formulate corresponding measures to ensure successful drilling, searching for a kind of better method to forecast sidewall stability before drilling becomes an imperative and significant topic for drilling engineering. On the basis of traditional sidewall stability analytical method, we have put forward the Fuzzy Comprehensive Evaluation Method to forecast sidewall stability regulation using physico-chemical performance parameters of the clay mineral. This method has been improved by introducing the Analytic Hierarchy Process (AHP) and the Maximum Subjection Principle in the application process. After introducing Analytic Hierarchy Process to identify weight, and Maximum Subjection Principle to obtain evaluation results, it has reduced the influence of human factors and enhanced the accuracy of the fuzzy evaluation results. The application in Hailaer Area indicates that this method can predict sidewall stability of gas-oil well with high credibility and strong practicability.
文摘Geographic Information System (GIS) software was used to create a watershed vulnerability model for Bernalillo County, New Mexico. Watershed vulnerability was investigated as a function of soil erosion and infiltration criteria: precipitation, land slope, soil erodibility (K-factor), vegetation cover (NDVI), land use, drainage density, saturated hydraulic conductivity, and hydrologic soil group. Respective criteria weights were derived using a Fuzzy Analytic Hierarchy Process (FAHP) supported by expert opinion. A survey of 10 experts, representing New Mexico Institute of Mining and Technology (NMT), the New Mexico Bureau of Geology and Mineral Resources (NMBGMR), and the United States Geologic Survey (USGS), provided model input data for an integrated pair-wise comparison matrix for soil erosion and for infiltration. Individual criteria weights were determined by decomposing the respective fuzzy synthetic extent matrix using the centroid method. GIS layers were then combined based on criteria weights to produce maps of soil erosion potential and infiltration potential. A composite watershed vulnerability map was generated by equal weighting of each input map. Model results were categorized into five vulnerability categories: not vulnerable (N), slightly vulnerable (SV), moderately vulnerable (MV), highly vulnerable (HV), and extremely vulnerable (EV). The resulting FAHP/GIS model was used to generate a watershed vulnerability map of discrete areas in Bernalillo County, which may be vulnerable to stormwater run-off events and soil erosion. Such high volume run-off events can cause erosion damage to property and infrastructure. Alternatively, in areas near urban development, stormwater run-off may contribute non-point-source pollutant contamination of New Mexico’s surface water resources. The most problematic areas in Bernalillo County are present in the Eastern and Northwestern portions. However, less than 1% of the total area lies within the lowest and highest vulnerability categories with the majority centered around moderate vulnerability. The results of the model were compared with a previously published crisp AHP method. Both methods showed similar regional vulnerability trends. This MCDS/GIS approach is intended to provide support to local governments and decision makers in selection of suitable structural or nonstructural stormwater control measures.
基金The authors would like to acknowledge the funding support of the National Natural Science Foundation of China (Nos. 50579009, 70425001 ) the National 10th Five Year Scientific Project of China for Tackling the Key Problems (2004BA608B-02-02)the Excellence Youth Teacher Sustentation Fund Program of the Ministry of Education of China (Department of Education and Personnel [ 2002 ] 350).
文摘The optimal selection of schemes of water transportation projects is a process of choosing a relatively optimal scheme from a number of schemes of water transportation programming and management projects, which is of importance in both theory and practice in water resource systems engineering. In order to achieve consistency and eliminate the dimensions of fuzzy qualitative and fuzzy quantitative evaluation indexes, to determine the weights of the indexes objectively, and to increase the differences among the comprehensive evaluation index values of water transportation project schemes, a projection pursuit method, named FPRM-PP for short, was developed in this work for selecting the optimal water transportation project scheme based on the fuzzy preference relation matrix. The research results show that FPRM-PP is intuitive and practical, the correction range of the fuzzy rained is both stable and accurate; preference relation matrix A it produces is relatively small, and the result obtherefore FPRM-PP can be widely used in the optimal selection of different multi-factor decision-making schemes.
文摘In order to solve the problem that determining decision factors weights is of subjectivity in heterogeneous wireless network selection algorithm, a network selection algorithm based on extension theory and fuzzy analytic hierarchy process (FAHP) is proposed in this paper. In addition, user and operator codetermine the optimal network using the proposed algorithm, which can give consideration to user and operator benefits. The fuzzy judgment matrix is coustructed by membership degree of decision factors which is calculated according to extension theory. The comprehensive weight of each decision factor is obtained using FAHP. Finally, the optimal network is selected through total property value ranldng of each candidate network under user preference and operator preference. The simulation results show that the proposed algorithm can select the optimal network efficiently and accurately, satisfy user preference, and implement load balance between networks.
文摘Sale-leaseback is paid special focus on for its great application in China in recent years.By giving a detailed analysis,an analysis of the features of sale-leaseback and a study of the risks of it are given in this paper.Then a quantitative analysis of commercial real estate sale-leaseback is carried out.The scientific theoretical analysis is provided in this paper for risk assessment in commercial real estate sale-leaseback mode in China.An effective approach is put forward for sale-leaseback project evaluation and prevention of risk.A useful means is given to supervise commerciai real estate sale-leaseback mode for relevant departments and a certain contribution is made to a further sound development of commercial real estate sale-leaseback mode.
基金Sponsored by the National High Technology Research and Development Program of China ("863"Program) (2009AA01Z433)
文摘For a more accurate and comprehensive assessment of the trustworthiness of component-based soft- ware system, the fuzzy analytic hierarchy process is introduced to establish the analysis model. Combine qualitative and quantitative analyses, the impacts to overall trustworthiness by the different types of components are distinguished. Considering the coupling relationship between components, dividing the system into several layers from target layer to scheme layer, evaluating the scheme advantages disadvantages by group decision-making, the trustworthiness of a typical J2EE structured component-based software is assessed. The trustworthiness asses model of the software components provides an effective methods of operation.
文摘Generally, mine roads are located in the mountain areas, as its complex topography, mostly along the river near the cliffs, steep bend anxious, the mine road design has to adopt lower technical standards relatively and usually is lack of traffic safety facilities. Especially, there are mainly medium-sized vehicles on mine road, under the heavy traffic vehicles affect repeatedly, high frequency of traffic accidents more easily happen in mine road area and cause serious effects on life or property. Combining with the particularity of mine road safety environment, this paper studies the basic theory of safety evaluation, analyses the factors of traffic safety design and special mine terrain conditions, and then establishes mine road safety index system and evaluation model based on the principles such as systematicness, independent indexes, qualitative and quantitative analysis, feasibility, scientificity and reliability. At last, the paper successfully evaluates the safety of road in Huang Mailing phosphate rock area with fuzzy AHP method based on engineering project.
基金Funded by the Development Foundation of Key Laboratory in Bridge-structure Engineering Ministry of Communication,P.R.China(No.CQSLBF-Y07-3)
文摘Bridge quality assessment is an important part in the final acceptance of new bridge construction,and it is also the main basis for the reinforcement or removal of old bridges.We evaluated the weight of each affecting factor to the upper events using progressive analytical hierarchy process(AHP)with the adoption of 3 scaling,reduced the calculation in analytical process,and precluded the nonuniformity of the scaling system.We obtained a comprehensive evaluation system of bridge quality, and verified its pra...
基金The Doctoral Program of Higher Educa-tion Institution of China (No.20050487017)
文摘The index system, code system, and weights of indexes are established to assess the effects of green construction. The index system consists of index level, factor level and sub-factor level. The analytic hierarchy process is used to determine the weights of indexes, and the consistency test indicate that the weight assignment is reasonable. Using fuzzy synthetic judgment method, the assessment model is built, which includes factor set, weight set and conclusion set. An example is given to demonstrate the assessment procedures.
文摘Risk assessment of distributed energy system often has uncertainty and subjective problems. The problems will have some impact on the results. To solve the problems, a method of improved fuzzy analytic hierarchy process is proposed. By using the fuzzy analytic hierarchy process method, a hierarchical analysis model is established. And then according to the given judgment matrix of each index layer, we calculate whether it meets the consistency condition. And then if the judgment matrix does not meet the consistency condition, the problem will be solved by the improving of particle swarm optimization (PSO) with Kalman filter. The practice in the distributed energy system shows that the method can not only fully reflect the fuzziness of assessment elements and process, but also reduce the influence of individual subjective factors and better evaluation results can be achieved.
基金Supported by the Jiangshu Province Communication Scientific Research Project(06Y21)Zhejiang Province Road Scientific Research Project(2007-013-11L)~~
文摘By analyzing the existing methods for the bridge bearing capacity assessment, an analytic hierarchy pro cess estimation model with a variable weight and fuzzy description is proposed based on the nondestructive infor mation. Considering the actual strength, the bearing capacity is first calculated from its design state, and then modified based on the detection information. The modification includes the section reduction and the structure deterioration. The section reduction involves the concrete section and the steel cross-section reduction. The structure deterioration is decided by six factors, i.e. , the concrete surface damage, the actual concrete strength, the steel corrosion electric potential, the chloride ion content, the carbonization depth, and the protective layer depth. The initial weight of each factor is calculated by the expert judgment matrix using an analytic hierarchy process. The consistency approximation and the error transfer theory are used. Then, the variable weight is in- troduced to expand the influences of factors in the worse state. Finally, an actual bridge is taken as an example to verify the proposed method. Results show that the estimated capacity agrees well with that of the load test, thus the method is objective and credible
文摘This paper proposes a proper methodology in data modification by using AHP (analytical hierarchy process) technique and FCM (fuzzy c-mean) model in the ICU (intensive care unit). The binary data were created from continuous data using FCM model, while the continuous data were constructed from binary data using AHP technique. The models used in this study are FCRM (fuzzy c-regression model). A case study in scale of health at the ICU ward using the AI-IP, FCM model and FCRM models was conducted. There are six independent variables in this study. There are four cases which are considered as the result of using AHP technique and FCM model against independent data. After comparing the four cases, it was found that case 4 appeared to be the best model, because it has the lowest MSE (mean square error) value. The original data have the MSE value of 97.33, while the data in case 4 have the MSE value of 82.75. This means that the use of AHP technique can reduce the MSE value, while the use of FCM model can not reduce the MSE value. In other words, it can be proved that the AHP technique can increase the accuracy of prediction in modeling scale of health which is associated with the mortality rate in the ICU.
基金This research work was funded and supported under UUM,Development and Ecosystem Research Grant Scheme(Code:14246).
文摘Food waste generation is a pressing issue that requires urgent attention and concerted efforts worldwide.The staggering amount of food wasted each year not only wastes valuable resources but also exacerbates environmental,economic,and social challenges.Food Waste Management(FWM)consists of a complex array of criteria and sub-criteria,and treatments which seems interdependent.There is a need to evaluate the FWM with the help of important criteria and sub-criteria and treatments to address this challenge.In this study,we identified four important criteria,21 sub-criteria,and four alternatives of FWM for the case of Malaysia using the integrated approach of literature review and expert opinions.Further,we employed the approach of Modified Fuzzy Improved Analytical Hierarchy Process(IAHP)to corroborate the interrelationships among the identified criteria and sub-criteria,and their associated treatments.This study undertakes linear normalization methods to transform data into comparable numerical values and the Geometric Mean method to handle uncertainty in human judgments.Moreover,the Centroid method is employed to convert fuzzy weights into crisp sets for ease of interpretation.The results indicate that environmental is the most essential criterion,followed by social,economic,and technical.In addition,air and water pollution is identified as the most critical sub-criteria.Black Soldier Fly is discovered as the most sustainable FWM treatment,since it performs the best while meeting all the criteria and sub-criteria assessed.Sensitivity analysis demonstrates that the outputs from the proposed method are robust and reliable.The finding suggests a proper and robust approach to help decision-makers select suitable FWM treatments to tackle various criteria and alternatives especially when handling inconsistent and uncertain judgments during evaluation.