Detection of schedule delay risk of empirical construction projects 被引量:1
1
作者 Tsegay GEBREHIWET Hanbin LUO 《Frontiers of Engineering Management》 2018年第2期251-267,共17页
In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, ... In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, limited efforts have been made to investigate the typical and the overall schedule delay risk. In this study, our aim is to detect the typical and overall schedule delay risk throughout the construction project lifecycle, which consists of the pre-construction, construction, and post-construction stages, and compare the stages with each other. Common criteria, sub-criteria, and attributes were developed for all alternatives for the purpose of making a risk decision. The methodology that was followed integrated the multiplecriteria decision-making(MCDM) model of fuzzy analytic hierarchy process comprehensive evaluation(FAHPCE)and the relative important index(RII). Data were collected from 77 participants, who were selected through purposive sampling from different contracting organizations in Ethiopian construction projects by means of questionnaires that were distributed to experienced experts. The findings showed that there is a typical delay risk either in the type or in the level of the different construction activities.Consequently, the most influenced alternative is the construction stage because of the high-risk responsibility,resource, and contract condition related criteria. The postconstruction stage was the second most influenced stage because of the high-risk responsibility-related criteria. The pre-constructed stage was the least influenced stage that consist high-risk criteria of responsibility, resource, and contract condition related. These differences provided noteworthy information about risk mitigation in construction projects by identifying the exact risk level on specific activity to make appropriate decision. 展开更多
关键词 fuzzy analytic hierarchy process comprehensive evaluation construction project detection of delay risk relative important index
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部