期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Full-area Exploration Test of Deep Concealed Ore Bodies based on Tunnel Gravity
1
作者 ZENG Youqiang ZENG Gaofu +2 位作者 HUANG Lishan GUO Jianlei WANG Jianchao 《Acta Geologica Sinica(English Edition)》 SCIE CAS CSCD 2021年第S01期94-98,共5页
Metal mineral resources are the product of the deep material and energy exchange with its deep power process(Wan,2017).It is the foundation of contemporary national economic development,a priority area for the country... Metal mineral resources are the product of the deep material and energy exchange with its deep power process(Wan,2017).It is the foundation of contemporary national economic development,a priority area for the country’s implementation of strategic development. 展开更多
关键词 tunnel gravity exploration localization exploration in full-area concealed orebodies deep detection
下载PDF
Energy saving analysis of segment positioning in shield tunneling machine considering assembling path optimization 被引量:4
2
作者 施虎 龚国芳 +1 位作者 杨华勇 梅雪松 《Journal of Central South University》 SCIE EI CAS 2014年第12期4526-4536,共11页
A motion parameter optimization method based on the objective of minimizing the total energy consumption in segment positioning was proposed for segment erector of shield tunneling machine. The segment positioning pro... A motion parameter optimization method based on the objective of minimizing the total energy consumption in segment positioning was proposed for segment erector of shield tunneling machine. The segment positioning process was decomposed into rotation, lifting and sliding actions in deriving the energy calculation model of segment erection. The work of gravity was taken into account in the mathematical modeling of energy consumed by each actuator. In order to investigate the relationship between the work done by the actuator and the path moved along by the segment, the upward and downward directions as well as the operating quadrant of the segment erector were defined. Piecewise nonlinear function of energy was presented, of which the result is determined by closely coupled components as working parameters and some intermediate variables. Finally, the effectiveness of the optimization method was proved by conducting a case study with a segment erector for the tunnel with a diameter of 3 m and drawing comparisons between different assembling paths. The results show that the energy required by assembling a ring of segments along the optimized moving path can be reduced up to 5%. The method proposed in this work definitely provides an effective energy saving solution for shield tunneling machine. 展开更多
关键词 energy saving segment erector work of gravity path optimization shield tunneling machine
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部