Polymer gels have been accepted as a useful tool to address many sealing operations such as drilling and completion,well stimulation,wellbore integrity,water and gas shutoff,etc.Previously,we developed an ultra-high s...Polymer gels have been accepted as a useful tool to address many sealing operations such as drilling and completion,well stimulation,wellbore integrity,water and gas shutoff,etc.Previously,we developed an ultra-high strength gel(USGel)for medium to ultra-low temperature reservoirs.However,the removal of USGel is a difficult problem for most temporary plugging operations.This paper first provides new insights into the mechanism of USGel,where multistage network structure and physical entanglement are the main reasons for USGel possessing ultra-high strength.Then the effects of acid breakers,encapsulated breakers,and oxidation breakers(including H_(2)O_(2),Na_(2)S_(2)O_(8),Ca(ClO)_(2),H_(2)O_(2)+NaOH,Na_(2)S_(2)O_(8)+NaOH,and Ca(ClO)_(2)+NaOH)were evaluated.The effects of component concentration and temperature on the breaking solution were studied,and the corrosion performance,physical simulation and formation damage tests of the breaking solution were carried out.The final formulation of 2%-4%NaOH+4.5%-6%H_(2)O_(2) breaking solution was determined,which can make USGel completely turn into water at 35e105C.The combinations of“acid t breaking solution”,“acid+encapsulated breaker”and“encapsulated breaker+breaking solution”were evaluated for breaking effect.The acid gradually reduced the volume of USGel,which increased the contact area between breaking solution and USGel,and the effect of“4%acid+breaking solution”was 23 times higher than that of breaking solution alone at 35C.However,the acid significantly reduced the strength of USGel.This paper provides new insights into the breaking of high-strength gels with complex network structures.展开更多
At present, in the workover operations of old gas wells in the Changqing Gas Field, due to years of exploitation in the production layer, pressure deficits, and general leakage during the well killing, the well must b...At present, in the workover operations of old gas wells in the Changqing Gas Field, due to years of exploitation in the production layer, pressure deficits, and general leakage during the well killing, the well must be plugged before the well can be killed. In particular, the fracture-cavity type fractures of the lower paleocarbonate reservoirs have serious leakage. Traditional plugging materials and traditional plugging materials and methods have some limitations in dealing with leakage problems. Therefore, a composite plugging system using polymer solution as the base carrier fluid, multi-particle size rigid particles, expandable particles and modified fibers is developed. Its formula is: water + 2% polyacrylamide + 0.1% N, N-methylene bisacrylamide polymer gel is the base carrier fluid;the formulation of the particle plugging agent was continuously optimized through the CDL-II high temperature and high pressure dynamic and static plugging ability to plug the core. The final formulation of the plugging agent is: 1) 20% rigid particles (5 mm, 1 mm, 0.5 mm CCP-3 ratio 4:2:1) + 1% 3 mm expanded particles SMK-1 + 1% 1 ~ 2 mm fiber SRXW-10;2) 20% rigid particles (3 mm, 0.1 mm, 0.05 mm CCP-3 ratio 3:2:1) + 1% 3 mm expanded particles SMK-1 + 1% 1 ~ 2 mm fiber SRXW-10. The water swelling multiples of the granular plugging agent in salt water are all above 7 times, which meets the requirements of leak-proof plugging operations under high salinity;3% HCl is selected as the gel breaker, and the plugging system has a gel breaking rate of 95%;through the water plugging and profile control experimental system, the sand-filled pipe is used to simulate the plugging effect under high temperature and high pressure, and the plugging system can be sealed for 5 days at a high temperature of 110°C and a high pressure of 20 MPa to achieve a good plugging of the formation. It is expected that the developed plugging system has a good application prospect in future workover operations.展开更多
基金supported by Fok Ying-Tong Education Foundation(Grant No.171043)Sichuan Science and Technology Program(Award No.2020YFQ0036).
文摘Polymer gels have been accepted as a useful tool to address many sealing operations such as drilling and completion,well stimulation,wellbore integrity,water and gas shutoff,etc.Previously,we developed an ultra-high strength gel(USGel)for medium to ultra-low temperature reservoirs.However,the removal of USGel is a difficult problem for most temporary plugging operations.This paper first provides new insights into the mechanism of USGel,where multistage network structure and physical entanglement are the main reasons for USGel possessing ultra-high strength.Then the effects of acid breakers,encapsulated breakers,and oxidation breakers(including H_(2)O_(2),Na_(2)S_(2)O_(8),Ca(ClO)_(2),H_(2)O_(2)+NaOH,Na_(2)S_(2)O_(8)+NaOH,and Ca(ClO)_(2)+NaOH)were evaluated.The effects of component concentration and temperature on the breaking solution were studied,and the corrosion performance,physical simulation and formation damage tests of the breaking solution were carried out.The final formulation of 2%-4%NaOH+4.5%-6%H_(2)O_(2) breaking solution was determined,which can make USGel completely turn into water at 35e105C.The combinations of“acid t breaking solution”,“acid+encapsulated breaker”and“encapsulated breaker+breaking solution”were evaluated for breaking effect.The acid gradually reduced the volume of USGel,which increased the contact area between breaking solution and USGel,and the effect of“4%acid+breaking solution”was 23 times higher than that of breaking solution alone at 35C.However,the acid significantly reduced the strength of USGel.This paper provides new insights into the breaking of high-strength gels with complex network structures.
文摘At present, in the workover operations of old gas wells in the Changqing Gas Field, due to years of exploitation in the production layer, pressure deficits, and general leakage during the well killing, the well must be plugged before the well can be killed. In particular, the fracture-cavity type fractures of the lower paleocarbonate reservoirs have serious leakage. Traditional plugging materials and traditional plugging materials and methods have some limitations in dealing with leakage problems. Therefore, a composite plugging system using polymer solution as the base carrier fluid, multi-particle size rigid particles, expandable particles and modified fibers is developed. Its formula is: water + 2% polyacrylamide + 0.1% N, N-methylene bisacrylamide polymer gel is the base carrier fluid;the formulation of the particle plugging agent was continuously optimized through the CDL-II high temperature and high pressure dynamic and static plugging ability to plug the core. The final formulation of the plugging agent is: 1) 20% rigid particles (5 mm, 1 mm, 0.5 mm CCP-3 ratio 4:2:1) + 1% 3 mm expanded particles SMK-1 + 1% 1 ~ 2 mm fiber SRXW-10;2) 20% rigid particles (3 mm, 0.1 mm, 0.05 mm CCP-3 ratio 3:2:1) + 1% 3 mm expanded particles SMK-1 + 1% 1 ~ 2 mm fiber SRXW-10. The water swelling multiples of the granular plugging agent in salt water are all above 7 times, which meets the requirements of leak-proof plugging operations under high salinity;3% HCl is selected as the gel breaker, and the plugging system has a gel breaking rate of 95%;through the water plugging and profile control experimental system, the sand-filled pipe is used to simulate the plugging effect under high temperature and high pressure, and the plugging system can be sealed for 5 days at a high temperature of 110°C and a high pressure of 20 MPa to achieve a good plugging of the formation. It is expected that the developed plugging system has a good application prospect in future workover operations.