The output of new energy represented by wind power and photovoltaic power features volatility and randomness. It is a practical approach to use the guaranteed rate with statistical characteristics to analyze the outpu...The output of new energy represented by wind power and photovoltaic power features volatility and randomness. It is a practical approach to use the guaranteed rate with statistical characteristics to analyze the output coefficient of new energy. However, there is a lack of analysis and demonstration on the value of the new energy output guaranteed rate. To solve this problem, a selection method for the new energy output guaranteed rate considering optimal energy storage configuration is proposed. First, the influence of the new energy output guaranteed rate on the new energy output coefficient is analyzed. Secondly, with the goal of minimizing the comprehensive costs, an optimal configuration model of energy storage based on the output guaranteed rate of new energy is constructed, and particle swarm optimization is used for the optimization solution. Then, according to the optimal energy storage configuration results under different guaranteed rates, a reasonable new energy output guaranteed rate is determined by maximizing the comprehensive benefits obtained from energy storage. Finally, an example applied to the power grid in an area of Guangdong in Southern China is provided to illustrate the effectiveness of the proposed method.展开更多
The antifreeze critical strength and the pre-curing time of low-temperature concrete were studied by means of guaranteed rate of compressive strength and antifreeze performance for the structural safety requirement of...The antifreeze critical strength and the pre-curing time of low-temperature concrete were studied by means of guaranteed rate of compressive strength and antifreeze performance for the structural safety requirement of concrete engineering,suffering once freeze damage under air environment.It is shown that the antifreeze critical strength is 3.7-4.4MPa,pre-curing time is 18-32 h by guaranteed rate of compressive strength,and the antifreeze critical strength is 3.7-4.4MPa,pre-curing time is 18-32 h by guaranteed rate of antifreeze performance.It can be found that the method of guaranteed rate of compressive strength is sensitive to the defect which generated by freeze damage in the concrete interior.The method is fit to evaluate the antifreeze critical strength of low-temperature concrete.展开更多
The design lowest navigable water level is a primary index to the channel grade division.But differ- ent method can get different calculated result,and that even brings contradiction to decide the navigation grade.In ...The design lowest navigable water level is a primary index to the channel grade division.But differ- ent method can get different calculated result,and that even brings contradiction to decide the navigation grade.In this paper the differences between guaranteed rate method and guaranteed rate-frequency method on the fundamental concept of guaranteed rate and the calculated result are carried out.According to the theoreti- cal expression forms of the two methods,the reason leading to the difference is an...展开更多
To guarantee secure information transmission within two sources,a full-duplex(FD)relay jamming scheme for two-way energy harvesting(EH)cooperative networks is proposed,in which the relay can achieve simultaneous infor...To guarantee secure information transmission within two sources,a full-duplex(FD)relay jamming scheme for two-way energy harvesting(EH)cooperative networks is proposed,in which the relay can achieve simultaneous information reception and jamming transmission.The EH relay node scavenges energy from two source signals,and then,uses the harvested energy for information relaying and jamming transmission by the power splitting(PS)protocol.Considering multiple eavesdroppers,the nonconvex optimization for maximizing the smaller bidirectional secrecy rates is formulated by jointly optimizing the power allocation and PS factor.Furthermore,an iterative algorithm based on successive convex approximation and alternate search method is proposed to solve this non-convexity.Simulation results verify the proposed iterative algorithm and show that the proposed jamming scheme can achieve substantial performance gain than other conventional schemes.展开更多
Based on the 1951-2007 thunderstorms in Jiangsu,a study is conducted for their climate trends,periodicity,spatiotemporal patterns,and the distributions of the first and last days of the thunderstorms at different guar...Based on the 1951-2007 thunderstorms in Jiangsu,a study is conducted for their climate trends,periodicity,spatiotemporal patterns,and the distributions of the first and last days of the thunderstorms at different guarantee rates (GRs) using climate tendency rate,wavelet analysis,and GR for diagnosis.Results suggest that the inter-annual number of thunderstorm days (TSDs) exhibits a decreasing trend in this province.The trend is displayed mainly in the decreasing TSD number in summer and autumn except in spring,when the variation is not significant in the study period.In this province,the TSD number declines by ~2 days per 10 years.On an inter-annual basis,the pronounced positive departures of the number take place chiefly in the early 1960s,the late 1960s to the early-mid-1970s,the late 1980s,and the late 1990s compared with the negative anomalies dominant in the late 1970s to the mid-1980s,the mid-to-late-1990s,and the late 1990s to 2007.There are vast differences in the initial and ending days at diverse GRs in different areas of the province.At 50% GR,the earliest (last) days occur from mid-March to early April (early to late September) while at 80% GR,the initial (last) days are from late March to early May (early to late October).For the distribution of periods,the periods >8-10 years are relatively stable for the entire province.Based on 1951-2007 period analysis,the region north (south) of the Huaihe River experiences TSDs less (more) than normal days in recent years.展开更多
Aquatic ecosystems require ecological water allocation to prevent from being damaged by natural disasters and undue exploitation. This paper discusses and estimates the ecological water requirements (EWRs) of typica...Aquatic ecosystems require ecological water allocation to prevent from being damaged by natural disasters and undue exploitation. This paper discusses and estimates the ecological water requirements (EWRs) of typical areas in the Huaihe Basin to determine rational allocations of water resources and pro- mote regional improvements of the ecological environment. The main river course, including Hongze Lake and Nansi Lake, was selected as the study subject. Calculational methods for the river and lake EWRs were based on the reasonableness of the results and data availability. The monthly guarantee rate method was used to calculate monthly, flood period, non-flood period, and annual EWRs for the main river course and the main tributaries at two different guarantee rates. The minimum water level method was used to calculate annual EWRs for Hongze Lake and the upper and lower Nansi Lake of 1.521×10^9 m^3, 0.637×10^9 m^3, and 0.306×10^9 m^3. The results were used to evaluate the rationality of the quantity of water resources allocated to ecological uses in the Huaihe Basin during 1998-2003. The result shows that the present water resource allocations in the Huaihe Basin cannot satisfy the basic ecological requirements for some years, especially years with less precipitation.展开更多
This paper details on the uplink scheduling algorithm for long term evolution advanced (LTE-A) system with relays. While emulating quality of service (QoS)-aware services with different bit-rate and delay budget r...This paper details on the uplink scheduling algorithm for long term evolution advanced (LTE-A) system with relays. While emulating quality of service (QoS)-aware services with different bit-rate and delay budget requirements for the upstream direction, a new QoS-aware scheduling algorithm for in-band relays is proposed. In this work, an improved scheduling metric calculation method and bit-rate guarantee scheme is applied. Moreover, this algorithm proposes an efficient scheme for the backhaul link allocation which allows information of the most backlogged users to be transmitted first. Finally, this paper concludes with simulation results to demonstrate how the proposed resource allocation strategy improves the performance of the system.展开更多
基金supported by Science and Technology Project of China Southern Power Grid Company Limited(No.037700KK52190011(GDKJXM20198273)).
文摘The output of new energy represented by wind power and photovoltaic power features volatility and randomness. It is a practical approach to use the guaranteed rate with statistical characteristics to analyze the output coefficient of new energy. However, there is a lack of analysis and demonstration on the value of the new energy output guaranteed rate. To solve this problem, a selection method for the new energy output guaranteed rate considering optimal energy storage configuration is proposed. First, the influence of the new energy output guaranteed rate on the new energy output coefficient is analyzed. Secondly, with the goal of minimizing the comprehensive costs, an optimal configuration model of energy storage based on the output guaranteed rate of new energy is constructed, and particle swarm optimization is used for the optimization solution. Then, according to the optimal energy storage configuration results under different guaranteed rates, a reasonable new energy output guaranteed rate is determined by maximizing the comprehensive benefits obtained from energy storage. Finally, an example applied to the power grid in an area of Guangdong in Southern China is provided to illustrate the effectiveness of the proposed method.
基金Funded by the National Key Technology R&D Program of China for the 11th Five-Year Plan(2006BAJ04A04)the Natural Science Foundation Project of Liaoning Province(20082008)the Nationd Natural Science Foundation of China(51072122)
文摘The antifreeze critical strength and the pre-curing time of low-temperature concrete were studied by means of guaranteed rate of compressive strength and antifreeze performance for the structural safety requirement of concrete engineering,suffering once freeze damage under air environment.It is shown that the antifreeze critical strength is 3.7-4.4MPa,pre-curing time is 18-32 h by guaranteed rate of compressive strength,and the antifreeze critical strength is 3.7-4.4MPa,pre-curing time is 18-32 h by guaranteed rate of antifreeze performance.It can be found that the method of guaranteed rate of compressive strength is sensitive to the defect which generated by freeze damage in the concrete interior.The method is fit to evaluate the antifreeze critical strength of low-temperature concrete.
基金Supported by the National Key Basic Resarch and Development Plan (Grant 2003CB415200)
文摘The design lowest navigable water level is a primary index to the channel grade division.But differ- ent method can get different calculated result,and that even brings contradiction to decide the navigation grade.In this paper the differences between guaranteed rate method and guaranteed rate-frequency method on the fundamental concept of guaranteed rate and the calculated result are carried out.According to the theoreti- cal expression forms of the two methods,the reason leading to the difference is an...
基金supported in part by the National Nature Science Foundation of China under Grant 61473066 and Grant 61601109the Fundamental Research Funds for the Central Universities under Grant No.N152305001the Natural Science Foundation of Hebei Province under Grant F2017501039.
文摘To guarantee secure information transmission within two sources,a full-duplex(FD)relay jamming scheme for two-way energy harvesting(EH)cooperative networks is proposed,in which the relay can achieve simultaneous information reception and jamming transmission.The EH relay node scavenges energy from two source signals,and then,uses the harvested energy for information relaying and jamming transmission by the power splitting(PS)protocol.Considering multiple eavesdroppers,the nonconvex optimization for maximizing the smaller bidirectional secrecy rates is formulated by jointly optimizing the power allocation and PS factor.Furthermore,an iterative algorithm based on successive convex approximation and alternate search method is proposed to solve this non-convexity.Simulation results verify the proposed iterative algorithm and show that the proposed jamming scheme can achieve substantial performance gain than other conventional schemes.
基金Social Development Program of Jiangsu Science and Technology (BS2007088)
文摘Based on the 1951-2007 thunderstorms in Jiangsu,a study is conducted for their climate trends,periodicity,spatiotemporal patterns,and the distributions of the first and last days of the thunderstorms at different guarantee rates (GRs) using climate tendency rate,wavelet analysis,and GR for diagnosis.Results suggest that the inter-annual number of thunderstorm days (TSDs) exhibits a decreasing trend in this province.The trend is displayed mainly in the decreasing TSD number in summer and autumn except in spring,when the variation is not significant in the study period.In this province,the TSD number declines by ~2 days per 10 years.On an inter-annual basis,the pronounced positive departures of the number take place chiefly in the early 1960s,the late 1960s to the early-mid-1970s,the late 1980s,and the late 1990s compared with the negative anomalies dominant in the late 1970s to the mid-1980s,the mid-to-late-1990s,and the late 1990s to 2007.There are vast differences in the initial and ending days at diverse GRs in different areas of the province.At 50% GR,the earliest (last) days occur from mid-March to early April (early to late September) while at 80% GR,the initial (last) days are from late March to early May (early to late October).For the distribution of periods,the periods >8-10 years are relatively stable for the entire province.Based on 1951-2007 period analysis,the region north (south) of the Huaihe River experiences TSDs less (more) than normal days in recent years.
基金the National Key Basic Research and Development (973) Program of China (No. 2006CB403407)
文摘Aquatic ecosystems require ecological water allocation to prevent from being damaged by natural disasters and undue exploitation. This paper discusses and estimates the ecological water requirements (EWRs) of typical areas in the Huaihe Basin to determine rational allocations of water resources and pro- mote regional improvements of the ecological environment. The main river course, including Hongze Lake and Nansi Lake, was selected as the study subject. Calculational methods for the river and lake EWRs were based on the reasonableness of the results and data availability. The monthly guarantee rate method was used to calculate monthly, flood period, non-flood period, and annual EWRs for the main river course and the main tributaries at two different guarantee rates. The minimum water level method was used to calculate annual EWRs for Hongze Lake and the upper and lower Nansi Lake of 1.521×10^9 m^3, 0.637×10^9 m^3, and 0.306×10^9 m^3. The results were used to evaluate the rationality of the quantity of water resources allocated to ecological uses in the Huaihe Basin during 1998-2003. The result shows that the present water resource allocations in the Huaihe Basin cannot satisfy the basic ecological requirements for some years, especially years with less precipitation.
基金supported by the Major National Science & Technology Specific Project of China (2010ZX03002-002-03)
文摘This paper details on the uplink scheduling algorithm for long term evolution advanced (LTE-A) system with relays. While emulating quality of service (QoS)-aware services with different bit-rate and delay budget requirements for the upstream direction, a new QoS-aware scheduling algorithm for in-band relays is proposed. In this work, an improved scheduling metric calculation method and bit-rate guarantee scheme is applied. Moreover, this algorithm proposes an efficient scheme for the backhaul link allocation which allows information of the most backlogged users to be transmitted first. Finally, this paper concludes with simulation results to demonstrate how the proposed resource allocation strategy improves the performance of the system.