The stability of the ancient flood control levees is mainly influenced by water level fluctuations, groundwater concentration and rainfalls. This paper takes the Lanxi ancient levee as a research object to study the e...The stability of the ancient flood control levees is mainly influenced by water level fluctuations, groundwater concentration and rainfalls. This paper takes the Lanxi ancient levee as a research object to study the evolution laws of its seepage, displacement and stability before and after reinforcement with the upside-down hanging wells and grouting curtain through numerical simulation methods combined with experiments and observations. The study results indicate that the filled soil is less affected by water level fluctuations and groundwater concentration after reinforcement. A high groundwater level is detrimental to the levee's long-term stability, and the drainage issues need to be fully considered. The deformation of the reinforced levee is effectively controlled since the fill deformation is mainly borne by the upside-down hanging wells. The safety factors of the levee before reinforcement vary significantly with the water level. The minimum value of the safety factors is 0.886 during the water level decreasing period, indicating a very high risk of the instability. While it reached 1.478 after reinforcement, the stability of the ancient levee is improved by a large margin.展开更多
Objective:To compare the efficacy of anal adenectomy with virtual hanging wire and anal fistulotomy in the treatment of low anal fistula in infants and children.Methods:60 children with low anal fistula who were admit...Objective:To compare the efficacy of anal adenectomy with virtual hanging wire and anal fistulotomy in the treatment of low anal fistula in infants and children.Methods:60 children with low anal fistula who were admitted to our hospital from October 2021 to March 2022 and met the inclusion criteria were randomly divided into two groups of 30 cases each;the treatment group was treated with anal adenectomy and virtual hanging wire surgery,and the control group was treated with anal fistula resection.The clinical efficacy after treatment was compared.Results:The total effective rate of both groups was 96.67%and the difference between the two groups was not statistically significant(P>0.05).The postoperative pain score of the treatment group was lower than that of the control group(P<0.05).The length of hospitalization and healing time of the treatment group was lower than that of the control group(P<0.05).The anal function of the patients in both groups was normal,and there was no adverse reaction.Conclusion:Anal gland excision and virtual hanging surgery for the treatment of low anal fistula in infants and children have the advantages of mild pain,reduced length of hospitalization,short healing time,and better patient experience as compared to anal fistula excision.展开更多
Mining shovel is a crucial piece of equipment for high-efficiency production in open-pit mining and stands as one of the largest energy consumption sources in mining.However,substantial energy waste occurs during the ...Mining shovel is a crucial piece of equipment for high-efficiency production in open-pit mining and stands as one of the largest energy consumption sources in mining.However,substantial energy waste occurs during the descent of the hoisting system or the deceleration of the slewing platform.To reduce the energy loss,an innovative hydrau-lic-electric hybrid drive system is proposed,in which a hydraulic pump/motor connected with an accumulator is added to assist the electric motor to drive the hoisting system or slewing platform,recycling kinetic and potential energy.The utilization of the kinetic and potential energy reduces the energy loss and installed power of the min-ing shovel.Meanwhile,the reliability of the mining shovel pure electric drive system also can be increased.In this paper,the hydraulic-electric hybrid driving principle is introduced,a small-scale testbed is set up to verify the feasibil-ity of the system,and a co-simulation model of the proposed system is established to clarify the system operation and energy characteristics.The test and simulation results show that,by adopting the proposed system,compared with the traditional purely electric driving system,the peak power and energy consumption of the hoisting electric motor are reduced by 36.7%and 29.7%,respectively.Similarly,the slewing electric motor experiences a significant decrease in peak power by 86.9%and a reduction in energy consumption by 59.4%.The proposed system expands the application area of the hydraulic electric hybrid drive system and provides a reference for its application in over-sized and super heavy equipment.展开更多
为了解决装配式建筑吊装施工安全风险评估体系缺失、演化路径不清的共性问题,提高施工安全科学管理水平,提出了一种基于改进决策试验与实验室评估法(Decision Making Trial and Evaluation Laboratory,DEMATEL)的关键风险识别与演化路...为了解决装配式建筑吊装施工安全风险评估体系缺失、演化路径不清的共性问题,提高施工安全科学管理水平,提出了一种基于改进决策试验与实验室评估法(Decision Making Trial and Evaluation Laboratory,DEMATEL)的关键风险识别与演化路径分析方法。基于扎根理论构建装配式建筑吊装施工安全风险评价指标体系,利用基于组合数有序加权算子(Combination Ordered Weighted Averaging,C-OWA)改进直接影响矩阵,建立DEMATEL模型决策矩阵,并通过因果关系图识别关键风险因素,探究关键风险演化路径,以武汉市某工程项目为背景开展实证研究。结果表明:该项目存在X_(1)(工人的专业水平与素质差)、X_(5)(工人的技能培训与安全教育不到位)、X_(15)(人员没有进行定期的安全培训)、X_(18)(现场施工安全管理水平低)、X_(19)(风险意识缺乏)等关键风险因素;在4条基础路径和2条复合路径中,复合路径的权重高于基础路径,随着关键风险之间直接和间接作用的复杂化,发生风险事件的可能性将逐步增加;复合路径除了通过基础路径与关键风险耦合得到以外,还可以通过基础路径的相互作用演化得到。展开更多
基金the scientific research foundation of Zhejiang Provincial Natural Science Foundation of China (LTGG24E090002)Zhejiang University of Water Resources and Electric Power (xky2022013)+1 种基金Major Science and Technology Plan Project of Zhejiang Provincial Department of Water Resources (RA1904)the water conservancy management department, Zhejiang Design Institute of Water Conservancy and Hydro Electric Power Co., Ltd. and the construction company for their support。
文摘The stability of the ancient flood control levees is mainly influenced by water level fluctuations, groundwater concentration and rainfalls. This paper takes the Lanxi ancient levee as a research object to study the evolution laws of its seepage, displacement and stability before and after reinforcement with the upside-down hanging wells and grouting curtain through numerical simulation methods combined with experiments and observations. The study results indicate that the filled soil is less affected by water level fluctuations and groundwater concentration after reinforcement. A high groundwater level is detrimental to the levee's long-term stability, and the drainage issues need to be fully considered. The deformation of the reinforced levee is effectively controlled since the fill deformation is mainly borne by the upside-down hanging wells. The safety factors of the levee before reinforcement vary significantly with the water level. The minimum value of the safety factors is 0.886 during the water level decreasing period, indicating a very high risk of the instability. While it reached 1.478 after reinforcement, the stability of the ancient levee is improved by a large margin.
基金Xi’an Municipal Bureau of Science and Technology,No.21YXYJ0060。
文摘Objective:To compare the efficacy of anal adenectomy with virtual hanging wire and anal fistulotomy in the treatment of low anal fistula in infants and children.Methods:60 children with low anal fistula who were admitted to our hospital from October 2021 to March 2022 and met the inclusion criteria were randomly divided into two groups of 30 cases each;the treatment group was treated with anal adenectomy and virtual hanging wire surgery,and the control group was treated with anal fistula resection.The clinical efficacy after treatment was compared.Results:The total effective rate of both groups was 96.67%and the difference between the two groups was not statistically significant(P>0.05).The postoperative pain score of the treatment group was lower than that of the control group(P<0.05).The length of hospitalization and healing time of the treatment group was lower than that of the control group(P<0.05).The anal function of the patients in both groups was normal,and there was no adverse reaction.Conclusion:Anal gland excision and virtual hanging surgery for the treatment of low anal fistula in infants and children have the advantages of mild pain,reduced length of hospitalization,short healing time,and better patient experience as compared to anal fistula excision.
基金Supported by National Natural Science Foundation of China(Grant No.U1910211)National Key Research and Development Program of China(Grant No.2021YFB2011903).
文摘Mining shovel is a crucial piece of equipment for high-efficiency production in open-pit mining and stands as one of the largest energy consumption sources in mining.However,substantial energy waste occurs during the descent of the hoisting system or the deceleration of the slewing platform.To reduce the energy loss,an innovative hydrau-lic-electric hybrid drive system is proposed,in which a hydraulic pump/motor connected with an accumulator is added to assist the electric motor to drive the hoisting system or slewing platform,recycling kinetic and potential energy.The utilization of the kinetic and potential energy reduces the energy loss and installed power of the min-ing shovel.Meanwhile,the reliability of the mining shovel pure electric drive system also can be increased.In this paper,the hydraulic-electric hybrid driving principle is introduced,a small-scale testbed is set up to verify the feasibil-ity of the system,and a co-simulation model of the proposed system is established to clarify the system operation and energy characteristics.The test and simulation results show that,by adopting the proposed system,compared with the traditional purely electric driving system,the peak power and energy consumption of the hoisting electric motor are reduced by 36.7%and 29.7%,respectively.Similarly,the slewing electric motor experiences a significant decrease in peak power by 86.9%and a reduction in energy consumption by 59.4%.The proposed system expands the application area of the hydraulic electric hybrid drive system and provides a reference for its application in over-sized and super heavy equipment.
文摘为了解决装配式建筑吊装施工安全风险评估体系缺失、演化路径不清的共性问题,提高施工安全科学管理水平,提出了一种基于改进决策试验与实验室评估法(Decision Making Trial and Evaluation Laboratory,DEMATEL)的关键风险识别与演化路径分析方法。基于扎根理论构建装配式建筑吊装施工安全风险评价指标体系,利用基于组合数有序加权算子(Combination Ordered Weighted Averaging,C-OWA)改进直接影响矩阵,建立DEMATEL模型决策矩阵,并通过因果关系图识别关键风险因素,探究关键风险演化路径,以武汉市某工程项目为背景开展实证研究。结果表明:该项目存在X_(1)(工人的专业水平与素质差)、X_(5)(工人的技能培训与安全教育不到位)、X_(15)(人员没有进行定期的安全培训)、X_(18)(现场施工安全管理水平低)、X_(19)(风险意识缺乏)等关键风险因素;在4条基础路径和2条复合路径中,复合路径的权重高于基础路径,随着关键风险之间直接和间接作用的复杂化,发生风险事件的可能性将逐步增加;复合路径除了通过基础路径与关键风险耦合得到以外,还可以通过基础路径的相互作用演化得到。