Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity...Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity of optimal scheduling processes were obtained by calculating the daily runoff process within three typical years, and a large number of simulated daily runoff processes were obtained using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA). After analyzing the optimal scheduling processes, the corresponding scheduling rules were determined, and the practical formulas were obtained. These rules can make full use of the rolling runoff forecast and carry out the rolling scheduling. Compared with the optimized results, the maximum relative difference of the annual power generation obtained by the scheduling rules is no more than 1%. The effectiveness and practical applicability of the scheduling rules are demonstrated by a case study. This study provides a new perspective for formulating the rules of power generation dispatching.展开更多
For the implementation of power market in China,medium-and Iong-term security checks are essential for bilateral transactions,of which the electricity quantity that constitutes the generation feasible region(GFR)is th...For the implementation of power market in China,medium-and Iong-term security checks are essential for bilateral transactions,of which the electricity quantity that constitutes the generation feasible region(GFR)is the target.However,uncertainties from load forecasting errors and transmission contingencies are threats to medium-and Iong-term electricity tradi ng in terms of their in flue nces on the GFR.In this paper,we prese nt a graphic distortio n pattern in a typical threegenerator system using the Monte Carlo method and projection theory based on security constrained economic dispatch.The underlying potential risk to GFR from uncertainties is clearly visualized,and their impact characteristics are discussed.A case study on detailed GFR distortion was included to dem on strate the effectiveness of this visualization model.The result implies that a small uncertainty could distort the GFR to a remarkable extent and that different line-contingency precipitates disparate the GFR distortion patterns,thereby eliciting great emphasis on load forecasting and line reliability in electricity transacti ons.展开更多
This paper describes the research on a largescale dispatchable grid-connected photovoltaic(PV)system for supplying power to the grid for dispatch instead of supplying the electricity to a local load.In order to maximi...This paper describes the research on a largescale dispatchable grid-connected photovoltaic(PV)system for supplying power to the grid for dispatch instead of supplying the electricity to a local load.In order to maximise the value of the solar energy,a hybrid electricity storage consisting of batteries and supercapacitors is used with the PV system.This paper proposes a control strategy focusing on theDCpower at theDClink rather than at the grid-connected inverter.Two typical sets of real data,collected from existing sites,are used to demonstrate the practicality of the system.Finally,the simulation results are used to demonstrate the good performance and feasibility of the proposed system together with the proposed control strategy.展开更多
The high penetration of wind energy sources in power systems has substantially increased the demand for faster-ramping thermal units participating in the frequency regulation service.To fulfill the automatic generatio...The high penetration of wind energy sources in power systems has substantially increased the demand for faster-ramping thermal units participating in the frequency regulation service.To fulfill the automatic generation control(AGC)and compensate the influence of wind power fluctuations simultaneously,ramping capacity should be considered in the dispatch model of thermals.Meanwhile,conventional methods in this area do not take the impact of transmission loss into the dispatch model,or rely on offline network model and parameters,failing to reflect the real relationships between the wind farms and thermal generators.This paper proposes an online approach for AGC dispatch units considering the above issues.Firstly,the power loss sensitivity is online identified using recursive least square method based on the real-time data of phasor measurement units.It sets up power balance constraint and results in a more accurate dispatch model.Then,an improved multi-objective optimization model of dispatch is proposed and a connection is established between the thermal units with fast ramping capacity and the wind farms with rapid fluctuations.Genetic algorithm is used to solve the dispatch model.The proposed method is compared with conventional methods in simulation case in the IEEE 30-bus system.Finally,simulation results verify the validity and the feasibility of identification method and optimization model.展开更多
基金supported by the National Key Basic Research Development Program of China (Grant No. 2002CCA00700)
文摘Power generation dispatching is a large complex system problem with multi-dimensional and nonlinear characteristics. A mathematical model was established based on the principle of reservoir operation. A large quantity of optimal scheduling processes were obtained by calculating the daily runoff process within three typical years, and a large number of simulated daily runoff processes were obtained using the progressive optimality algorithm (POA) in combination with the genetic algorithm (GA). After analyzing the optimal scheduling processes, the corresponding scheduling rules were determined, and the practical formulas were obtained. These rules can make full use of the rolling runoff forecast and carry out the rolling scheduling. Compared with the optimized results, the maximum relative difference of the annual power generation obtained by the scheduling rules is no more than 1%. The effectiveness and practical applicability of the scheduling rules are demonstrated by a case study. This study provides a new perspective for formulating the rules of power generation dispatching.
基金the National Key R&D Program of China under Grant No.2020YFB0905900in part by the State Grid Corporation of China project“Research on inter-provincial price coupling mechanism of national unified electricity spot market”.
文摘For the implementation of power market in China,medium-and Iong-term security checks are essential for bilateral transactions,of which the electricity quantity that constitutes the generation feasible region(GFR)is the target.However,uncertainties from load forecasting errors and transmission contingencies are threats to medium-and Iong-term electricity tradi ng in terms of their in flue nces on the GFR.In this paper,we prese nt a graphic distortio n pattern in a typical threegenerator system using the Monte Carlo method and projection theory based on security constrained economic dispatch.The underlying potential risk to GFR from uncertainties is clearly visualized,and their impact characteristics are discussed.A case study on detailed GFR distortion was included to dem on strate the effectiveness of this visualization model.The result implies that a small uncertainty could distort the GFR to a remarkable extent and that different line-contingency precipitates disparate the GFR distortion patterns,thereby eliciting great emphasis on load forecasting and line reliability in electricity transacti ons.
基金This work was supported by National High Technology Research and Development Program,“863 key technologies and development on large-scale grid-connected PV plants”(No.2011AA05A301).
文摘This paper describes the research on a largescale dispatchable grid-connected photovoltaic(PV)system for supplying power to the grid for dispatch instead of supplying the electricity to a local load.In order to maximise the value of the solar energy,a hybrid electricity storage consisting of batteries and supercapacitors is used with the PV system.This paper proposes a control strategy focusing on theDCpower at theDClink rather than at the grid-connected inverter.Two typical sets of real data,collected from existing sites,are used to demonstrate the practicality of the system.Finally,the simulation results are used to demonstrate the good performance and feasibility of the proposed system together with the proposed control strategy.
基金This work is supported in part by Major State Basic Research Development Program of China(No.2012CB215206)National Natural Science Foundation of China(No.51107061).
文摘The high penetration of wind energy sources in power systems has substantially increased the demand for faster-ramping thermal units participating in the frequency regulation service.To fulfill the automatic generation control(AGC)and compensate the influence of wind power fluctuations simultaneously,ramping capacity should be considered in the dispatch model of thermals.Meanwhile,conventional methods in this area do not take the impact of transmission loss into the dispatch model,or rely on offline network model and parameters,failing to reflect the real relationships between the wind farms and thermal generators.This paper proposes an online approach for AGC dispatch units considering the above issues.Firstly,the power loss sensitivity is online identified using recursive least square method based on the real-time data of phasor measurement units.It sets up power balance constraint and results in a more accurate dispatch model.Then,an improved multi-objective optimization model of dispatch is proposed and a connection is established between the thermal units with fast ramping capacity and the wind farms with rapid fluctuations.Genetic algorithm is used to solve the dispatch model.The proposed method is compared with conventional methods in simulation case in the IEEE 30-bus system.Finally,simulation results verify the validity and the feasibility of identification method and optimization model.