This study investigated practical and simultaneous removal of cesium (Cs, initial concentration of 5 mg/L) and strontium (Sr, initial concentration of 5 mg/L) using a photosynthetic bacterium, Rhodobacter sphaeroides ...This study investigated practical and simultaneous removal of cesium (Cs, initial concentration of 5 mg/L) and strontium (Sr, initial concentration of 5 mg/L) using a photosynthetic bacterium, Rhodobacter sphaeroides SSI, immobilized on recovery-type porous ceramic made from glass waste. When 4 - 8 pieces /L of SSI immobilized ceramic were added to synthetic sewage wastewater containing glucose, almost 100% of Cs and 57% - 61% removal of Sr was observed after 3 day’s aeration treatment. The high potassium (K) concentration in wastewater suppressed Cs removal, but did not affect Sr removal. Other substrates such as lactic, acetic, and propionic acids were useful for Cs and Sr removal. But, removal efficiencies were lower than about 50%. When the practical outdoor removal experiment carried out using1 m3 vessel, almost 100% of Cs and 51% of Sr were removed like a laboratory experiment after 3 day’s aerobic treatment. After treatment, the SSI immobilized ceramic was recovered easily from water using an electromagnet. This SSI immobilized ceramic seem to remove radioactive Cs and Sr from water environments of Fukushima,Japan.展开更多
The aim of this study is to analyze of the cable-glass systems which are used on the glass curtain wall according to their types, degree, architectural and structural effects. The suspended glass system with pre-stres...The aim of this study is to analyze of the cable-glass systems which are used on the glass curtain wall according to their types, degree, architectural and structural effects. The suspended glass system with pre-stressed cable truss (SGSPCT) is widely started to apply after the 1980’s with Serres building. The advantages of these systems are to provide the transparency on the fa?ades and speedy construction process with minimum materials. The disadvantages are: more expensive than other systems and so many details for the joints and load distribution calculations. There are three different architectural design typologies of the SGSPCT system. These are distance bridging systems, between floor system and independent body. These three different typologies can be seen on the same building at the same time. This system has been known as complex structure systems. The twenty five glass buildings which are designed in different systems have been analyzed during this study. After these analyses the five glass buildings which are designed with cable-truss system have been selected for scope of the study. These selected buildings have been included of three different cable-truss system typologies and degree. The methodology of this study is literature survey and building analyses method. The written and visual documents involve books, theses, reports, articles, magazines, drawings, internet sources and applied connection details of the glass buildings. The selected five glass buildings have been detailed analyzed with their architectural drawings, photographs and details. The study consists of five chapters including the introduction chapter. The general information of the glass building and cable-glass system has been mentioned in the first chapter. The structural features, details and analytical information on systems have been explained of the selected buildings in the second chapter. The detailed analyses of these selected buildings have been done according to their schematic drawings with the plans, sections and load distribution in the third chapter. The fourth chapter is discussion section. In this section, cable-truss systems have been compared with their advantages and disadvantages to the other systems. The fifth chapter is the last chapter, many advantages of cable-truss systems have been concluded that the use of glass substrates.展开更多
文摘This study investigated practical and simultaneous removal of cesium (Cs, initial concentration of 5 mg/L) and strontium (Sr, initial concentration of 5 mg/L) using a photosynthetic bacterium, Rhodobacter sphaeroides SSI, immobilized on recovery-type porous ceramic made from glass waste. When 4 - 8 pieces /L of SSI immobilized ceramic were added to synthetic sewage wastewater containing glucose, almost 100% of Cs and 57% - 61% removal of Sr was observed after 3 day’s aeration treatment. The high potassium (K) concentration in wastewater suppressed Cs removal, but did not affect Sr removal. Other substrates such as lactic, acetic, and propionic acids were useful for Cs and Sr removal. But, removal efficiencies were lower than about 50%. When the practical outdoor removal experiment carried out using1 m3 vessel, almost 100% of Cs and 51% of Sr were removed like a laboratory experiment after 3 day’s aerobic treatment. After treatment, the SSI immobilized ceramic was recovered easily from water using an electromagnet. This SSI immobilized ceramic seem to remove radioactive Cs and Sr from water environments of Fukushima,Japan.
文摘The aim of this study is to analyze of the cable-glass systems which are used on the glass curtain wall according to their types, degree, architectural and structural effects. The suspended glass system with pre-stressed cable truss (SGSPCT) is widely started to apply after the 1980’s with Serres building. The advantages of these systems are to provide the transparency on the fa?ades and speedy construction process with minimum materials. The disadvantages are: more expensive than other systems and so many details for the joints and load distribution calculations. There are three different architectural design typologies of the SGSPCT system. These are distance bridging systems, between floor system and independent body. These three different typologies can be seen on the same building at the same time. This system has been known as complex structure systems. The twenty five glass buildings which are designed in different systems have been analyzed during this study. After these analyses the five glass buildings which are designed with cable-truss system have been selected for scope of the study. These selected buildings have been included of three different cable-truss system typologies and degree. The methodology of this study is literature survey and building analyses method. The written and visual documents involve books, theses, reports, articles, magazines, drawings, internet sources and applied connection details of the glass buildings. The selected five glass buildings have been detailed analyzed with their architectural drawings, photographs and details. The study consists of five chapters including the introduction chapter. The general information of the glass building and cable-glass system has been mentioned in the first chapter. The structural features, details and analytical information on systems have been explained of the selected buildings in the second chapter. The detailed analyses of these selected buildings have been done according to their schematic drawings with the plans, sections and load distribution in the third chapter. The fourth chapter is discussion section. In this section, cable-truss systems have been compared with their advantages and disadvantages to the other systems. The fifth chapter is the last chapter, many advantages of cable-truss systems have been concluded that the use of glass substrates.