Optimizing Flow Path Design(FPD)is a popular research area in transportation system design,but its application to Overhead Transportation Systems(OTSs)has been limited.This study focuses on optimizing a double-spine f...Optimizing Flow Path Design(FPD)is a popular research area in transportation system design,but its application to Overhead Transportation Systems(OTSs)has been limited.This study focuses on optimizing a double-spine flow path design for OTSs with 10 stations by minimizing the total travel distance for both loaded and empty flows.We employ transportation methods,specifically the North-West Corner and Stepping-Stone methods,to determine empty vehicle travel flows.Additionally,the Tabu Search(TS)algorithm is applied to branch the 10 stations into two main layout branches.The results obtained from our proposed method demonstrate a reduction in the objective function value compared to the initial feasible solution.Furthermore,we explore howchanges in the parameters of the TS algorithm affect the optimal result.We validate the feasibility of our approach by comparing it with relevant literature and conducting additional tests on layouts with 20 and 30 stations.展开更多
In order to meet the needs of various tasks of water conservancy project, tunnel excavation under the ground, called hydraulic tunnel. Hydraulic tunnel according to the functions of flood discharge, water diversion, i...In order to meet the needs of various tasks of water conservancy project, tunnel excavation under the ground, called hydraulic tunnel. Hydraulic tunnel according to the functions of flood discharge, water diversion, irrigation, water supply, and the construction diversion tunnel of desilting emptying. Nowadays, water conservancy project on flood discharge runnel design requirements more and more high, so the factors taken into account the amount of spillway tunnel engineering, engineering cost, structure design and other factors to evaluate nature of the spillway tunnel is very important. Therefore, in actual construction, of spillway tunnel of optimization design, whether from the economic point of view, or from the point of view of safety and applicability are necessary. This article mainly from the overall layout of flood discharge tunnel, structure design and so on, and then discuss the optimization scheme.展开更多
基金funded by Ho Chi Minh City University of Technology(HCMUT),VNU-HCM under Grant Number B2021-20-04.
文摘Optimizing Flow Path Design(FPD)is a popular research area in transportation system design,but its application to Overhead Transportation Systems(OTSs)has been limited.This study focuses on optimizing a double-spine flow path design for OTSs with 10 stations by minimizing the total travel distance for both loaded and empty flows.We employ transportation methods,specifically the North-West Corner and Stepping-Stone methods,to determine empty vehicle travel flows.Additionally,the Tabu Search(TS)algorithm is applied to branch the 10 stations into two main layout branches.The results obtained from our proposed method demonstrate a reduction in the objective function value compared to the initial feasible solution.Furthermore,we explore howchanges in the parameters of the TS algorithm affect the optimal result.We validate the feasibility of our approach by comparing it with relevant literature and conducting additional tests on layouts with 20 and 30 stations.
文摘In order to meet the needs of various tasks of water conservancy project, tunnel excavation under the ground, called hydraulic tunnel. Hydraulic tunnel according to the functions of flood discharge, water diversion, irrigation, water supply, and the construction diversion tunnel of desilting emptying. Nowadays, water conservancy project on flood discharge runnel design requirements more and more high, so the factors taken into account the amount of spillway tunnel engineering, engineering cost, structure design and other factors to evaluate nature of the spillway tunnel is very important. Therefore, in actual construction, of spillway tunnel of optimization design, whether from the economic point of view, or from the point of view of safety and applicability are necessary. This article mainly from the overall layout of flood discharge tunnel, structure design and so on, and then discuss the optimization scheme.