This paper introduces a method of building a prototype system of geologic profile auto-drawing.A.NET development platform and integrated environment was used along with a component based design,a B/S system model,and ...This paper introduces a method of building a prototype system of geologic profile auto-drawing.A.NET development platform and integrated environment was used along with a component based design,a B/S system model,and XML techniques.Knowledge rules for creating geologic profiles and generating virtual drilling data from existing bore data and expert,hand-drawn geologic profiles were acquired. Then a prototype system was established by utilizing the known knowledge rules,topological relationships, and semantic relationships among strata.This system has a friendly human-computer interface and can meet requirements of mutual queries between attribute and spatial data.The generated profile map is editable.This study provides a new powerful tool for underground mine work.展开更多
The Changjiang fault zone,also known as the Mufushan-Jiaoshan fault,is a famous fault located at the southern bank of the Changjiang River,near the Nanjing downtown area.Based on multidisciplinary data from shallow ar...The Changjiang fault zone,also known as the Mufushan-Jiaoshan fault,is a famous fault located at the southern bank of the Changjiang River,near the Nanjing downtown area.Based on multidisciplinary data from shallow artificial seismic explorations in the target detecting area(Nanjing city and the nearby areas),trenching and drilling explorations,classification of Quaternary strata and chronology dating data,this paper provides the most up-to-date results regarding activities of the Changjiang fault zone,including the most recent active time,activity nature,related active parameters,and their relation to seismic activity.展开更多
基金supported by the National Department Public Benefit Research Foundation(No. GYHY200806002)the Nanjing University of Information Science & Technology Research Fund(No.S8108185001)Project supported by NSFC(No.40901244).
文摘This paper introduces a method of building a prototype system of geologic profile auto-drawing.A.NET development platform and integrated environment was used along with a component based design,a B/S system model,and XML techniques.Knowledge rules for creating geologic profiles and generating virtual drilling data from existing bore data and expert,hand-drawn geologic profiles were acquired. Then a prototype system was established by utilizing the known knowledge rules,topological relationships, and semantic relationships among strata.This system has a friendly human-computer interface and can meet requirements of mutual queries between attribute and spatial data.The generated profile map is editable.This study provides a new powerful tool for underground mine work.
基金sponsored by the Key Construction Programof the National Tenth"Five-year Plan"the Sub-project forthe Earthquake Active Fault Detecting Technology System(1-4-10)the Active Fault Detecting and Earthquake Risk Evaluation of Nanjing City
文摘The Changjiang fault zone,also known as the Mufushan-Jiaoshan fault,is a famous fault located at the southern bank of the Changjiang River,near the Nanjing downtown area.Based on multidisciplinary data from shallow artificial seismic explorations in the target detecting area(Nanjing city and the nearby areas),trenching and drilling explorations,classification of Quaternary strata and chronology dating data,this paper provides the most up-to-date results regarding activities of the Changjiang fault zone,including the most recent active time,activity nature,related active parameters,and their relation to seismic activity.