In order to ease the fossil energy crunch,new energy sources need to be fully utilized.Clean energy sources such as wind,light,and nuclear energy are important tools to solve environmental and energy problems.However,...In order to ease the fossil energy crunch,new energy sources need to be fully utilized.Clean energy sources such as wind,light,and nuclear energy are important tools to solve environmental and energy problems.However,in the process of researching new energy farms,there are some problems when they are integrated into the power system.In order to ensure the stability of new energy power plants,it is necessary to conduct an in-depth analysis of the grid connection technology of new energy farms.In the study,it is necessary to learn about the specific problems of the stability of the grid connection of new energy power plants,and to clarify the specific application of the grid connection technology of new energy power plants from the application principle and advantages of the grid connection technology of new energy power plants.Through simulation experiments,the positive effect of grid connection technology of new energy power plants in improving the stability of power systems was determined.展开更多
This paper presents the development and performance capability of a comprehensive Low voltage ride through (LVRT) control scheme that makes use of both the DC chopper and the current limiting based on the required rea...This paper presents the development and performance capability of a comprehensive Low voltage ride through (LVRT) control scheme that makes use of both the DC chopper and the current limiting based on the required reactive power during fault time. The study is conducted on an 8.5 MW single stage PV power plant (PVPP) connected to the Rwandan grid. In the event of fault disturbance, this control scheme helps to overcome the problems of excessive DC-link voltage by fast activation of the DC chopper operation. At the same instance, AC current is limited to the maximum rating of the inverter as a function of the injected reactive current. This helps overcome AC-over- current that may possibly lead to damage or disconnection of the inverter. The control scheme also ensures voltage support and power balance through the injection of reactive current as per grid code requirements. Selected simulations using MATLAB are carried out in the events of different kinds of fault caused voltage dips. Results demonstrate the effectiveness of the proposed LVRT control scheme.展开更多
Distributed photovoltaic power (PV) is the main development model of distributed generation. It is necessary to research on dispatching and operation management with large-scale distributed PV connected. This paper an...Distributed photovoltaic power (PV) is the main development model of distributed generation. It is necessary to research on dispatching and operation management with large-scale distributed PV connected. This paper analyzes development status, technical requirement and dispatching and operation management situation of distributed PV in Germany and China. Then introduce the preparation of distributed PV dispatching and operation management criterion. Through summarizing the experiences and lessons of large-scale distributed PV development in Germany, it gives advice to the development of distributed PV dispatching and operation management in China.展开更多
Now the energy efficiency of the PV power plant is low.For this case,this paper presents a PV power plant energy scheduling strategy.It includes new grid scheme and scheduling algorithm.Through the establishment of PV...Now the energy efficiency of the PV power plant is low.For this case,this paper presents a PV power plant energy scheduling strategy.It includes new grid scheme and scheduling algorithm.Through the establishment of PV power station network model and the method of computer simulation of its scheduling algorithm,this paper describes its realization way,and then proves that the scheduling strat egy is correct and the effectiveness of improving energy conversion rate.At the same time,the PV power station scheduling strategy aslo re duces the environmental pollution,and alleviates the energy crisis and environmental crisis.展开更多
碳捕集电厂(carbon capture power plant,CCPP)在降低碳排放的同时,增强了电力系统的灵活性,是促进可再生能源消纳和低碳化转型的关键。考虑CCPP运行的灵活性,提出一种网‒储联合规划方法。针对海量场景规划计算困难的问题,利用改进k-me...碳捕集电厂(carbon capture power plant,CCPP)在降低碳排放的同时,增强了电力系统的灵活性,是促进可再生能源消纳和低碳化转型的关键。考虑CCPP运行的灵活性,提出一种网‒储联合规划方法。针对海量场景规划计算困难的问题,利用改进k-means算法对风电出力场景进行削减,并基于Spearman系数筛选典型出力场景。分析CCPP的灵活性运行机理,构建电力系统灵活性供给模型和量化指标。建立考虑CCPP的网‒储双层优化模型,在规划层中确定输电线路和储能的配置方案,并在运行层中考虑CCPP的灵活性。以改进IEEE RTS-24节点系统为算例进行分析,结果表明:所提规划方法能够提高电力系统的灵活性裕度,降低输电线路和储能的投资成本。研究结果证明了所提规划方法的有效性。展开更多
文摘In order to ease the fossil energy crunch,new energy sources need to be fully utilized.Clean energy sources such as wind,light,and nuclear energy are important tools to solve environmental and energy problems.However,in the process of researching new energy farms,there are some problems when they are integrated into the power system.In order to ensure the stability of new energy power plants,it is necessary to conduct an in-depth analysis of the grid connection technology of new energy farms.In the study,it is necessary to learn about the specific problems of the stability of the grid connection of new energy power plants,and to clarify the specific application of the grid connection technology of new energy power plants from the application principle and advantages of the grid connection technology of new energy power plants.Through simulation experiments,the positive effect of grid connection technology of new energy power plants in improving the stability of power systems was determined.
文摘This paper presents the development and performance capability of a comprehensive Low voltage ride through (LVRT) control scheme that makes use of both the DC chopper and the current limiting based on the required reactive power during fault time. The study is conducted on an 8.5 MW single stage PV power plant (PVPP) connected to the Rwandan grid. In the event of fault disturbance, this control scheme helps to overcome the problems of excessive DC-link voltage by fast activation of the DC chopper operation. At the same instance, AC current is limited to the maximum rating of the inverter as a function of the injected reactive current. This helps overcome AC-over- current that may possibly lead to damage or disconnection of the inverter. The control scheme also ensures voltage support and power balance through the injection of reactive current as per grid code requirements. Selected simulations using MATLAB are carried out in the events of different kinds of fault caused voltage dips. Results demonstrate the effectiveness of the proposed LVRT control scheme.
文摘Distributed photovoltaic power (PV) is the main development model of distributed generation. It is necessary to research on dispatching and operation management with large-scale distributed PV connected. This paper analyzes development status, technical requirement and dispatching and operation management situation of distributed PV in Germany and China. Then introduce the preparation of distributed PV dispatching and operation management criterion. Through summarizing the experiences and lessons of large-scale distributed PV development in Germany, it gives advice to the development of distributed PV dispatching and operation management in China.
文摘Now the energy efficiency of the PV power plant is low.For this case,this paper presents a PV power plant energy scheduling strategy.It includes new grid scheme and scheduling algorithm.Through the establishment of PV power station network model and the method of computer simulation of its scheduling algorithm,this paper describes its realization way,and then proves that the scheduling strat egy is correct and the effectiveness of improving energy conversion rate.At the same time,the PV power station scheduling strategy aslo re duces the environmental pollution,and alleviates the energy crisis and environmental crisis.
文摘碳捕集电厂(carbon capture power plant,CCPP)在降低碳排放的同时,增强了电力系统的灵活性,是促进可再生能源消纳和低碳化转型的关键。考虑CCPP运行的灵活性,提出一种网‒储联合规划方法。针对海量场景规划计算困难的问题,利用改进k-means算法对风电出力场景进行削减,并基于Spearman系数筛选典型出力场景。分析CCPP的灵活性运行机理,构建电力系统灵活性供给模型和量化指标。建立考虑CCPP的网‒储双层优化模型,在规划层中确定输电线路和储能的配置方案,并在运行层中考虑CCPP的灵活性。以改进IEEE RTS-24节点系统为算例进行分析,结果表明:所提规划方法能够提高电力系统的灵活性裕度,降低输电线路和储能的投资成本。研究结果证明了所提规划方法的有效性。