A warehouse layout problem where the warehouse has more than one level and both the distance from the cell to the receive/exit bay and demand of item types are fuzzy variables is proposed. The problem is to find a lay...A warehouse layout problem where the warehouse has more than one level and both the distance from the cell to the receive/exit bay and demand of item types are fuzzy variables is proposed. The problem is to find a layout with the minimum transportation cost subject to adjacency and other constraints. A fuzzy expected value model is given and an ant colony system is designed to solve the problem. Computational results indicate the efficiency and effectiveness of the method.展开更多
Public-private partnerships(PPPs)have been used by governments around the world to procure and construct infrastructural amenities.It relies on private sector expertise and funding to achieve this lofty objective.Howe...Public-private partnerships(PPPs)have been used by governments around the world to procure and construct infrastructural amenities.It relies on private sector expertise and funding to achieve this lofty objective.However,given the uncertainties of project management,transparency,accountability,and expropriation,this phenomenon has gained tremendous attention in recent years due to the important role it plays in curbing infrastructural deficits globally.Interestingly,the reasonable benefit distribution scheme in a PPP project is related to the behavior decisionmaking of the government and social capital,aswell as the performance of the project.In this paper,the government and social capital which are the key stakeholders of PPP projects were selected as the research objects.Based on the fuzzy expected value model and game theory,a hybrid method was adopted in this research taking into account the different risk preferences of both public entities and private parties under the fuzzy demand environment.To alleviate the problem of insufficient utilization of social capital in a PPP project,this paper seeks to grasp the relationship that exists between the benefit distribution of stakeholders,their behavioral decision-making,and project performance,given that they impact the performance of both public entities and private parties,as well as assist in maximizing the overall utility of the project.Furthermore,four game models were constructed in this study,while the expected value and opportunity-constrained programming model for optimal decision-making were derived using alternate perspectives of both centralized decision-making and decentralized decision-making.Afterward,the optimal behavioral decision-making of public entities and private parties in four scenarios was discussed and thereafter compared,which led to an ensuing discussion on the benefit distribution system under centralized decision-making.Lastly,based on an example case,the influence of different confidence levels,price,and fuzzy uncertainties of PPP projects on the equilibrium strategy results of both parties were discussed,giving credence to the effectiveness of the hybrid method.The results indicate that adjusting different confidence levels yields different equilibriumpoints,and therefore signposts that social capital has a fair perception of opportunities,as well as identifies reciprocal preferences.Nevertheless,we find that an increase in the cost coefficient of the government and social capital does not inhibit the effort of both parties.Our results also indicate that a reasonable benefit distribution of PPP projects can assist them in realizing optimum Pareto improvements over time.The results provide us with very useful strategies and recommendations to improve the overall performance of PPP projects in China.展开更多
This paper applies double-uncertainty optimization theory to the operation of AC/DC hybrid microgrids to deal with uncertainties caused by a high proportion of intermittent energy sources.A fuzzy stochastic expectatio...This paper applies double-uncertainty optimization theory to the operation of AC/DC hybrid microgrids to deal with uncertainties caused by a high proportion of intermittent energy sources.A fuzzy stochastic expectation economic model for day-ahead scheduling based on uncertain optimization theory is proposed to minimize the operational costs of hybrid AC/DC microgrids.The fuzzy stochastic alternating direction multiplier method is proposed to solve the double-uncertainty optimization problem.A real-time intra-day unbalanced power adjustment model is established to minimize real-time adjustment costs.Through comparative analysis of deterministic optimization,stochastic optimization and fuzzy stochastic optimization of day-ahead scheduling and real-time adjustment,the validity of fuzzy stochastic optimization based on a fuzzy stochastic expectation model is proved.展开更多
基金the National Natural Science Foundation of China (70471063 ,70171036)
文摘A warehouse layout problem where the warehouse has more than one level and both the distance from the cell to the receive/exit bay and demand of item types are fuzzy variables is proposed. The problem is to find a layout with the minimum transportation cost subject to adjacency and other constraints. A fuzzy expected value model is given and an ant colony system is designed to solve the problem. Computational results indicate the efficiency and effectiveness of the method.
基金supported by the National Natural Science Foundation of China(No.62141302)the Humanities Social Science Programming Project of the Ministry of Education of China(No.20YJA630059)+2 种基金the Natural Science Foundation of Jiangxi Province of China(No.20212BAB201011)the China Postdoctoral Science Foundation(No.2019M662265)the Research Project of Economic and Social Development in Liaoning Province of China(No.2022lslybkt-053).
文摘Public-private partnerships(PPPs)have been used by governments around the world to procure and construct infrastructural amenities.It relies on private sector expertise and funding to achieve this lofty objective.However,given the uncertainties of project management,transparency,accountability,and expropriation,this phenomenon has gained tremendous attention in recent years due to the important role it plays in curbing infrastructural deficits globally.Interestingly,the reasonable benefit distribution scheme in a PPP project is related to the behavior decisionmaking of the government and social capital,aswell as the performance of the project.In this paper,the government and social capital which are the key stakeholders of PPP projects were selected as the research objects.Based on the fuzzy expected value model and game theory,a hybrid method was adopted in this research taking into account the different risk preferences of both public entities and private parties under the fuzzy demand environment.To alleviate the problem of insufficient utilization of social capital in a PPP project,this paper seeks to grasp the relationship that exists between the benefit distribution of stakeholders,their behavioral decision-making,and project performance,given that they impact the performance of both public entities and private parties,as well as assist in maximizing the overall utility of the project.Furthermore,four game models were constructed in this study,while the expected value and opportunity-constrained programming model for optimal decision-making were derived using alternate perspectives of both centralized decision-making and decentralized decision-making.Afterward,the optimal behavioral decision-making of public entities and private parties in four scenarios was discussed and thereafter compared,which led to an ensuing discussion on the benefit distribution system under centralized decision-making.Lastly,based on an example case,the influence of different confidence levels,price,and fuzzy uncertainties of PPP projects on the equilibrium strategy results of both parties were discussed,giving credence to the effectiveness of the hybrid method.The results indicate that adjusting different confidence levels yields different equilibriumpoints,and therefore signposts that social capital has a fair perception of opportunities,as well as identifies reciprocal preferences.Nevertheless,we find that an increase in the cost coefficient of the government and social capital does not inhibit the effort of both parties.Our results also indicate that a reasonable benefit distribution of PPP projects can assist them in realizing optimum Pareto improvements over time.The results provide us with very useful strategies and recommendations to improve the overall performance of PPP projects in China.
基金supported by the National Natural Science Foundation of China(No.51577068)Science&Technology Foundation of SGCC(No.520201150012)
文摘This paper applies double-uncertainty optimization theory to the operation of AC/DC hybrid microgrids to deal with uncertainties caused by a high proportion of intermittent energy sources.A fuzzy stochastic expectation economic model for day-ahead scheduling based on uncertain optimization theory is proposed to minimize the operational costs of hybrid AC/DC microgrids.The fuzzy stochastic alternating direction multiplier method is proposed to solve the double-uncertainty optimization problem.A real-time intra-day unbalanced power adjustment model is established to minimize real-time adjustment costs.Through comparative analysis of deterministic optimization,stochastic optimization and fuzzy stochastic optimization of day-ahead scheduling and real-time adjustment,the validity of fuzzy stochastic optimization based on a fuzzy stochastic expectation model is proved.