期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Geological Environment Problems Caused by Controlling Groundwater Exploitation in Jiangyin City 被引量:3
1
作者 DENG Qing-hai MA Feng-shan +1 位作者 YUAN Ren-mao YAO Bing-kui 《Journal of China University of Mining and Technology》 EI 2007年第1期85-89,共5页
Geological environment effects caused by the control of groundwater exploitation in Jiangyin city are discussed thoroughly, including the dynamic variation of groundwater levels and quality and the development of land... Geological environment effects caused by the control of groundwater exploitation in Jiangyin city are discussed thoroughly, including the dynamic variation of groundwater levels and quality and the development of land sub-sidence and ground fissures. According to the dynamic characteristics of groundwater levels, some advice about groundwater exploitation is offered. Our research will provide a basis for using groundwater resources and the preven- tion of geological disasters in Jiangyin city and the Suzhou-Wuxi-Changzhou area. The following results are deduced from our research. First, groundwater levels vary with the exploitation of groundwater in Jiangyin city and are affected by hydrogeological conditions. The groundwater levels remained rather stable before and after the implementation of control of groundwater exploitation in the northwest of Jiangyin city along the Yangtze River. A suitable level of exploitation should be allowed. In the southeast, the speed of recovery of the groundwater level has been rather rapid after the control of exploitation. We conclude that groundwater might be exploited locally after the groundwater level has recovered. In the southwest, the speed of recovery of the groundwater level is rather slow and exploitation of ground-water should be prohibited. Second, groundwater quality is stable in Jiangyin city and the contents of the main chemical indices of groundwater varied only slightly before and after the control of exploitation. Third, after controlling the exploitation, the speed of land subsidence has clearly slowed down and the development of ground fissures has been controlled effectively. 展开更多
关键词 controlling groundwater exploitation dynamic effects geological environment effects Jiangyin city
下载PDF
Optimizing control of groundwater table and rational allocation of water resources of east groundwater funnel area in Shengyang city
2
《Global Geology》 1998年第1期103-103,共1页
关键词 area Optimizing control of groundwater table and rational allocation of water resources of east groundwater funnel area in Shengyang city
下载PDF
Environmental effects of groundwater overdraft and its control
3
《Global Geology》 1998年第1期19-20,共2页
关键词 Environmental effects of groundwater overdraft and its control
下载PDF
Direct shear tests on cemented paste backfill-rock wall and cemented paste backfill-backfill interfaces 被引量:22
4
作者 Nabassé J.F.Koupouli Tikou Belem +1 位作者 Patrice Rivard Hervé Effenguet 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2016年第4期472-479,共8页
Even though a large number of large-scale arch dams with height larger than 200 m have been built in the world, the transient groundwater flow behaviors and the seepage control effects in the dam foundations under dif... Even though a large number of large-scale arch dams with height larger than 200 m have been built in the world, the transient groundwater flow behaviors and the seepage control effects in the dam foundations under difficult geological conditions are rarely reported. This paper presents a case study on the transient groundwater flow behaviors in the rock foundation of Jinping I double-curvature arch dam, the world's highest dam of this type to date that has been completed. Taking into account the geological settings at the site, an inverse modeling technique utilizing the time series measurements of both hydraulic head and discharge was adopted to back-calculate the permeability of the foundation rocks,which effectively improves the uniqueness and reliability of the inverse modeling results. The transient seepage flow in the dam foundation during the reservoir impounding was then modeled with a parabolic variational inequality(PVI) method. The distribution of pore water pressure, the amount of leakage, and the performance of the seepage control system in the dam foundation during the entire impounding process were finally illustrated with the numerical results. 展开更多
关键词 Jinping I arch dam Inverse modeling Hydraulic conductivity Fractured rock groundwater flow Seepage control
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部