期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
A Pull-Out Test Study on the Working State of Fully Grouted Bolts 被引量:1
1
作者 Ruixin Zhao Zhongju Feng +4 位作者 Guan Jiang Fuchun Wang Yidong Zhang Changan Zhang Zhenbing Wang 《Fluid Dynamics & Materials Processing》 EI 2021年第2期441-453,共13页
The present study examines the working conditions of fully grouted bolts used for the construction and expansion of high slopes.On the basis of a pull out destructive test,the work load and the ultimate load are obtai... The present study examines the working conditions of fully grouted bolts used for the construction and expansion of high slopes.On the basis of a pull out destructive test,the work load and the ultimate load are obtained on site,and the Flac3d numerical simulation method is employed to determine the axial force distribution and the effective anchor length.The test results show that(1)the Q-S(load-displacement)curve of the bolt displays a certain degree of deformation coupled with the creep of the surrounding rock;(2)the working load of the bolt is closely related to the sliding deformation trend of the slope,while the ultimate load depends on the design parameters of the bolt and the lithology of the slope;(3)the distribution of bolt axial force is characterized by a single peak along the bolt length and the effective anchorage length of the bolt is 3 m;(4)after 20 years,the bolt’s ultimate load has a maximum loss of 31.94%. 展开更多
关键词 Geotechnical engineering highway slope full length grouted anchor destructive test stress loss
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部