Surrounding rock control of gob-side entry driving with narrow coal pillar and roadway side sealing technology in Yangliu Coal Mine 被引量:7
1
作者 Zha Wenhua Shi Hao +1 位作者 Liu San Kang Changhao 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2017年第5期819-823,共5页
Gob-side entry driving can increase coal recovery ratio, and it is implied in many coal mines. Based on geological condition of 10416 working face tailentry in Yangliu Coal Mine, the surrounding rock deformation chara... Gob-side entry driving can increase coal recovery ratio, and it is implied in many coal mines. Based on geological condition of 10416 working face tailentry in Yangliu Coal Mine, the surrounding rock deformation characteristics of gob-side entry driving with narrow coal pillar is analysed, reasonable size of coal pillar and reasonable roadway excavation time after mining are achieved. Surrounding rock control technology and effective roadway side sealing technology are proposed and are taken into field practice. The results showed that a safer and more efficient mining of working face can be achieved. In addition, results of this paper also have important theoretical significance and valuable reference for surrounding rock control technology of gob-side entry driving with narrow coal pillar under special geological condition. 展开更多
关键词 narrow coal pillar gob-side entry driving SURROUNDING rock control ROADWAY SIDE sealing technology
下载PDF
Failure laws of narrow pillar and asymmetric control technique of gob-side entry driving in island coal face 被引量:16
2
作者 Yang Jiping Cao Shenggen Li Xuehua 《International Journal of Mining Science and Technology》 SCIE EI 2013年第2期271-276,共6页
In allusion to the problems of complex stress distribution in the surrounding rock and deformation failure laws, as well as the difficulty in roadway supporting of the gob-side entry driving in the island coal face, 2... In allusion to the problems of complex stress distribution in the surrounding rock and deformation failure laws, as well as the difficulty in roadway supporting of the gob-side entry driving in the island coal face, 2107 face in Chengjiao Colliery is researched as an engineering case. Through physical mechanical test of rock, theoretical and numerical simulation analyses of rock, the analysis model of the roadway overlying strata structure was established, and its parameters quantified. To reveal the deformation law of the surrounding rock, the stability of the overlying strata structure was studied before, during and after the roadway driving. According to the field conditions, the stress distribution in coal pillar was quantified, and the surrounding rock deformation feature studied with different widths of the pillars in gob-side entry driving. Finally, the pillar width of 4 m was considered as the most reasonable. The research results show that there is great difference in support conditions among roadway roof, entity coal side and narrow pillar side. Besides, the asymmetric control technique for support of the surrounding rock was proposed. The asymmetric control technique was proved to be reasonable by field monitoring, support by bolt-net, steel ladder and steel wire truss used in narrow pillar side. 展开更多
关键词 Island coal face gob-side entry driving narrow pillar Asymmetric control
下载PDF
Stability of coal pillar in gob-side entry driving under unstable overlying strata and its coupling support control technique 被引量:10
3
作者 Yuan Zhang Zhijun Wan +4 位作者 Fuchen Li Changbing Zhou Bo Zhang Feng Guo Chengtan Zhu 《International Journal of Mining Science and Technology》 SCIE EI 2013年第2期204-210,共7页
Considering the situation that it is difficult to control the stability of narrow coal pillar in gob-side entry driving under unstable overlying strata, the finite difference numerical simulation method was adopted to... Considering the situation that it is difficult to control the stability of narrow coal pillar in gob-side entry driving under unstable overlying strata, the finite difference numerical simulation method was adopted to analyze the inner stress distribution and its evolution regularity, as well as the deformation characteristics of narrow coal pillar in gob-side entry driving, in the whole process from entry driving of last working face to the present working face mining. A new method of narrow coal pillar control based on the triune coupling support technique (TCST), which includes that high-strength prestressed thread steel bolt is used to strain the coal on the goaf side, and that short bolt to control the integrity of global displacement zone in coal pillar on the entry side, and that long grouting cable to fix anchor point to constrain the bed separation between global displacement zone and fixed zone, is thereby generated and applied to the field production. The result indicates that after entry excavating along the gob under unstable overlying strata, the supporting structure left on the gob side of narrow coal pillar is basically invalid to maintain the coal-pillar stability, and the large deformation of the pillar on the gob side is evident. Except for the significant dynamic pressure appearing in the coal mining of last working face and overlying strata stabilizing process, the stress variation inside the coal pillar in other stages are rather steady, however, the stress expansion is obvious and the coal pillar continues to deform. Once the gob-side entry driving is completed, a global displacement zone on the entry side appears in the shallow part of the pillar, whereas, a relatively steady fixed zone staying almost still in gob-side entry driving and present working face mining is found in the deep part of the pillar. The application of TCST can not only avoid the failure of pillar supporting structure, but exert the supporting capacity of the bolting structure left in the pillar of last sublevel entry, thus to jointly maintain the stability of coal pillar. 展开更多
关键词 gob-side entry driving Unstable surrounding rock coal pillar stability Surrounding rock control Coupling support
下载PDF
Top-coal deformation control of gob-side entry with narrow pillars and its application for fully mechanized mining face 被引量:3
4
作者 Qi Fangkun Zhou Yuejin +3 位作者 Li Jiawei Wang Erqian Cao Zhengzheng Li Ning 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第3期417-422,共6页
A mechanical model to control the top-coal deformation is established in accordance with the structural characters of the gob-side entry surrounding rock for the fully-mechanic top-coal caving; the analytical solution... A mechanical model to control the top-coal deformation is established in accordance with the structural characters of the gob-side entry surrounding rock for the fully-mechanic top-coal caving; the analytical solution of top coal roof-sag curve is deduced with Winkler elastic foundation beam model. By means of a calculating and analytic program, the top coal roof-sag values are calculated under the conditions of different supporting intensities, widths of narrow pillars and stiffness of top coal; meanwhile, the relationship between the roof-sag values and supporting intensity, width of narrow pillars and stiffness of top coal is analyzed as well. With the actual situation of the gob-side entry taken into consideration, the parameters of top-coal control are determined and a supporting plan is proposed for the top-coal control,which is proved to be reliable and effective by on-site verification. Some theoretical guidance and advice are put forward for the top-coal deformation control in gob-side entry for fully mechanized top-coal caving face. 展开更多
关键词 Fully mechanized top-coal caving narrow pillar gob-side entry Top coal Deformation control
下载PDF
Patterns and security technologies for co-extraction of coal and gas in deep mines without entry pillars 被引量:5
5
作者 Nong Zhang Fei Xue Nianchao Zhang Xiaowei Feng 《International Journal of Coal Science & Technology》 EI 2015年第1期66-75,共10页
Retaining gob-side entryways and the stability of gas drainage boreholes are two essential techniques in the co-extraction of coal and gas without entry pillars (CECGWEP). However, retained entryways located in deep... Retaining gob-side entryways and the stability of gas drainage boreholes are two essential techniques in the co-extraction of coal and gas without entry pillars (CECGWEP). However, retained entryways located in deep coal mines are hard to maintain, especially for constructing boreholes in confined spaces, owing to major deformations. Consequently, it is difficult to drill boreholes and maintain their stability, which therefore cannot guarantee the effectiveness of gas drainage. This paper presents three measures for conducting CECGWEP in deep mines on the basis of effective space in retained entryways for gas drainage, They are combinations of retaining roadways and face-lagging inclined boreholes, retaining roadways and face-advancing inclined boreholes, and retaining roadways and high return airway inclined boreholes. Several essential techniques are suggested to improve the maintenance of retained entryways and the stabilization of boreholes. For the particular cases considered in this study, two field trials have verified the latter two measures from the results obtained from the faces 1111(1) and 11112(1) in the Zhuji Mine. The results indicate that these models can effectively solve the problems in deep mines. The maximum gas drainage flow for a single hole can reach 8.1 m^3/min and the effective drainage distance can be extended up to 150 m or more. 展开更多
关键词 Retaining gob-side entryways Stability of borehole Gas pressure relief Co-extraction of coal and gas without the entry pillar
下载PDF
Layout and support technology of entry for pillar face 被引量:1
6
作者 Wang Jianli Xu Ying +2 位作者 Li Wenfeng Wang Xiangyu Bai Jianbiao 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第5期877-884,共8页
In order to improve the recovery rate of coal, some mines have begun to recover the residual protective pillars in the form of short wall faces. However, it is difficult to control stability of the haulage entry and t... In order to improve the recovery rate of coal, some mines have begun to recover the residual protective pillars in the form of short wall faces. However, it is difficult to control stability of the haulage entry and the ventilating entry under the mining influences of the pillar face and the two side faces. Thus the 4311 face, which was designed to recover the 57 m wide residual protective pillar in Guojiashan Coal Mine,was taken as engineering background. Distribution law of stress and plastic zone in the residual protective pillar was analyzed using the numerical simulation. Then the gob-side entry driving technology was proposed to layout the entries for the pillar face. Based on the analysis of stress distribution and deformation characteristics of surrounding rocks in gob-side entry driving with different width of narrow pillars, the width of the narrow pillar of the entries in the 4311 face was decided to be 4 m. In order to control stability of the gob-side entry driving, the mechanical model of the main roof was established and deformation characteristic of surrounding rock was analyzed. Then the bolt support technology with high strength and high pre-tightening force was proposed for entry support. Especially, the hydraulic expansion bolts were used to support the narrow pillar rib. The engineering results show that the width of the narrow pillar is reasonable and the entry support technology is effective. The research achievement can provide some references to pillar recovery for other coal mines. 展开更多
关键词 pillar recovery gob-side entry driving STABILITY Bolt support Hydraulic expansion bolt
下载PDF
特厚煤层沿空掘巷围岩支卸协同控制技术
7
作者 李化敏 王文强 +1 位作者 王祖洸 孙浩 《煤炭工程》 北大核心 2024年第2期45-51,共7页
针对特厚煤层小煤柱沿空掘巷大范围塑性全煤巷道锚网索的支护难题,以塔山煤矿8204-2小煤柱工作面为工程背景,采用现场实测、理论分析等方法,揭示了锚杆、锚索对沿空大范围塑性全煤巷道的支护机理。锚杆支护主要作用于浅部二次破碎区煤体... 针对特厚煤层小煤柱沿空掘巷大范围塑性全煤巷道锚网索的支护难题,以塔山煤矿8204-2小煤柱工作面为工程背景,采用现场实测、理论分析等方法,揭示了锚杆、锚索对沿空大范围塑性全煤巷道的支护机理。锚杆支护主要作用于浅部二次破碎区煤体,形成浅部连续承载结构;锚索主要作用于深部处于三向受力状态的稳定煤体,形成更大范围的连续稳定承载结构;进一步明确了锚杆、锚索有效长度的计算方法,形成了以高预紧力、高强“锚-网-索”支护为基础,以坚硬顶板井下磨料水射流切顶卸压、巷帮大直径钻孔卸压、底板卸压槽卸压为辅的“支卸协同”小煤柱沿空巷道围岩控制技术体系。工程应用结果表明,试验巷道围岩最大变形量小于700 mm,能够满足使用要求。 展开更多
关键词 特厚煤层 小煤柱 沿空掘巷 围岩控制 支卸协同 双层连续承载结构
下载PDF
综放面“双硬”煤层临空煤柱宽度及承载强度校核 被引量:1
8
作者 单成方 尚会杨 +3 位作者 张强 李亚锋 刘伟 黄鹏 《采矿与岩层控制工程学报》 EI 北大核心 2024年第2期88-99,共12页
具有“双硬”特征煤层的工作面其护巷煤柱的极限尺寸确定与常规工作面有所不同。以榆树岭煤矿505工作面沿空掘进巷道为背景,首先测试了煤岩样的力学性质和不同高径比煤样的抗压强度,得到了不同高径比煤样峰值强度曲线;其次分析了沿空掘... 具有“双硬”特征煤层的工作面其护巷煤柱的极限尺寸确定与常规工作面有所不同。以榆树岭煤矿505工作面沿空掘进巷道为背景,首先测试了煤岩样的力学性质和不同高径比煤样的抗压强度,得到了不同高径比煤样峰值强度曲线;其次分析了沿空掘巷覆岩结构模型,建立了沿空掘巷护巷煤柱顶板力学模型,得到了不同宽度煤柱所受的载荷应力;建立了不同高宽比煤柱的数值模型,得到了不同高宽比煤柱的极限强度校核公式;最后通过对比不同宽度煤柱所受的载荷应力和极限强度,得出4m宽度的煤柱即可满足支护要求,并在此基础上提出了沿空掘进巷道支护工艺。现场监测结果表明,煤柱宽度为4m时,巷道整体变形量较小,巷道稳定性得到有效维护。研究结果可为小煤柱护巷宽度的确定提供参考。 展开更多
关键词 “双硬”煤层 沿空掘巷 区段煤柱 支承应力 巷道稳定
下载PDF
窄煤柱沿空掘巷非对称支护力学特征与支护参数研究 被引量:2
9
作者 段计伟 《矿业安全与环保》 CAS 北大核心 2024年第1期147-153,160,共8页
为了研究窄煤柱沿空掘巷非对称支护下围岩变形与应力分布特征,采用理论分析方法,研究窄煤柱沿空巷道对称支护与非对称支护力学机理;基于马道头煤矿现场工程实践,采用数值模拟与工程效验方法,研究非对称支护下巷道围岩力学特征与稳定性... 为了研究窄煤柱沿空掘巷非对称支护下围岩变形与应力分布特征,采用理论分析方法,研究窄煤柱沿空巷道对称支护与非对称支护力学机理;基于马道头煤矿现场工程实践,采用数值模拟与工程效验方法,研究非对称支护下巷道围岩力学特征与稳定性。理论分析结果表明,非对称支护可有效降低巷道顶板弯矩,减小巷道顶底板与两帮变形量。模拟结果表明,煤柱内部压应力增高区与弹性核区保障了煤柱承载性能。现场实测结果表明,采用“锚索+槽型钢”非对称支护,巷道顶板、窄煤柱侧巷帮与实体煤侧巷帮最大变形量分别为100、79、62 mm,巷道松动圈与裂隙发育处于中等水平。 展开更多
关键词 窄煤柱 沿空掘巷 非对称支护 围岩稳定 力学特征
下载PDF
强动压松软煤体条件下沿空掘巷护巷煤柱尺寸研究
10
作者 王远东 秦江波 +1 位作者 徐大龙 顾伟 《山西煤炭》 2024年第2期1-7,30,共8页
针对强动压松软煤体条件下综采工作面沿空巷道围岩变形量大、稳定性差的难题,本文以赵庄煤矿5328工作面为研究背景,通过理论计算,得到了沿空掘巷煤柱尺寸的留设范围;然后通过建立数值模拟模型对多种宽度煤柱的围岩应力和塑性区进行分析... 针对强动压松软煤体条件下综采工作面沿空巷道围岩变形量大、稳定性差的难题,本文以赵庄煤矿5328工作面为研究背景,通过理论计算,得到了沿空掘巷煤柱尺寸的留设范围;然后通过建立数值模拟模型对多种宽度煤柱的围岩应力和塑性区进行分析,确定煤柱的合理尺寸为8 m。现场矿压监测结果表明,留设宽度为8 m的煤柱可以满足工作面安全生产要求。 展开更多
关键词 强动压 松软煤体 沿空掘巷 煤柱尺寸 数值模拟
下载PDF
近距离煤层沿空掘巷围岩稳定性分析
11
作者 马龙培 赵光明 +1 位作者 刘崇岩 戚敏杰 《煤炭技术》 CAS 2024年第6期99-104,共6页
合理的煤柱留设宽度及巷道布置错距不仅能保证煤炭的安全生产,还能提高煤炭资源的产出率,降低巷道支护的难度。以色连二矿近距离煤层群12409工作面为研究背景,采用理论分析得出沿空掘巷煤柱留设宽度,通过数值模拟研究了留设8 m小煤柱时... 合理的煤柱留设宽度及巷道布置错距不仅能保证煤炭的安全生产,还能提高煤炭资源的产出率,降低巷道支护的难度。以色连二矿近距离煤层群12409工作面为研究背景,采用理论分析得出沿空掘巷煤柱留设宽度,通过数值模拟研究了留设8 m小煤柱时回采巷道的稳定性,并进行现场工业性试验,监测回采期间巷道矿压显现规律。研究结果表明:①基于极限平衡理论及工程经验设计留设8 m小煤柱;②留设8 m小煤柱,测点超前工作面17 m时,煤柱内3.5~5.9 m分布式光纤应变值为-1 470~-7 268,表明煤柱内形成承载区域,利于巷道围岩控制;③回采期间,巷道顶底板及两帮的最大移近量分别为250、123 mm,在可控范围内,保证了矿井安全高效生产。 展开更多
关键词 近距离煤层 沿空掘巷 煤柱宽度 围岩稳定性
下载PDF
浅埋煤层留小煤柱沿空掘巷技术研究与应用 被引量:1
12
作者 张海瑞 《能源与节能》 2024年第1期197-199,203,共4页
在凤红煤业151302工作面采用沿空掘巷工艺技术,通过理论计算并结合数值模拟,综合分析确定了小煤柱的合理尺寸为5.0 m,同时优化了小煤柱巷道支护参数方案。工程应用结果表明:采用留小煤柱沿空掘巷技术,锚杆索受力远低于破断载荷;巷道顶... 在凤红煤业151302工作面采用沿空掘巷工艺技术,通过理论计算并结合数值模拟,综合分析确定了小煤柱的合理尺寸为5.0 m,同时优化了小煤柱巷道支护参数方案。工程应用结果表明:采用留小煤柱沿空掘巷技术,锚杆索受力远低于破断载荷;巷道顶板下沉位移在200 mm之内,回采帮内位移位小于200 mm,煤柱帮内位移在150 mm之内,巷道围岩和小煤柱皆处于稳定结构状况,整体围岩控制效果良好。 展开更多
关键词 浅埋煤层 小煤柱 沿空掘巷 数值模拟
下载PDF
同忻煤矿窄煤柱宽度留设及围岩控制实践
13
作者 贺雄 冯剑 +3 位作者 徐青云 李硕森 孙浩杰 赵晓渝 《陕西煤炭》 2024年第4期12-17,共6页
针对特厚煤层综放开采沿空掘巷时,留设宽煤柱护巷造成煤炭资源丢失严重,以及围岩变形量大、煤壁片帮等问题,以同忻煤矿8311工作面5311回风巷为工程背景,采用理论分析、数值模拟和现场观测相结合的方法,对其沿空掘巷护巷煤柱合理宽度的... 针对特厚煤层综放开采沿空掘巷时,留设宽煤柱护巷造成煤炭资源丢失严重,以及围岩变形量大、煤壁片帮等问题,以同忻煤矿8311工作面5311回风巷为工程背景,采用理论分析、数值模拟和现场观测相结合的方法,对其沿空掘巷护巷煤柱合理宽度的留设进行了分析。研究表明,理论分析得知留设煤柱宽度为6 m左右时可确保5311回风巷位于沿空边缘煤体支承压力降低区和煤体应力屈服区,有利于巷道围岩的稳定。基于3DEC数值模拟分析,得到留设6 m煤柱5311回风巷的稳定性以及8311工作面回采后沿空掘巷超前段顶板、实体煤帮、煤柱内围岩应力分布和塑性区演化特征。经现场应用,验证了综放开采留设窄煤柱掘巷技术的优越性和可靠性。 展开更多
关键词 特厚煤层 沿空掘巷 煤柱宽度 围岩控制 顶板破断特征
下载PDF
某孤岛工作面掘进技术研究
14
作者 计平 白永忠 +1 位作者 王海龙 席文强 《黑龙江科学》 2024年第14期82-85,共4页
某工作面为孤岛煤柱回收工作面,南北两翼为采空区,因此在掘进过程中严格执行作业规程要求,比对安全生产标准化和煤矿重大隐患判定标准要求,解决掘进过程中存在的问题,确保掘进工作安全顺利地开展。指出了煤柱回收工作面在掘进过程中可... 某工作面为孤岛煤柱回收工作面,南北两翼为采空区,因此在掘进过程中严格执行作业规程要求,比对安全生产标准化和煤矿重大隐患判定标准要求,解决掘进过程中存在的问题,确保掘进工作安全顺利地开展。指出了煤柱回收工作面在掘进过程中可能存在的各种困难,讨论分析确定了安全技术的管控措施,以确保顺利开展顺槽掘进工作。 展开更多
关键词 窄煤柱 掘进 支护
下载PDF
大采高工作面小煤柱沿空掘巷煤柱宽度优化及围岩控制技术研究
15
作者 史亚锋 任志新 +1 位作者 王阁 薛勇林 《煤炭技术》 CAS 2024年第4期84-89,共6页
以马泰壕矿3103辅运顺槽为研究对象,采用现场监测、内外应力场和极限平衡区理论、数值模拟等相结合方法,对大采高工作面小煤柱沿空掘巷煤柱宽度进行研究。研究表明:现场监测煤柱支承压力分布规律,最终初步设计沿空掘巷留设小煤柱宽度为6... 以马泰壕矿3103辅运顺槽为研究对象,采用现场监测、内外应力场和极限平衡区理论、数值模拟等相结合方法,对大采高工作面小煤柱沿空掘巷煤柱宽度进行研究。研究表明:现场监测煤柱支承压力分布规律,最终初步设计沿空掘巷留设小煤柱宽度为6~10 m;理论计算显示,小煤柱宽度合理范围为6.0~8.1 m;数值模拟表明,煤柱宽度大于6 m时,煤柱具有一定承载能力,煤柱上方和巷道顶板出现核心弹性区,有利于发挥锚固作用,煤柱宽度越大,应力集中现象越明显,综合考虑小煤柱宽度为6 m。基于此,提出了“锚网索支护+卸压+滞后沿空侧注浆加固+回采期间周期来压附近补强支护”围岩控制技术,现场应用效果良好。 展开更多
关键词 大采高工作面 小煤柱 数值模拟 沿空掘巷 围岩控制
下载PDF
切顶条件下窄煤柱护巷围岩稳定性研究
16
作者 陈宪伟 石媛 吕振 《煤炭与化工》 CAS 2024年第1期18-21,共4页
针对上区段采空区边缘进行切顶卸压,采用数值模拟方法通过对比不同切顶高度下煤柱及巷道围岩卸压规律,分析巷道围岩与上区段采空区切断联系后覆岩中应力转移规律。结果表明:切顶卸压可实现巷道围岩应力的主动调控,切顶条件下与未切顶条... 针对上区段采空区边缘进行切顶卸压,采用数值模拟方法通过对比不同切顶高度下煤柱及巷道围岩卸压规律,分析巷道围岩与上区段采空区切断联系后覆岩中应力转移规律。结果表明:切顶卸压可实现巷道围岩应力的主动调控,切顶条件下与未切顶条件下,其应力分布及位移表现出完全相反的变化趋势,切顶不仅降低了巷道围岩的应力峰值,同时降低了其整体位移量。增大切顶高度后,应力峰值降低程度并不大。 展开更多
关键词 切顶卸压 沿空掘巷 窄煤柱 数值模拟
下载PDF
窄煤柱工作面巷旁充填沿空留巷控制技术及应用
17
作者 任高飞 《能源与节能》 2024年第1期124-127,共4页
主要研究了窄煤柱工作面巷旁充填沿空留巷控制技术及应用。为了探讨煤柱的合理宽度,提出了最小煤柱宽度和最大煤柱宽度的计算方法,分析了充填沿空留巷支护方案的设计,以及如何应对窄煤柱工作面的安全问题。对于窄煤柱工作面,煤柱宽度不... 主要研究了窄煤柱工作面巷旁充填沿空留巷控制技术及应用。为了探讨煤柱的合理宽度,提出了最小煤柱宽度和最大煤柱宽度的计算方法,分析了充填沿空留巷支护方案的设计,以及如何应对窄煤柱工作面的安全问题。对于窄煤柱工作面,煤柱宽度不宜过大或过小,需要在安全和经济的基础上确定合理的范围,有效避免因煤柱宽度不合理而导致的安全事故,从而为窄煤柱工作面的安全生产提供一定的理论和实践参考。 展开更多
关键词 窄煤柱工作面 巷旁充填 沿空留巷 控制技术
下载PDF
厚煤层小煤柱沿空掘巷围岩控制技术研究
18
作者 侯宇峰 高翔宇 《能源与节能》 2024年第8期122-125,180,共5页
程庄煤矿15#煤层原采用25~30 m大煤柱护巷,导致临空巷道动压大、维护困难,且资源浪费较严重。以15308综放工作面为工程背景,通过使用理论计算、工程类比等手段,确定了最佳小煤柱护巷尺寸为6 m,同时采用爆破切顶、优化巷道支护参数,并配... 程庄煤矿15#煤层原采用25~30 m大煤柱护巷,导致临空巷道动压大、维护困难,且资源浪费较严重。以15308综放工作面为工程背景,通过使用理论计算、工程类比等手段,确定了最佳小煤柱护巷尺寸为6 m,同时采用爆破切顶、优化巷道支护参数,并配合注浆加固、喷浆、卸压槽等诸多措施,实现了小煤柱的沿空掘巷,既降低了临空巷道动压对巷道的影响,又减少了煤炭资源的浪费,延长了矿井服务年限。 展开更多
关键词 小煤柱 沿空掘巷 围岩控制
下载PDF
小煤柱沿空掘巷围岩控制技术在成庄矿大断面巷道条件下的应用
19
作者 宋朋飞 《晋控科学技术》 2024年第2期51-54,共4页
针对晋能控股装备制造集团成庄矿护巷煤柱尺寸过大、资源回收率低等诸多问题,以4317工作面为工程背景,采用理论计算与工程类比相结合的方式,确定最优煤柱尺寸,提出巷道锚网索支护方案,并对巷道破碎段预注浆加固技术、临近硐室充填技术... 针对晋能控股装备制造集团成庄矿护巷煤柱尺寸过大、资源回收率低等诸多问题,以4317工作面为工程背景,采用理论计算与工程类比相结合的方式,确定最优煤柱尺寸,提出巷道锚网索支护方案,并对巷道破碎段预注浆加固技术、临近硐室充填技术进行研究。现场应用表明:43172巷顶底板移近量不超过90 mm,两帮移近量不超过160 mm,巷道围岩变形控制效果良好。 展开更多
关键词 小煤柱 沿空掘巷 控制
下载PDF
窄煤柱沿空巷道注浆加固技术研究
20
作者 申泽晖 蒋王军 《煤炭科技》 2024年第4期213-218,共6页
以青洼煤业21041胶带进风巷道为研究对象,针对21041巷道窄煤柱在现有支护下出现的巷道变形严重、煤柱失效破坏的难题,在已有的支护条件下,通过理论分析和数值模拟,对窄煤柱注浆加固方案及参数进行研究,并确定了对应的注浆加固方案;根据... 以青洼煤业21041胶带进风巷道为研究对象,针对21041巷道窄煤柱在现有支护下出现的巷道变形严重、煤柱失效破坏的难题,在已有的支护条件下,通过理论分析和数值模拟,对窄煤柱注浆加固方案及参数进行研究,并确定了对应的注浆加固方案;根据现场矿压监测结果,注浆后巷道围岩位移量得到了有效控制,注浆有效地加固了巷道,保障了工作面的安全生产。 展开更多
关键词 窄煤柱 沿空巷道 注浆加固 围岩变形