To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of re...To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of residual wind power.By studying the mathematical model of wind power output and calculating surplus wind power,as well as considering the hydrogen production/storage characteristics of the electrolyzer and hydrogen storage tank,an innovative capacity optimization allocation model was established.The objective of the model was to achieve the lowest total net present value over the entire life cycle.The model took into account the cost-benefit breakdown of equipment end-of-life cost,replacement cost,residual value gain,wind abandonment penalty,hydrogen transportation,and environmental value.The MATLAB-based platform invoked the CPLEX commercial solver to solve the model.Combined with the analysis of the annual average wind speed data from an offshore wind farm in Guangdong Province,the optimal capacity configuration results and the actual operation of the hydrogen production system were obtained.Under the calculation scenario,this hydrogen production system could consume 3,800 MWh of residual electricity from offshore wind power each year.It could achieve complete consumption of residual electricity from wind power without incurring the penalty cost of wind power.Additionally,it could produce 66,500 kg of green hydrogen from wind power,resulting in hydrogen sales revenue of 3.63 million RMB.It would also reduce pollutant emissions from coal-based hydrogen production by 1.5 tons and realize an environmental value of 4.83 million RMB.The annual net operating income exceeded 6 million RMB and the whole life cycle NPV income exceeded 50 million RMB.These results verified the feasibility and rationality of the established capacity optimization allocation model.The model could help advance power system planning and operation research and assist offshore wind farm operators in improving economic and environmental benefits.展开更多
In order to play a positive role of decentralised wind power on-grid for voltage stability improvement and loss reduction of distribution network,a multi-objective two-stage decentralised wind power planning method is...In order to play a positive role of decentralised wind power on-grid for voltage stability improvement and loss reduction of distribution network,a multi-objective two-stage decentralised wind power planning method is proposed in the paper,which takes into account the network loss correction for the extreme cold region.Firstly,an electro-thermal model is introduced to reflect the effect of temperature on conductor resistance and to correct the results of active network loss calculation;secondly,a two-stage multi-objective two-stage decentralised wind power siting and capacity allocation and reactive voltage optimisation control model is constructed to take account of the network loss correction,and the multi-objective multi-planning model is established in the first stage to consider the whole-life cycle investment cost of WTGs,the system operating cost and the voltage quality of power supply,and the multi-objective planning model is established in the second stage.planning model,and the second stage further develops the reactive voltage control strategy of WTGs on this basis,and obtains the distribution network loss reduction method based on WTG siting and capacity allocation and reactive power control strategy.Finally,the optimal configuration scheme is solved by the manta ray foraging optimisation(MRFO)algorithm,and the loss of each branch line and bus loss of the distribution network before and after the adoption of this loss reduction method is calculated by taking the IEEE33 distribution system as an example,which verifies the practicability and validity of the proposed method,and provides a reference introduction for decision-making for the distributed energy planning of the distribution network.展开更多
Research on wind power capacity credit at the operational level plays an important role in power system dispatching.With the popularity of energy storage devices,it is increasingly necessary to study the impact of ene...Research on wind power capacity credit at the operational level plays an important role in power system dispatching.With the popularity of energy storage devices,it is increasingly necessary to study the impact of energy storage devices on wind power operational capacity credit.The definition of wind power operational capacity credit is given.The available capacity model of different generators and the charging and discharging model of the energy storage are established.Based on the above model,the evaluation method of wind power operation credible capacity considering energy storage devices is proposed.The influence of energy storage on the wind power operation credible capacity is obtained by case study,which is of great help for the power system dispatching operation and wind power accommodation.展开更多
With the advance in renewable generation technologies, the cost of renewable energy becomes increasingly competitive when compared to fossil fuel-based generation resources. It is economically beneficial to integrate ...With the advance in renewable generation technologies, the cost of renewable energy becomes increasingly competitive when compared to fossil fuel-based generation resources. It is economically beneficial to integrate large amounts of renewable capacity in power systems. Unlike traditional generation facilities, however, using renewable resources for generation presents technical challenges in producing continuous power. In this report, an Energy Storage System (ESS) is integrated to smooth the variations in renewable power production and ensure the output power more controllable. Since it requires capital investment for the storage devices, it is important to obtain reasonable estimate of the storage capacities. This project is therefore formulated as an optimization problem in determining the two dominating factors of the capital cost for the ESS: the power capacity and the energy capacity. The objective is to make the renewable power more reliable and simultaneously maximize the economic benefits that can be obtained from the scheme. To make the results more convincing, analyses in this report start with wind generation, for wind has greater variability and unpredictability than other renewable sources. Selection of ESS type is narrowed down to battery energy storage system (BESS) in the scheme. However, the methods presented here are suitable for any type of energy storage methods and are also useful for intermittent renewable energy resources other than wind.展开更多
Since the connection of small-scale wind farms to distribution networks,power grid voltage stability has been reduced with increasing wind penetration in recent years,owing to the variable reactive power consumption o...Since the connection of small-scale wind farms to distribution networks,power grid voltage stability has been reduced with increasing wind penetration in recent years,owing to the variable reactive power consumption of wind generators.In this study,a two-stage reactive power optimization method based on the alternating direction method of multipliers(ADMM)algorithm is proposed for achieving optimal reactive power dispatch in wind farm-integrated distribution systems.Unlike existing optimal reactive power control methods,the proposed method enables distributed reactive power flow optimization with a two-stage optimization structure.Furthermore,under the partition concept,the consensus protocol is not needed to solve the optimization problems.In this method,the influence of the wake effect of each wind turbine is also considered in the control design.Simulation results for a mid-voltage distribution system based on MATLAB verified the effectiveness of the proposed method.展开更多
The 10-GW-class Jiuquan Wind Power Base in Gansu Province is to get its Phase I Project completed soon, and will further expand and become the world largest wind power base in the future. Whether electricity from the ...The 10-GW-class Jiuquan Wind Power Base in Gansu Province is to get its Phase I Project completed soon, and will further expand and become the world largest wind power base in the future. Whether electricity from the wind power base can be delivered on such a large scale becomes the focus of attention of the world. This paper analyzes four challenges facing the wind power base, including transmission capability, peak regulation and frequency modulation, capacity balance and generation accommodation, as well as system stability.展开更多
The wind power generation is increasing in many countries as a result of decreasing technology costs, active government policies for renewable energy sources, environmental concerns, etc.. This paper investigates the ...The wind power generation is increasing in many countries as a result of decreasing technology costs, active government policies for renewable energy sources, environmental concerns, etc.. This paper investigates the impact of wind power generation on ATC (available transmission capacity) calculation. In order to determine the maximum incremental MW transfer possible between two parts of a power system without violating any specified limits, ATCs are calculated. When calculating ATC values, it is necessary to assume production and consumption pattern in power system. Production of wind power depends on the wind speed, which is a random variable and it is impossible to forecast exactly the production of wind power that is needed for the ATCs calculation. In order to investigate influence of the stochastic wind power production on the ATCs value, computer model of Croatian electric power system is made in Power World Simulator. ATCs are calculated for southern part of Croatian power system in which besides wind power, hydro power plants are only type of power generation. Available wind speed measurements are used as input data for wind power production. The results of the ATC calculation for different scenario of wind power production and location in the Southern Croatian power system are presented and discussed in the paper.展开更多
Economic issue is the very focus of China's wind power development.Although all the security problems can be dealt with through technical measures,the compensation for supportive thermal power units and the subsid...Economic issue is the very focus of China's wind power development.Although all the security problems can be dealt with through technical measures,the compensation for supportive thermal power units and the subsidy from economically developed regions to resource-outputting regions would require a higher level of strategic considerations.The core purpose of developing wind energy is to reduce pollutant emissions,so planners should take into account the overall cost of all sides,without touching the bottom of social affordability.展开更多
基金supported by Manage Innovation Project of China Southern Power Grid Co.,Ltd.(No.GZHKJXM20210232).
文摘To solve the problem of residual wind power in offshore wind farms,a hydrogen production system with a reasonable capacity was configured to enhance the local load of wind farms and promote the local consumption of residual wind power.By studying the mathematical model of wind power output and calculating surplus wind power,as well as considering the hydrogen production/storage characteristics of the electrolyzer and hydrogen storage tank,an innovative capacity optimization allocation model was established.The objective of the model was to achieve the lowest total net present value over the entire life cycle.The model took into account the cost-benefit breakdown of equipment end-of-life cost,replacement cost,residual value gain,wind abandonment penalty,hydrogen transportation,and environmental value.The MATLAB-based platform invoked the CPLEX commercial solver to solve the model.Combined with the analysis of the annual average wind speed data from an offshore wind farm in Guangdong Province,the optimal capacity configuration results and the actual operation of the hydrogen production system were obtained.Under the calculation scenario,this hydrogen production system could consume 3,800 MWh of residual electricity from offshore wind power each year.It could achieve complete consumption of residual electricity from wind power without incurring the penalty cost of wind power.Additionally,it could produce 66,500 kg of green hydrogen from wind power,resulting in hydrogen sales revenue of 3.63 million RMB.It would also reduce pollutant emissions from coal-based hydrogen production by 1.5 tons and realize an environmental value of 4.83 million RMB.The annual net operating income exceeded 6 million RMB and the whole life cycle NPV income exceeded 50 million RMB.These results verified the feasibility and rationality of the established capacity optimization allocation model.The model could help advance power system planning and operation research and assist offshore wind farm operators in improving economic and environmental benefits.
基金supported by the National Natural Science Foundation of China(52177081).
文摘In order to play a positive role of decentralised wind power on-grid for voltage stability improvement and loss reduction of distribution network,a multi-objective two-stage decentralised wind power planning method is proposed in the paper,which takes into account the network loss correction for the extreme cold region.Firstly,an electro-thermal model is introduced to reflect the effect of temperature on conductor resistance and to correct the results of active network loss calculation;secondly,a two-stage multi-objective two-stage decentralised wind power siting and capacity allocation and reactive voltage optimisation control model is constructed to take account of the network loss correction,and the multi-objective multi-planning model is established in the first stage to consider the whole-life cycle investment cost of WTGs,the system operating cost and the voltage quality of power supply,and the multi-objective planning model is established in the second stage.planning model,and the second stage further develops the reactive voltage control strategy of WTGs on this basis,and obtains the distribution network loss reduction method based on WTG siting and capacity allocation and reactive power control strategy.Finally,the optimal configuration scheme is solved by the manta ray foraging optimisation(MRFO)algorithm,and the loss of each branch line and bus loss of the distribution network before and after the adoption of this loss reduction method is calculated by taking the IEEE33 distribution system as an example,which verifies the practicability and validity of the proposed method,and provides a reference introduction for decision-making for the distributed energy planning of the distribution network.
基金supported by the Innovation Fund of China Electric Power Institute(Project of Research on Reliability of Renewable Energy Generation Capacity based on Probability Prediction and Probabilistic Production Simulation).
文摘Research on wind power capacity credit at the operational level plays an important role in power system dispatching.With the popularity of energy storage devices,it is increasingly necessary to study the impact of energy storage devices on wind power operational capacity credit.The definition of wind power operational capacity credit is given.The available capacity model of different generators and the charging and discharging model of the energy storage are established.Based on the above model,the evaluation method of wind power operation credible capacity considering energy storage devices is proposed.The influence of energy storage on the wind power operation credible capacity is obtained by case study,which is of great help for the power system dispatching operation and wind power accommodation.
文摘With the advance in renewable generation technologies, the cost of renewable energy becomes increasingly competitive when compared to fossil fuel-based generation resources. It is economically beneficial to integrate large amounts of renewable capacity in power systems. Unlike traditional generation facilities, however, using renewable resources for generation presents technical challenges in producing continuous power. In this report, an Energy Storage System (ESS) is integrated to smooth the variations in renewable power production and ensure the output power more controllable. Since it requires capital investment for the storage devices, it is important to obtain reasonable estimate of the storage capacities. This project is therefore formulated as an optimization problem in determining the two dominating factors of the capital cost for the ESS: the power capacity and the energy capacity. The objective is to make the renewable power more reliable and simultaneously maximize the economic benefits that can be obtained from the scheme. To make the results more convincing, analyses in this report start with wind generation, for wind has greater variability and unpredictability than other renewable sources. Selection of ESS type is narrowed down to battery energy storage system (BESS) in the scheme. However, the methods presented here are suitable for any type of energy storage methods and are also useful for intermittent renewable energy resources other than wind.
基金support of The National Key Research and Development Program of China(Basic Research Class)(No.2017YFB0903000)the National Natural Science Foundation of China(No.U1909201)。
文摘Since the connection of small-scale wind farms to distribution networks,power grid voltage stability has been reduced with increasing wind penetration in recent years,owing to the variable reactive power consumption of wind generators.In this study,a two-stage reactive power optimization method based on the alternating direction method of multipliers(ADMM)algorithm is proposed for achieving optimal reactive power dispatch in wind farm-integrated distribution systems.Unlike existing optimal reactive power control methods,the proposed method enables distributed reactive power flow optimization with a two-stage optimization structure.Furthermore,under the partition concept,the consensus protocol is not needed to solve the optimization problems.In this method,the influence of the wake effect of each wind turbine is also considered in the control design.Simulation results for a mid-voltage distribution system based on MATLAB verified the effectiveness of the proposed method.
文摘The 10-GW-class Jiuquan Wind Power Base in Gansu Province is to get its Phase I Project completed soon, and will further expand and become the world largest wind power base in the future. Whether electricity from the wind power base can be delivered on such a large scale becomes the focus of attention of the world. This paper analyzes four challenges facing the wind power base, including transmission capability, peak regulation and frequency modulation, capacity balance and generation accommodation, as well as system stability.
文摘The wind power generation is increasing in many countries as a result of decreasing technology costs, active government policies for renewable energy sources, environmental concerns, etc.. This paper investigates the impact of wind power generation on ATC (available transmission capacity) calculation. In order to determine the maximum incremental MW transfer possible between two parts of a power system without violating any specified limits, ATCs are calculated. When calculating ATC values, it is necessary to assume production and consumption pattern in power system. Production of wind power depends on the wind speed, which is a random variable and it is impossible to forecast exactly the production of wind power that is needed for the ATCs calculation. In order to investigate influence of the stochastic wind power production on the ATCs value, computer model of Croatian electric power system is made in Power World Simulator. ATCs are calculated for southern part of Croatian power system in which besides wind power, hydro power plants are only type of power generation. Available wind speed measurements are used as input data for wind power production. The results of the ATC calculation for different scenario of wind power production and location in the Southern Croatian power system are presented and discussed in the paper.
文摘Economic issue is the very focus of China's wind power development.Although all the security problems can be dealt with through technical measures,the compensation for supportive thermal power units and the subsidy from economically developed regions to resource-outputting regions would require a higher level of strategic considerations.The core purpose of developing wind energy is to reduce pollutant emissions,so planners should take into account the overall cost of all sides,without touching the bottom of social affordability.