A comprehensive thermo-economic model combining a geothermal heat mining system and a direct supercritical CO_(2) turbine expansion electric power generation system was proposed in this paper.Assisted by this integrat...A comprehensive thermo-economic model combining a geothermal heat mining system and a direct supercritical CO_(2) turbine expansion electric power generation system was proposed in this paper.Assisted by this integrated model,thermo-economic and optimization analyses for the key design parameters of the whole system including the geothermal well pattern and operational conditions were performed to obtain a minimal levelized cost of electricity(LCOE).Specifically,in geothermal heat extraction simulation,an integrated wellbore-reservoir system model(T2Well/ECO_(2)N)was used to generate a database for creating a fast,predictive,and compatible geothermal heat mining model by employing a response surface methodology.A parametric study was conducted to demonstrate the impact of turbine discharge pressure,injection and production well distance,CO_(2) injection flowrate,CO_(2) injection temperature,and monitored production well bottom pressure on LCOE,system thermal efficiency,and capital cost.It was found that for a 100 MWe power plant,a minimal LCOE of$0.177/kWh was achieved for a 20-year steady operation without considering CO_(2) sequestration credit.In addition,when CO_(2) sequestration credit is$1.00/t,an LCOE breakeven point compared to a conventional geothermal power plant is achieved and a breakpoint for generating electric power generation at no cost was achieved for a sequestration credit of $2.05/t.展开更多
基金funded by the Mexican National Council of Science and Technology(CONACYT in Spanish),under the Sectorial Fund for Energy Sustainability,CONACYT-Secretaiy of Energy(No.S0019-2012-04).
文摘A comprehensive thermo-economic model combining a geothermal heat mining system and a direct supercritical CO_(2) turbine expansion electric power generation system was proposed in this paper.Assisted by this integrated model,thermo-economic and optimization analyses for the key design parameters of the whole system including the geothermal well pattern and operational conditions were performed to obtain a minimal levelized cost of electricity(LCOE).Specifically,in geothermal heat extraction simulation,an integrated wellbore-reservoir system model(T2Well/ECO_(2)N)was used to generate a database for creating a fast,predictive,and compatible geothermal heat mining model by employing a response surface methodology.A parametric study was conducted to demonstrate the impact of turbine discharge pressure,injection and production well distance,CO_(2) injection flowrate,CO_(2) injection temperature,and monitored production well bottom pressure on LCOE,system thermal efficiency,and capital cost.It was found that for a 100 MWe power plant,a minimal LCOE of$0.177/kWh was achieved for a 20-year steady operation without considering CO_(2) sequestration credit.In addition,when CO_(2) sequestration credit is$1.00/t,an LCOE breakeven point compared to a conventional geothermal power plant is achieved and a breakpoint for generating electric power generation at no cost was achieved for a sequestration credit of $2.05/t.