A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the s...A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the safety and reliability of residential electricity consumption.it is necessary to actively plan and modify the distribution network’s structure in the power grid,improve the quality of the distribution network,and optimize the planning of the distribution network,so that the network can be fully utilized to meet the needs of electricity consumption.In this paper,a distribution network grid planning algorithm based on the reliability of electricity consumption was completed using ant colony algorithm.For the distribution network structure planning of dual power sources,the parallel ant colony algorithm was used to prove that the premise of parallelism is the interactive process of ant colonies,and the dual power distribution network structure model is established based on the principle of the lowest cost.The artificial ants in the algorithm were compared with real ants in nature,and the basic steps and working principle of the ant colony optimization algorithm was studied with the help of the travelling salesman problem(TSP).Then,the limitations of the ant colony algorithm were analyzed,and an improvement strategy was proposed by using python for digital simulation.The results demonstrated the reliability of model-building and algorithm improvement.展开更多
Given the increasing uncertainties in power supply and load,this paper proposes the concept of power source and grid coordination uniformity planning.In this approach,the standard deviation of the transmission line lo...Given the increasing uncertainties in power supply and load,this paper proposes the concept of power source and grid coordination uniformity planning.In this approach,the standard deviation of the transmission line load rate is considered as the uniformity evaluation index for power source and grid planning.A multi-stage and multi-objective optimization model of the power source and grid expansion planning is established to minimize the comprehensive cost of the entire planning cycle.In this study,the improved particle swarm optimization algorithm and genetic algorithm are combined to solve the model,thus improving the efficiency and accuracy of the solution.The analysis of a simple IEEE Garver’s 6-node system shows that the model and solution method are effective and feasible.Moreover,they are suitable for the coordinated planning of the power source and grid under a diversified nature of power supply and load.展开更多
The safety and stability study on Northeast, North, East, Northwest and Central China power grids had been carried out, which provided technical supports to planning design of regional power grids. By analyzing safety...The safety and stability study on Northeast, North, East, Northwest and Central China power grids had been carried out, which provided technical supports to planning design of regional power grids. By analyzing safety and stability under severe faults in regional power grids, revealed weaknesses on power grid configurations and measures for preventing from loss of stability were presented. In comparison of various schemes of power system safety and stability among parts of power grids, more than two recommended schemes can be chosen as reference in planning design for regional power grids. Considering the safety and stability control measures necessary for each power grids, it is believed the trunk networks of all power grids can fulfill the third criteria of Guideline for Power System Safety and Stability, while the weakness and predominated hydropower may deteriorate safety and stability of power grids. The power grid shall be regulated in line with the variation of boundary conditions.展开更多
The reasonability of the adopted capacity load ratio numerical value in urban power grid planning determines the economy of planning level yearly power grid.Too large capacity load ratio will result in the increasing ...The reasonability of the adopted capacity load ratio numerical value in urban power grid planning determines the economy of planning level yearly power grid.Too large capacity load ratio will result in the increasing investment in the early period of power grid construction, however, too small capacity load ratio will make the power grid have poor adaptability, affecting the power supply. Reasonably determining the adopted regional power grid capacity load ratio quantitative numerical value in planning has a strong guiding significance for constructing reliable and economic power grid and preventing power grid from excessive advance or lagging behind the load development. This paper, through the statistics and analysis of a certain regional power grid 2010-2012 three years' power grid daily load characteristics and the investment benefit evaluation of three years' 220KV power grid individual project, makes a preliminary analysis and puts forwards the specific advice on the reasonable values of power ~rid 35-220KV power transformation capacity load ratio.展开更多
An exclusive interview with the author was published in Issue 2,2010 of this journal,in which the starting point and macro-strategy to construct smart grid in China was presented.Meanwhile,the three periods of smart g...An exclusive interview with the author was published in Issue 2,2010 of this journal,in which the starting point and macro-strategy to construct smart grid in China was presented.Meanwhile,the three periods of smart grid construction were also mentioned,namely planning and pilot project construction period,overall construction period,and improving and upgrading period as it is planned by SGCC.At the invitation of this journal,the author wrote an article further introducing the implementation in the first period of SGCC smart grid program.The article will be published in two consecutive issues.展开更多
In the article, the methods of processing and obtaining multicomponent raw materials were investigated with the properties of multicomponent threads obtained from fiber waste cluster enterprises in textile production,...In the article, the methods of processing and obtaining multicomponent raw materials were investigated with the properties of multicomponent threads obtained from fiber waste cluster enterprises in textile production, the interrelation of the components sorting composition. To solve the problem, we used the cause-effect relationship of information theory from the grid planning Matrix, solving the dependence of raw materials, physical and mechanical parameters and the established characteristics of the product. Empirical correlations were obtained on the nature and mechanism of the relationship between factors, which allowed the system to establish a theory of control and prediction of behavior. The methods of evaluation used in this study make it possible to expand the information base with respect to these indicators and to use them in the production of fabrics and threads with established characteristics.展开更多
Solving AC-Optimal Power Flow(OPF)problems is an essential task for grid operators to keep the power system safe for the use cases such as minimization of total generation cost or minimization of infeed curtailment fr...Solving AC-Optimal Power Flow(OPF)problems is an essential task for grid operators to keep the power system safe for the use cases such as minimization of total generation cost or minimization of infeed curtailment from renewable DERs(Distributed Energy Resource).Mathematical solvers are often able to solve the AC-OPF problem but need significant computation time.Artificial neural networks(ANN)have a good application in function approximation with outstanding computational performance.In this paper,we employ ANN to approximate the solution of AC-OPF for multiple purposes.The novelty of our work is a new training method based on the reinforcement learning concept.A high-performance batched power flow solver is used as the physical environment for training,which evaluates an augmented loss function and the numerical action gradient.The augmented loss function consists of the objective term for each use case and the penalty term for constraints violation.This training method enables training without a reference OPF and the integration of discrete decision variable such as discrete transformer tap changer position in the constrained optimization.To improve the optimality of the approximation,we further combine the reinforcement training approach with supervised training labeled by reference OPF.Various benchmark results show the high approximation quality of our proposed approach while achieving high computational efficiency on multiple use cases.展开更多
文摘A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the safety and reliability of residential electricity consumption.it is necessary to actively plan and modify the distribution network’s structure in the power grid,improve the quality of the distribution network,and optimize the planning of the distribution network,so that the network can be fully utilized to meet the needs of electricity consumption.In this paper,a distribution network grid planning algorithm based on the reliability of electricity consumption was completed using ant colony algorithm.For the distribution network structure planning of dual power sources,the parallel ant colony algorithm was used to prove that the premise of parallelism is the interactive process of ant colonies,and the dual power distribution network structure model is established based on the principle of the lowest cost.The artificial ants in the algorithm were compared with real ants in nature,and the basic steps and working principle of the ant colony optimization algorithm was studied with the help of the travelling salesman problem(TSP).Then,the limitations of the ant colony algorithm were analyzed,and an improvement strategy was proposed by using python for digital simulation.The results demonstrated the reliability of model-building and algorithm improvement.
基金supported by Theoretical study of power system synergistic dispatch National Science Foundation of China(51477091).
文摘Given the increasing uncertainties in power supply and load,this paper proposes the concept of power source and grid coordination uniformity planning.In this approach,the standard deviation of the transmission line load rate is considered as the uniformity evaluation index for power source and grid planning.A multi-stage and multi-objective optimization model of the power source and grid expansion planning is established to minimize the comprehensive cost of the entire planning cycle.In this study,the improved particle swarm optimization algorithm and genetic algorithm are combined to solve the model,thus improving the efficiency and accuracy of the solution.The analysis of a simple IEEE Garver’s 6-node system shows that the model and solution method are effective and feasible.Moreover,they are suitable for the coordinated planning of the power source and grid under a diversified nature of power supply and load.
文摘The safety and stability study on Northeast, North, East, Northwest and Central China power grids had been carried out, which provided technical supports to planning design of regional power grids. By analyzing safety and stability under severe faults in regional power grids, revealed weaknesses on power grid configurations and measures for preventing from loss of stability were presented. In comparison of various schemes of power system safety and stability among parts of power grids, more than two recommended schemes can be chosen as reference in planning design for regional power grids. Considering the safety and stability control measures necessary for each power grids, it is believed the trunk networks of all power grids can fulfill the third criteria of Guideline for Power System Safety and Stability, while the weakness and predominated hydropower may deteriorate safety and stability of power grids. The power grid shall be regulated in line with the variation of boundary conditions.
文摘The reasonability of the adopted capacity load ratio numerical value in urban power grid planning determines the economy of planning level yearly power grid.Too large capacity load ratio will result in the increasing investment in the early period of power grid construction, however, too small capacity load ratio will make the power grid have poor adaptability, affecting the power supply. Reasonably determining the adopted regional power grid capacity load ratio quantitative numerical value in planning has a strong guiding significance for constructing reliable and economic power grid and preventing power grid from excessive advance or lagging behind the load development. This paper, through the statistics and analysis of a certain regional power grid 2010-2012 three years' power grid daily load characteristics and the investment benefit evaluation of three years' 220KV power grid individual project, makes a preliminary analysis and puts forwards the specific advice on the reasonable values of power ~rid 35-220KV power transformation capacity load ratio.
文摘An exclusive interview with the author was published in Issue 2,2010 of this journal,in which the starting point and macro-strategy to construct smart grid in China was presented.Meanwhile,the three periods of smart grid construction were also mentioned,namely planning and pilot project construction period,overall construction period,and improving and upgrading period as it is planned by SGCC.At the invitation of this journal,the author wrote an article further introducing the implementation in the first period of SGCC smart grid program.The article will be published in two consecutive issues.
文摘In the article, the methods of processing and obtaining multicomponent raw materials were investigated with the properties of multicomponent threads obtained from fiber waste cluster enterprises in textile production, the interrelation of the components sorting composition. To solve the problem, we used the cause-effect relationship of information theory from the grid planning Matrix, solving the dependence of raw materials, physical and mechanical parameters and the established characteristics of the product. Empirical correlations were obtained on the nature and mechanism of the relationship between factors, which allowed the system to establish a theory of control and prediction of behavior. The methods of evaluation used in this study make it possible to expand the information base with respect to these indicators and to use them in the production of fabrics and threads with established characteristics.
基金The authors would like to thank Dr.-Ing.Nils Bornhorst for the fruitful discussion.The publication and development of this work was funded by the Hessian Ministry of Higher Education,Research,Science and the Arts,Germany through the K-ES project under reference number:511/17.001.
文摘Solving AC-Optimal Power Flow(OPF)problems is an essential task for grid operators to keep the power system safe for the use cases such as minimization of total generation cost or minimization of infeed curtailment from renewable DERs(Distributed Energy Resource).Mathematical solvers are often able to solve the AC-OPF problem but need significant computation time.Artificial neural networks(ANN)have a good application in function approximation with outstanding computational performance.In this paper,we employ ANN to approximate the solution of AC-OPF for multiple purposes.The novelty of our work is a new training method based on the reinforcement learning concept.A high-performance batched power flow solver is used as the physical environment for training,which evaluates an augmented loss function and the numerical action gradient.The augmented loss function consists of the objective term for each use case and the penalty term for constraints violation.This training method enables training without a reference OPF and the integration of discrete decision variable such as discrete transformer tap changer position in the constrained optimization.To improve the optimality of the approximation,we further combine the reinforcement training approach with supervised training labeled by reference OPF.Various benchmark results show the high approximation quality of our proposed approach while achieving high computational efficiency on multiple use cases.