The paper summarizes the structure and water-absorbing mechanism,classification,and preparation method of polymer fire extinguishing gel,and prospects for its application in aerial firefighting,forest ground fire exti...The paper summarizes the structure and water-absorbing mechanism,classification,and preparation method of polymer fire extinguishing gel,and prospects for its application in aerial firefighting,forest ground fire extinguishing,opening of firebreaks,and mitigating human casualties in forest fire extinguishing.展开更多
According to the principle of effective stress action of rock and soil, we established a mechanical model of water flooding into roadways,analyzed the constitutive relation of hydrodynamic pressure and contact pressur...According to the principle of effective stress action of rock and soil, we established a mechanical model of water flooding into roadways,analyzed the constitutive relation of hydrodynamic pressure and contact pressure of rock and soil and discovered that the process of pre-grouting of a roadway curtain is a dynamically balancing process in which effective stress keeps gradually in- creasing and pore water pressure gradually declines. In such a grouting process, the initial water plugging effect is realized when the effective stress and total stress reaches equilibrium. A rigid-flexible packing layer is designed behind the brickwork to increase the effective stress and reduce pore water pressure in order to have a permanent water proof performance. This provides a theoretical basis for roadway driving and permanent water prevention. The monitoring and application results show that the initial and perma- nent waterproof theory has provided an effective method for roadway driving and making it waterproof.展开更多
基金Central Finance Forestry Science and Technology Promotion Demonstration Project(H[2023]TG31).
文摘The paper summarizes the structure and water-absorbing mechanism,classification,and preparation method of polymer fire extinguishing gel,and prospects for its application in aerial firefighting,forest ground fire extinguishing,opening of firebreaks,and mitigating human casualties in forest fire extinguishing.
基金Projects 50774078 supported by the National Natural Science Foundation of China 2007CB209400 by the National Basic Research Program of China
文摘According to the principle of effective stress action of rock and soil, we established a mechanical model of water flooding into roadways,analyzed the constitutive relation of hydrodynamic pressure and contact pressure of rock and soil and discovered that the process of pre-grouting of a roadway curtain is a dynamically balancing process in which effective stress keeps gradually in- creasing and pore water pressure gradually declines. In such a grouting process, the initial water plugging effect is realized when the effective stress and total stress reaches equilibrium. A rigid-flexible packing layer is designed behind the brickwork to increase the effective stress and reduce pore water pressure in order to have a permanent water proof performance. This provides a theoretical basis for roadway driving and permanent water prevention. The monitoring and application results show that the initial and perma- nent waterproof theory has provided an effective method for roadway driving and making it waterproof.